Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VCG.V ·

Callinex Intersects 5m of 8.35% CuEq and 9m of 3.72% CuEq with 145m Step-out from the Rainbow Discovery in the Flin Flon Mining District, MB

Drill Results

Callinex Intersects 5m of 8.35% CuEq and 9m of 3.72% CuEq with 145m

Step-out from the Rainbow Discovery in the Flin Flon Mining District, MB

Highlights:

PBM-113

intersected

5.00m

of 8.35% copper equivalent (CuEq) comprising of 8.08% copper, 0.20 g/t gold, 10.55 g/t silver and 0.13% zinc;

PBM-113 intersected a second interval of

4.0m

of 2.31% CuEq comprising of 2.21% copper, 0.09 g/t gold, 2.28 g/t silver and 0.04% zinc;

PBM-113 intersected a third interval of

9.06m

of 3.72% CuEq comprising of 2.37% copper, 0.70 g/t gold, 7.00 g/t silver and 2.10% zinc;

Interpretation of new Borehole Pulse Electromagnetic survey suggests mineralization comes within

350m

of surface; and

Two rigs are currently drilling to expand the discovery along strike and to surface.

VANCOUVER, BC

,

Nov. 16, 2020

/CNW/ -

Callinex Mines Inc.

(the "Company" or "Callinex") (TSXV: CNX) (OTC: CLLXF) is pleased to provide results from the

ongoing drilling campaign to expand the Rainbow Discovery at the 100% owned Pine Bay Project located in the Flin Flon Mining District of

Manitoba

(

See Figure 1

). The Rainbow Discovery has been made on Callinex's mineral lease, less than 250m from a high-voltage power-line and

550m

from a historic shaft with direct

road access to processing facilities in

Flin Flon, MB

(

See Figure 2

).

Drill hole PBM-113 intersected the following three high-grade intersections

145m

away (along strike and above) from the discovery hole PBM-111 (

See Figure 3

):

Orange Zone returned:

5.00m

of 8.35% copper equivalent (CuEq) comprising of 8.08% copper, 0.20 g/t gold, 10.55 g/t silver and 0.13% zinc

including

3.00m

of 12.13%

copper, 0.27 g/t gold, 15.62 g/t silver and 0.18% zinc

; an

4.00m

of 2.31% CuEq including 2.21% copper, 0.09 g/t gold, 2.28 g/t silver and 0.04% zinc.

Yellow Zone returned

9.06m

of 3.72% CuEq comprising of 2.37% copper, 0.70 g/t gold, 7.00 g/t silver and 2.10% zinc

including

3.75m

of 4.15% copper,

1.20 g/t gold, 11.87 g/t silver and 4.19% zinc.

Rainbow Discovery Long Section (Looking West) (CNW Group/Callinex Mines Inc.)

The Rainbow discovery hole, PBM-111, intersected

2.96 metres of 4.43% CuEq comprising of 3.09% copper, 0.75 g/t gold, 13.35 g/t silver, 1.88% zinc

(Yellow Zone) and a second interval of 4.31 metres of 4.32% CuEq comprising of 4.12% copper, 0.22 g/t gold, 2.21 g/t silver, 0.06% zinc (Orange Zone)

(

See News Release Dated

September 9, 2020

). The mineralization intersected in drill hole PBM-113 intersected significantly wider intervals and higher grades of

both base and precious metals.

Drill Hole PBM-112 intersected the Rainbow Horizon

345m

vertically above PBM-111 and went over the presumed plunge line when it crossed the Rainbow

horizon (Orange Zone). A subsequent Borehole Pulse Electromagnetic survey ("BPEM") survey completed on PBM-112 confirms this interpretation and suggests

the Rainbow Discovery possibly comes within

350m

of surface based on the modeled data.

Pine Bay Rainbow Discovery Plan View (CNW Group/Callinex Mines Inc.)

Two additional drill holes, PBM-113-W1 and PBM-114, have been completed with assays pending. Currently, two rigs are drilling step-out holes as the Company

delineates the Rainbow Discovery. Drill hole PBM-115 is currently being drilled to test ~75m along strike to the north of PBM-113. Additionally, a second wedge,

PBM-113-W2, has been started off PBM-113 to intersect ~60M vertically above PBM-113-W1. The two drill rigs will continue to operate to delineate the Rainbow

Discovery until mid-December for a brief holiday break and resume drilling in early January 2021.

Table 1: Pine Bay Drill Results

Drill Hole

From

(m)

To

(m)

Interval (m)

Cu

%

Au g/t

Ag

g/t

Zn

%

Sg

CuEq

%

PBM-112

(Orange Zone)

638.00

640.64

2.64

0.07

0.08

1.58

0.42

3.03

0.30

PBM-113

(Yellow Zone)

819.00

824.00

5.00

8.08

0.20

10.55

0.13

3.46

8.35

including

820.00

823.00

3.00

12.13

0.27

15.62

0.18

3.76

12.51

PBM-113

874.00

878.00

4.00

2.21

0.09

2.28

0.04

3.10

2.31

PBM-113

(Orange Zone)

891.44

900.50

9.06

2.37

0.70

7.00

2.10

3.64

3.72

including

894.75

898.50

3.75

4.15

1.20

11.87

4.19

4.07

6.68

Notes(1)(2)(3)(4):

1.

Dip and azimuth for hole PBM-112 is -80⁰ and 311⁰ Az. The 783m deep diamond drill hole is located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331352m East and 6071213m North. The collar

of the hole is 295m above sea level. The dip and azimuth for hole PBM-111 at its 650 metre mark is -39˚and 292˚ Az,. Dip and azimuth for hole PBM-113 is -83.5⁰ and 301⁰ Az. The 1045m deep diamond drill hole is located at the following Universal Transverse Mercator (UTM) coordinates

using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331402m East and 6071286m North. The collar of the hole is 298m above sea level. The dip and azimuth for hole PBM-113 at its 900 metre mark is -39˚and 292˚ Az

2.

True widths will require further drilling to determine.

3.

The size of the drill core is NQ.

4.

All CuEq (copper equivalent) assay results in this news release use the following pricing: US$3.00 copper per pound ($6,720/tonne), US$1.15 zinc per pound, US$1,450/troy ounce gold ($46.62/gram), US$16.50/toy ounce silver ($0.53/gram), calculation CuEQ= Cu%+(Zn% x zinc price

per pound / copper price per pound)+(Au g/t x Au price per gram / copper price per tonne) x100 + (Ag g/t x Ag price per gram / copper price per tonne) x 100. 100% metal recoveries used, ie no process recoveries or smelter payables were included in the calculation

J.J. O'Donnell, P.Geo, a qualified person under National Instrument 43-101, has reviewed and approved the technical information in this news release.

Figure 1: Flin Flon Mining District Region Overview

Figure 2: Plan View of the Rainbow Discovery at the Pine Bay Project

Figure 3: Pine Bay Long Section Looking West with 2020 Drilling

QA / QC Protocols

Individual samples were labeled, placed in plastic sample bags, and sealed. Groups of samples were then placed in security sealed bags and shipped directly to

SGS lab in

Vancouver, BC

for analysis. Samples were weighed then crushed to 75% passing 2mm and pulverized to 85% passing 75 microns in order to produce

a 250g pulverized split. 35 elements including copper, zinc, lead and silver assays were determined by Aqua Regia digestion with a combination of ICP-MS and

ICP-AES finish, with over limits rerun using an ore grade analysis (two acid digest ICP-AES). Gold was analyzed by fire assay. Specific gravity (sg) measured for

each sample using the pycnometer and water and air method. QA/QC included the insertion and continual monitoring of numerous standards, blanks, and

duplicates

About Callinex Mines Inc.

Callinex Mines Inc. (TSXV: CNX) (OTC: CLLXF) is advancing its portfolio of base and precious metals rich deposits located in established Canadian mining

jurisdictions. The portfolio is highlighted by the rapidly expanding Rainbow Discovery at its Pine Bay Project located near existing infrastructure in the Flin Flon

Mining District. Additionally, Callinex has emerging near-surface silver discoveries at its Nash Creek Project located in the Bathurst Mining District of

New

Brunswick

. A 2018 PEA on the Company's

Bathurst

projects outlined a mine plan that generates a strong economic return with a pre-tax IRR of 34.1% (25.2%

post-tax) and NPV8% of

$230 million

(

$128 million

post-tax).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

Some statements in this news release contain forward-looking information. These statements include, but are not limited to, statements with respect to future

expenditures. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or

implied by the statements. Such factors include, among others, the ability to complete the proposed drill program and the timing and amount of expenditures.

Except as required under applicable securities laws, Callinex does not assume the obligation to update any forward-looking statement

.

View original content to download multimedia:

http://www.prnewswire.com/news-releases/callinex-intersects-5m-of-8-35-cueq-and-9m-of-3-72-cueq-with-145m-step-out-from-the-rainbow-discovery-in-the-flin-flon-mining-district-mb-301173430.html

SOURCE

Callinex Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/November2020/16/c4589.html

%SEDAR: 00031889E

For further information:

Callinex Mines Inc., Max Porterfield, President and Chief Executive Officer, Phone: (604) 605-0885, E-mail: [email protected]

CO: Callinex Mines Inc.

CNW 08:00e 16-NOV-20