Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VG.V ·

2021-10-05 -VG - News Release Shares issued 44,600,000 VG close - C$0.33c, W/C +$9 Million

Corporate Updates

200 Burrard Street, Suite 650 Tel: 604.801.5432

Vancouver, BC V6C 3L6 Fax: 604.662.8829

TSX-V: VG

FOR IMMEDIATE RELEASE OCTOBER 5, 2021

Volcanic Gold drills 1.53m @ 191.8 g/t Au and 539 g/t Ag at Holly

2021-10-05 -VG - News Release

Shares issued 44,600,000

VG close - C$0.33c, W/C +$9 Million

Vancouver, British Columbia – Volcanic Gold Mines Inc. (TSXV: VG) is pleased to report final results from

Holly drill holes HDD-21-017 through HDD-21-020 following receipt of the overlimit assays, and that the

drill is again turning at Holly. Drilling at Volcanic’s nearby Banderas project will start during the month of

October.

Holly Highlights:

HDD-21-017 from 134.25m to 143.08m returns 8.83m @ 8.81 g/t Au and 355 g/t Ag

HDD-21-019 from 28.97m to 30.50m returns 1.53m @ 191.8 g/t Au and 539 g/t Ag

And 171.90m to 178.42m returns 6.52m @ 11.72 g/t Au and 340 g/t Ag

HDD-21-020 from 61.70m to 67.10m returns 5.40m @ 4.38 g/t Au, 350 g/t Ag

Including 63.0m to 64.0m returns 1.00m @ 20.70 g/t Au and 1,616 g/t Ag

And 131.0m to 134.20m returns 3.20m @ 255 g/t Ag

Results from Holly continue to return high grade broad intercepts accompanied by high associated values

in path finder elements such as Mercury and Antimony. It is management’s belief that we are still high in

the epithermal system and the next round of drilling continues to step down the Jocotan Fault Brecc ia

testing this broader system at depth.

Within the Peña vein hanging wall, splay veins are producing spectacular results as shown by the bonanza

interval in HDD-21-019 returning 1.53m @ 191.8 g/t Au and 539 g/t Ag from 28.97m down hole. La Peña

is one of many north -south veins that cross the regional east-west Jocotan plate bounding fault system.

With growing understanding of the controls on mineralization at Holly , the program is consistently

intersecting the north-south Peña vein system within the wide Jocotan fault breccia, where gold-silver

grades are the highest. A major focus of the upcoming drilling will be to test the extensive breccia in the

plate bounding Jocotan fault.

-2-

Results are still pending from latest step out holes to the north and south. The initial step out hole to the

north, HDD21-015, returned 15.55m @ 7.67 g/t Au and 615 g/t Ag , and HDD21-017 to the south of the

Jocotan breccia (above) returned 8.83m @ 8.81 g/t Au and 355 Ag.

Figure 1. La Peña Zone; Long Section:

Note: Reported intervals are drilled width. True width is estimated at 80% of true width.

Technical Information

Bruce Smith, M.Sc. (Geology), a member of the Australian Institute of Geoscientists, is Volcanic ’s

Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Mr. Smith has 27 years of mineral exploration experience and has prepared and approved the technical

information contained in this news release.

Quality Assurance and Quality Control

Volcanic Gold follows industry standard procedures for diamond core drilling and analysis. Drilling is

carried out using NQ and HQ size tooling. Drill core is cut in half using a rock saw with one -half of the

core then taken as a sample for analysis. Sample intervals are generally 1m intervals, producing samples

of between 2 to 9 kg. Half-core samples are delivered to the internationally certified Bureau Veritas

Mineral laboratory facilities in Nicaragua where the samples are prepared. Assays are completed by

Bureau Veritas certified laboratories. The samples are fire assayed for Au and are analy zed for Ag and

multi-elements using method code ICP following a four-acid digestion. Overlimits are analyzed using an

-3-

appropriate method. Multi -element geochemical standards and blanks are rout inely entered into the

drill core sample stream to monitor laboratory performance. Quality control samples subm itted were

returned within acceptable limits.

Terms of Guatemala Radius Gold and Volcanic Gold Mines option

Pursuant to an option agreement signed in May 2020 with Radius Gold Inc. (TSXV:RDU), Volcanic can

earn a 60% interest in the Holly and Banderas pr ojects by spending the cumulative amount of US$7.0

million on exploration of the properties within 48 months from the date of the agreement. An initial

US$1M must be spent on exploration within the 12 months of receiving the required drill permits, which

expenditure will include a minimum 3,000m of drilling on the properties.

Following the exercise of the Option, Volcanic will enter into a standard 60/40 Joint Venture in order to

further develop the Properties. Volcanic has also been granted an exclusive right to evaluate all other

property interests of Radius in Guatemala with a right to acquire an interest in any or all other such

properties on reasonable terms.

About Volcanic

Volcanic brings together an experienced and successful mining, ex ploration and capital markets team

focused on building multi-million-ounce gold and silver resources in underexplored countries. Through

the strategic acquisition of mineral properties with demonstrated potential for hosting gold and silver

resources, and by undertaking effective exploration and drill programs, Volcanic intends to become a

leading gold-silver company.

For further information, visit our website at www.volgold.com.

Volcanic Gold Mines Inc.

Simon Ridgway, President and CEO

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts

responsibility for the adequacy or accuracy of this release.

Forward-looking statements

Certain statements contained in this news release constitute forward -looking statements within the meaning of

Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-

looking statements and include, without limit ation, statements about the Company’s plans for exploration work in

Guatemala. Often, but not always, these forward looking statements can be identified by the use of words such as

“estimate”, “estimates”, “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”,

“has been”, “gain”, “upgraded”, “offset”, “limited”, “contained”, “reflecting”, “containing”, “remaining”, “to be”,

“periodically”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including

negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause

the actual results, performance or achievements of the Company to be materially different from any results,

performance or achievements expressed or implied by forward -looking statements. Such uncertainties and factors

include, among others, whether the Company’s planned exploration work will be proceed as intended; changes in

-4-

general economic conditions and fina ncial markets; the Company or any joint venture partner not having the

financial ability to meet its exploration and development goals; risks associated with the results of exploration and

development activities, estimation of mineral resources and the geo logy, grade and continuity of mineral deposits;

unanticipated costs and expenses; and such other risks detailed from time to time in the Company’s quarterly and

annual filings with securities regulators and available under the Company’s profile on SEDAR at www.sedar.com.

Although the Company has attempted to identify important factors that could cause actual actions, events or results

to diffe r materially from those described in forward -looking statements, there may be other factors that cause

actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumpt ions, beliefs, expectations and opinions of

management, including but not limited to: that the Company’s stated goals and planned exploration and development

activities will be achieved; that there will be no material adverse change affecting the Company or its properties; and

such other assumptions as set out herein. Forward -looking statements are made as of the date hereof and the

Company disclaims any obligation to update any forward-looking statements, whether as a result of new information,

future events or results or otherwise, except as required by law. There can be no assurance that forward -looking

statements will prove to be accurate, as actual results and future events could differ materially from those anticipated

in such statements. Accordingly, investors should not place undue reliance on forward -looking statements.