Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VCG.V ·

Callinex Intersects 33.67m of 4.29% Copper and Other High-Grade Intervals at the Rainbow Deposit located in the Flin Flon Mining District, MB

Drill Results

Callinex Intersects 33.67m of 4.29% Copper and Other High-Grade Intervals

at the Rainbow Deposit located in the Flin Flon Mining District, MB

Highlights:

PBM-177 intersected

33.67m

of 4.29% copper, 0.22 g/t gold, 4.63g/t silver and 0.31% zinc including

10.47m

of 5.90% copper,

14.43m

of 5% copper

and

7m

of 6.38% copper;

PBM-178 extends the Yellow zone with

7.40m

of 7.06% copper and infills the Orange zone with

8.45m

of 6.18% copper;

PBM-175 intersected

16m

of 2.85% copper, 0.24 g/t gold; and

PBM-176 expands the Orange and Yellow zones with

3.50m

of 2.99% copper eq. and

3m

of 1.96% copper eq.

VANCOUVER, BC

,

Sept. 19, 2022

/CNW/ -

Callinex Mines Inc.

(the "Company" or "Callinex") (TSXV: CNX) (OTCQX: CLLXF) is pleased to announce initial results

from of the fully funded 2022 exploration campaign to expand and delineate the high-grade copper, gold, silver and zinc Rainbow deposit (the "Rainbow") and test

new target areas. The Rainbow is located at the 100% owned Pine Bay Project within a mineral lease, less than

250m

from a high-voltage hydroelectric power-

line,

550m

from a historic shaft with direct road access to processing facilities in

Flin Flon, Manitoba

and 1.4km from the newly discovered Alchemist deposit (

Pine Bay Project Plan View

) (

See news release dated

September 7, 2022

).

Delineation drilling at Rainbow continues to impress with PBM-177 which intersected the Orange zone and returned

33.67m

of 4.29% copper

("Cu"), 0.22 g/t gold

("Au"), 4.63 g/t silver ("Ag"), 0.31% zinc ("Zn") or 4.60% copper equivalent ("CuEq")

including

10.47m

of 5.90% Cu,

14.43m

of 5% Cu and

7m

of 6.38% Cu

(

Rainbow Deposit Long Section

).

PBM-178-W1 expanded the Yellow zone with a step-out vertically above PBM-113-W2, which intersected

11.00m

of 2.43% Cu

, 0.24 g/t Au, 5.00 g/t Ag and 0.89

% Zn. or 2.98% CuEq which was followed by the Orange zone which returned

11.65m

of 2.44% Cu

, 0.22 g/t Au, 4.36 g/t Ag and 0.36% Zn or 2.76% CuEq.

Max Porterfield

, President and CEO, stated, "Drill results outlined today continue to deliver some of the widest intervals and highest copper grades intersected at

the Rainbow Deposit to date. We are incredibly pleased with the success of our step out drill holes to date, which has expanded the Rainbow Deposit in multiple

areas."

Drill hole PBM-176 was a significant step-out that expanded both the Orange and Yellow zones. PBM-176 intersected the Yellow zone and returned

3.00m

of

1.96% CuEq (1.86% Cu, 0.08 g/t Au, 4.19 g/t Ag,and 0.06% Zn) in a

75m

step-out from PBM-178-W1 and

95m

step-out from PBM-161-W2 that returned

6.50m

of 5.47% CuEq (4.48% Cu, 0.50 g/t Au, 9.06 g/t Ag and 1.48% Zn). PBM-176 intersected the Orange zone and returned

3.50m

of 2.99% CuEq (2.74% Cu, 0.19

g/t Au, 3.03 g/t Ag or 0.24% Zn) in a

82m

step-out to the south from PBM-131 which previously returned

20.53m

of 3.21% CuEq (2.58% Cu, 0.22 g/t Au, 6.63 g/t

Ag and 1.11% Zn).

Callinex Rainbow Deposit Long Section September 2022 (CNW Group/Callinex Mines Inc.)

JJ O'Donnell, Callinex Exploration Manager, stated, "Additional drilling into the Rainbow horizons has further defined the three massive sulphide lenses with widths

and grades similar to previous neighbor holes, suggesting good correlation within the mineralized horizons."

The Company has now completed the necessary drilling to delineate Rainbow within the first

800m

of surface in anticipation of publishing a maiden resource

estimate. Callinex completed 33 holes (including 6 wedges) encompassing

19,840m

of drilling at the Rainbow deposit as part of the fully funded drilling campaign.

Since the Company discovered the Rainbow Deposit in

August 2020

, the Company has drilled 81 holes (including 19 wedges) for a total of

42,000m

into the

deposit area. Callinex has 12 delineation drill holes pending at the assay lab encompassing

6,300m

of drilling into the Rainbow deposit area.

Callinex is currently completing the final exploration hole of the current exploration campaign to test Target Area Odin, which is located in between the Rainbow

and the newly discovered Alchemist deposits (

See news release Dated

September 7, 2022

). The Company has completed

8,500m

of exploration drilling as part

of the broader 2022 drilling campaign and has only announced

3,920m

encompassing 4 drill holes to date.

Pine Bay Project Plan View September 2022 (CNW Group/Callinex Mines Inc.)

Table 1: Pine Bay Drill Results to date

Drill Hole

Zone

From

(m)

To

(m)

Interval (m)

True Width

(m)

Cu

%

Au g/t

Ag g/t

Zn

%

Sg

CuEq

%

PBM-173-W1

Orange

627.0

632.0

5.00

4.08

3.51

0.44

6.84

0.55

3.91

4.08

PBM-174

Orange

545.55

550.5

4.95

4.76

2.12

0.54

10.17

1.33

3.86

3.08

PBM-174-W1

Orange

550.0

556.0

6.00

5.54

2.47

0.34

9.89

0.67

3.79

3.05

PBM-175

Orange

635.0

651.0

16.00

14.13

2.85

0.24

5.76

0.19

3.26

3.14

PBM-176

Orange

704.0

707.5

3.50

2.90

2.74

0.19

3.03

0.24

3.35

2.99

Yellow

672.0

675.0

3.00

2.49

1.86

0.08

4.19

0.06

3.15

1.96

PBM-177

Orange

636.33

670.0

33.67

29.81

4.29

0.22

4.63

0.31

3.61

4.60

Includes

636.33

646.80

10.47

9.33

5.90

0.30

7.44

0.19

3.75

6.24

Includes

654.80

669.23

14.43

12.86

5.00

0.21

4.31

0.28

3.83

5.29

Includes

660.0

667.0

7.00

6.24

6.38

0.24

4.83

0.10

3.99

6.63

PBM-178

Yellow

690.6

698.0

7.40

5.70

7.06

0.32

11.59

0.42

3.74

7.53

Orange

742.0

750.45

8.45

6.84

6.18

0.49

6.62

0.12

4.07

6.62

PBM-178-W1

Yellow

684.0

695.0

11.0

8.18

2.43

0.24

5.00

0.89

3.27

2.98

Orange

736.35

748.0

11.65

8.66

2.44

0.22

4.36

0.36

3.96

2.76

Notes:

1.

PBM-173-W1 collar is located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N 331378m East and6071255m North and 292.0m above sea level, and started at 290Az, -73 degree dip. PBM-174 and

PBM-174-W1 collars are located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331378m East and 6071255m North and 292.0m above sea level, and started at 292.3z, -65.4 degree dip. PBM-175

collar is located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331378m East and 6071255m North and 292.0m above sea level, and started at 298.6Az, -70.9 degree dip. PBM-176 collar is

located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331378m East and 6071255m North and 292.0m above sea level, and started at 291Az, -71degree dip. PBM-177 collar is located at the

following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331378m East and 6071255m North and 292.0m above sea level, and started at 300.5Az, -75 degree dip. PBM-178 and PBM-178-W1 collars are located at

the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 331378m East and 6071255m North and 292.0m above sea level, and started at 293.9Az, -74 degree dip.

2.

The size of the drill core is NQ.

3.

True Width calculations assumed the Rainbow Horizon to strike 032 degrees azimuth, with a 80 degree easterly dip.

4.

All CuEq (copper equivalent) assay results in this news release use the following pricing: US$3.00 copper per pound ($6,720/tonne), US$1.15 zinc per pound, US$1,450/troy ounce gold ($46.62/gram), US$16.50/toy ounce silver ($0.53/gram), calculation CuEQ= Cu%+(Zn% x zinc price

per pound / copper price per pound)+(Au g/t x Au price per gram / copper price per tonne) x100 + (Ag g/t x Ag price per gram / copper price per tonne) x 100. 100% metal recoveries used, ie. no process recoveries or smelter payables were included in the calculation.

J.J. O'Donnell, P.Geo, a qualified person under National Instrument 43-101, has reviewed and approved the technical information in this news release.

QA / QC Protocols

Individual samples were labeled, placed in plastic sample bags, and sealed. Groups of samples were then placed in security sealed bags and shipped directly to

SGS lab in

Vancouver, BC

for analysis. Samples were weighed then crushed to 75% passing 2mm and pulverized to 85% passing 75 microns in order to produce

a 250g pulverized split. 35 elements including copper, zinc, lead and silver assays were determined by Aqua Regia digestion with a combination of ICP-MS and

ICP-AES finish, with over limits rerun using an ore grade analysis (two acid digest ICP-AES). Gold was analyzed by fire assay. Specific gravity (sg) measured for

each sample using the pycnometer and water and air method. QA/QC included the insertion and continual monitoring of numerous standards, blanks, and

duplicates

About Callinex Mines Inc.

Callinex Mines Inc.

(TSXV:

CNX

) (OTCQX

: CLLXF)

is advancing its portfolio of base and precious metals rich deposits located in established Canadian

mining jurisdictions. The focus of the portfolio is highlighted by the rapidly expanding Rainbow and Alchemist deposits at its rich VMS Pine Bay Project located

near existing infrastructure in the Flin Flon Mining District. The second asset in the portfolio is the Nash Creek Project located in the VMS rich Bathurst Mining

District of

New Brunswick

. A 2018 PEA generates a strong economic return with a pre-tax IRR of 34.1% (25.2% post-tax) and NPV8% of

$230 million

(

$128

million

post-tax) at

$1.25

Zinc. The third asset, 100% owned Point Leamington Deposit in

Newfoundland

, is located in one of the richest VMS and Gold

Districts in

Canada

. Callinex prepared a pit constrained Indicated Mineral Resource of 5.0 Mt grading 2.5 g/t AuEq for 402 koz AuEq (145.7 koz gold, 60.0 Mlb

copper, 153.5 Mlb zinc, 2.0 Moz silver, 1.5 Mlb lead), an pit constrained Inferred Mineral Resource of 13.7 Mt grading 2.24 g/t AuEq for 986.5 koz AuEq (354.8

koz gold, 110.2 Mlb copper, 527.3 Mlb zinc, 6.2 Moz silver, 7.0 Mlb lead) and an out-of-pit Inferred Mineral Resource of 1.7 Mt grading 3.06 g/t AuEq for 168.5

koz AuEq (65.4 koz gold, 13.3 Mlb copper, 102.9 Mlb zinc, 1.4

Moz Ag

, 2.6 Mlb lead).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

Some statements in this news release contain forward-looking information. These statements include, but are not limited to, statements with respect to future

expenditures. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or

implied by the statements. Such factors include, among others, the ability to complete the proposed drill program and the timing and amount of expenditures.

Except as required under applicable securities laws, Callinex does not assume the obligation to update any forward-looking statement

.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/callinex-intersects-33-67m-of-4-29-copper-and-other-high-grade-intervals-at-the-rainbow-deposit-located-in-the-flin-flon-mining-district-mb-301626937.html

SOURCE

Callinex Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2022/19/c1052.html

%SEDAR: 00031889E

For further information:

Please contact: Callinex Mines Inc., Max Porterfield, President and Chief Executive Officer, Phone: (604) 605-0885, E-mail:

[email protected]

CO: Callinex Mines Inc.

CNW 08:30e 19-SEP-22