Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VCG.V ·

Callinex Receives $250,000 Grant from Manitoba Mineral Development Fund

Corporate Updates

Callinex Receives $250,000 Grant from Manitoba Mineral

Development Fund

Highlights:

Callinex has received a

$250,000

grant from the Manitoba Mineral Development Fund ("MMDF") to advance the Pine Bay

Project;

Proceeds from grant will fund various long lead items to support permitting and future mine development;

Company has received over

$1m

in grants from MMDF to advance high-grade copper discoveries at Pine Bay since

2020; and

MMDF is aimed to jump-start mineral and economic development initiatives that capitalize on existing infrastructure.

VANCOUVER, BC

,

May 28, 2024

/CNW/ -

Callinex Mines Inc.

(the "Company" or "Callinex") (TSXV: CNX) (OTCQX: CLLXF) is

pleased to announce the Company has received a

$250,000

grant from the Manitoba Mineral Development Fund ("MMDF") to

complete long lead items to support permitting and future mine development at the 100% owned Pine Bay Project, located 16 kms

away from

Flin Flon, Manitoba

.

Chair of the MMDF,

Chuck Davidson

said, "We are extremely pleased with how Callinex has progressed the high-grade copper

discoveries at its Pine Bay Project" and went on to say "Callinex has been a great partner and we are glad to support their bold vision

to create prosperity within our province by supplying metals critical to our economy and the green energy transition. We look forward

to continuing to support them as their exciting project develops and hits critical milestones on their path to bringing jobs and a bright

future to the

Flin Flon

area."

Max Porterfield

, President and CEO, stated, "We are grateful for MMDF's generous grant and continued support, which has been

ongoing since our first exploration drill holes into the Rainbow deposit." he continued, "We are pleased that the

Manitoba

government

shares our vision at Pine Bay to create long-term jobs in the

Flin Flon

area while also strengthening the provincial economy."

On

July 10, 2023

, the Company announced a maiden mineral resource estimate consisting of

the Rainbow deposit with an Indicated

Mineral Resource of 3.44 Mt at 3.59% copper equivalent ("CuEq") containing 272.4 Mlb CuEq, an Inferred Mineral Resource

of 1.28 Mt at 2.95% CuEq containing 83.4 Mlb CuEq and the Pine Bay deposit with an Inferred Mineral Resource of 1.0 Mt at

2.62% Cu containing 58.1 Mlb Cu

.

Callinex continues to explore the Pine Bay Project for extensions to known deposits and especially for high potential large VMS

deposits in depth and along strike.

The MMDF was launched by the

Manitoba

government in 2020 with the specific goal of jump-starting mineral and economic

development initiatives throughout the province. The MMDF aims to support new economic development opportunities that capitalize

on existing assets across

Manitoba

.

Callinex is also pleased to announce that it has entered into an investor relations agreement with

Joseph Gray

whereby Mr. Gray will

provide investor relations and corporate communications services to Callinex. Under the terms of the agreement, Callinex has agreed

to pay Mr. Gray

$5,000

per month for a term of three months. Either party may terminate the agreement by providing the other party

with 30 days written notice. Mr. Gray is at arm's length with Callinex and does not own any securities of Callinex.

J.J. O'Donnell, P.Geo, a qualified person under National Instrument 43-101 and a Consulting Geologist for Callinex, has reviewed and

approved the technical information in this news release.

About Callinex Mines Inc.

Callinex Mines Inc.

(TSXV:

CNX

) (OTCQX

: CLLXF)

is advancing its portfolio of base and precious metals rich deposits located in

established Canadian mining jurisdictions. The focus of the portfolio is highlighted by the rapidly expanding Rainbow deposit at its

rich VMS Pine Bay Project located near existing infrastructure in the Flin Flon Mining District. Callinex prepared an indicated mineral

resource on the Rainbow deposit of 3.44 Mt grading 3.59% CuEq for 272.4 Mlb CuEq (238.3 Mlb Cu, 56.9 Mlb Zn, 37.6 koz Au,

692.8 koz Ag, 2.3 Mlb Pb), an inferred mineral resource on the Rainbow deposit of 1.28 Mt grading 2.95% CuEq containing 83.4

Mlb CuEq (72.1 Mlb Cu, 19.5 Mlb Zn, 11.1 koz Au, 222.2

Koz Ag

, 0.8 Mlb Pb) and an inferred mineral resource at the Pine Bay

deposit of 1.0 Mt grading 2.62% Cu containing 58.1 Mlb Cu (see news release dated

July 10, 2023

). The second asset in the

portfolio is the Nash Creek Project located in the VMS rich Bathurst Mining District of

New Brunswick

. A 2018 PEA generates a

strong economic return with a pre-tax IRR of 34.1% (25.2% post-tax) and NPV8% of

$230 million

(

$128 million

post-tax) at

$1.25

Zinc (see news release dated

May 14

, 2018). The third asset, 100% owned Point Leamington Deposit in

Newfoundland

, is located

in one of the richest VMS and Gold Districts in

Canada

. Callinex prepared a pit constrained Indicated Mineral Resource of 5.0 Mt

grading 2.5 g/t AuEq for 402 koz AuEq (145.7 koz gold, 60.0 Mlb copper, 153.5 Mlb zinc, 2.0 Moz silver, 1.5 Mlb lead), a pit

constrained Inferred Mineral Resource of 13.7 Mt grading 2.24 g/t AuEq for 986.5 koz AuEq (354.8 koz gold, 110.2 Mlb copper,

527.3 Mlb zinc, 6.2 Moz silver, 7.0 Mlb lead) and an out-of-pit Inferred Mineral Resource of 1.7 Mt grading 3.06 g/t AuEq for 168.5

koz AuEq (65.4 koz gold, 13.3 Mlb copper, 102.9 Mlb zinc, 1.4

Moz Ag

, 2.6 Mlb lead) (see news release dated

October 25, 2021

).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Some statements in this news release contain

forward-looking information. These statements include, but are not limited to, statements with respect to future expenditures. These

statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements to be materially different from any future results, performance or

achievements expressed or implied by the statements. Such factors include, among others, the ability to complete the proposed drill

program and the timing and amount of expenditures. Except as required under applicable securities laws, Callinex does not assume

the obligation to update any forward-looking statement

.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/callinex-receives-250-000-grant-from-manitoba-mineral-development-fund-302156423.html

SOURCE

Callinex Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/May2024/28/c5621.html

%SEDAR: 00031889E

For further information:

Callinex Mines Inc., Max Porterfield, President and Chief Executive Officer, Phone: (604) 605-0885, E-mail:

[email protected]

CO: Callinex Mines Inc.

CNW 06:30e 28-MAY-24