Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VCG.V ·

Callinex Defines Highly Conductive Target Off-hole from Copper, Zinc, Gold and Silver Bearing Massive Sulphides at Pine Bay Project, MB

Exploration Programs

Callinex Defines Highly Conductive Target Off-hole from Copper, Zinc, Gold

and Silver Bearing Massive Sulphides at Pine Bay Project, MB

Highlights:

Exploration along base of interpreted growth fault has intersected millrock and discovered a new copper, zinc, gold and silver bearing VMS

horizon;

Drill hole PBM-166 intersected

1.5m

of massive sulphides with elevated copper, zinc, gold and silver

;

A Borehole EM survey completed in PBM-166 identified a highly conductive

130m

by

400m

anomaly;

Geology where the anomaly is located is indicative of a possible repeat of the rock package that hosts the Rainbow deposit

; and

Targets are located in proximity to mapped Pine Root millrock; the 62 million ton

Flin Flon

deposit sits in proximity to Millrock Hill, an outcropping

of the same rock type in

Flin Flon, MB

.

VANCOUVER, BC

,

March 10, 2022

/CNW/ -

Callinex Mines Inc.

(the "Company" or "Callinex") (TSXV: CNX) (OTCQX: CLLXF) is pleased to announce additional

2022 exploration targets at the Company's 100% owned Pine Bay Project, located 16km away from processing facilities in the Flin Flon Mining District of

Manitoba

. The Company has identified a number of high priority targets from vectoring completed during the 2021 exploration campaign along the interpreted

growth fault corridor that hosts the emerging high-grade copper, gold, silver and zinc Rainbow deposit ("Rainbow") and five other deposits, three of which have

seen some level of historic production.

In Q4 2021 the Company began exploring within the growth fault corridor by drill testing a number of priority surface pulse electromagnetic ("SPEM") and airborne

versatile time domain electromagnetic ("VTEM") targets that off-set a regional formational conductor. It should be noted that the Rainbow Deposit, which was

discovered in 2020, flanks a separate formational conductor located to the east (

Pine Bay Plan View with VTEM and Borehole EM Anomalies

).

Pine Bay Plan View with VTEM and Borehole EM - March 2022 (CNW Group/Callinex Mines Inc.)

Max Porterfield

, President and CEO, stated, "These exciting targets sit at the base of the interpreted growth fault that hosts Rainbow and five other deposits to

the east. Similarly, the

Flin Flon

deposit sits in proximity to Millrock Hill, a well known outcropping at the base of the growth fault that hosts it as well as the

Callinan and 777 deposits. We are eager to immediately test the targets announced today in addition to the high priority targets recently identified by regional IP

and EM surveys in an upcoming drilling campaign."

Flin Flon Growth Fault Corridor (CNW Group/Callinex Mines Inc.)

Callinex focused on drilling targets that are proximal to the Pine Root River Millrock area that is interpreted to be the base of the growth fault corridor that hosts

the Rainbow, Pine Bay, Cabin, Baker Patton,

North Star

and Don Jon VMS deposits that sit to the east (

Plan View with Drill Traces and Mapped Millrock

).

Millrock is a term used to refer to talus breccia that occurs along major growth faults controlling volcanogenic massive sulphide ("VMS") deposits. The Pine Root

River Millrock area at Pine Bay is analogous to the Millrock Hill in

Flin Flon

(

Examples of Millrock Hill and Pine Root Millrock

). Millrock Hill is a well known outcrop

that sits immediately to the south of the 62 million ton Flin Flon Deposit that kick started the Flin Flon Mining District which has hosted 32 mines (

Flin Flon Growth Fault Corridor Plan View

).

Pine Bay Drilling Plan View with Borehole EM and Millrock March 2022 (CNW Group/Callinex Mines Inc.)

Pine Bay Pine Root Millrock Analogous to Millrock Hill (CNW Group/Callinex Mines Inc.)

JJ O'Donnell, Callinex Exploration Manager, stated, "With over 40,000 meters of drilling completed since the Rainbow discovery on the Pine Bay project, our

gained knowledge and understanding of the overall controls has given us the confidence that the 2,000 hectare Pine Bay Project will deliver additional positive

results. Further testing of the favorable geology, mineralization, and alteration noted in drill hole PBM-166 may generate a new VMS system for the Pine Bay

Project."

The geology intersected by drill holes PBM-160 and PBM-166 is indicative of a possible repeat of the rock package that hosts the Rainbow deposit and warrants

immediate follow-up drilling in 2022. Both holes were drilled approximately

240m

apart and collared into millrock (

Plan View with Mapped Millrock and Borehole EM Anomalies

). Most interesting, as the holes proceeded westerly the geology consists of very favorable felsic

volcanic sequences which could be the fold repeat of the Rainbow horizon that hosts the Rainbow. Drill hole PBM-166 intersected 1.5 meters of massive sulphides

with elevated copper, zinc gold and silver. Additionally, the mineralization is hosted within a chlorite altered brecciated felsic volcanic unit which makes this a very

high priority target area.

Alan Vowles

, member of Callinex's technical team, added, "In the case of the off-hole anomaly in PBM-166 with an extremely high CT, greater than 4000 siemens,

indicates strongly that the target must have both high conductivity and significant thickness."

A borehole pulse electromagnetic ("BPEM") survey completed in drill hole PBM-166 identified Anomaly A, a highly conductive

130m

by

400m

anomaly possessing

a conductivity thickness ("CT") of 4028 siemens (

See 3D View with Drill Traces and Anomaly A

). The formational conductor that flanks Anomaly A is made up of

mineralized siltstone and has a CT of 2462 siemens. Anomaly A sits off-hole of the base and precious metal bearing massive sulphides intersected in drill hole

PBM-166.

Pine Bay 3D View with Drill Traces and Borehole EM Anomaly A Looking West (CNW Group/Callinex Mines Inc.)

Drill hole PBM-162 also collared into the millrock followed by a favorable package of felsic volcanic rocks before being shut down in an intrusive gabbro unit. A

follow-up BPEM survey completed on PBM-162 identified Anomaly B, a large

600m

by

400m

off-hole anomaly that sits within the center of the mapped Pine Root

millrock. PBM-162 was later deepened but failed to intersect Anomaly B. A shallow hole is being planned to follow-up and drill test this target area near the

surface.

The Company plans to continue to delineate Rainbow within the first 1km of surface in anticipation of publishing a maiden resource later this year. Since the

Company discovered the Rainbow Deposit in

August 2020

, the Company has drilled 71 holes (including 15 wedges) for a total of

40,000m

into the deposit area.

Additionally, Callinex plans to immediately drill test the targets announced today as well as the high priority targets identified from new regional IP/EM surveys

completed along 5.5km of the trend that hosts the high-grade Rainbow deposit, Sourdough deposit and past-producing Centennial Mine (

See News Release dated

February 2, 2022

).

Callinex's Pine Bay Project encompasses the majority of the Baker Patton Complex (BPC), the largest exposed felsic (rhyolitic) volcanic accumulation in the

Flin

Flon

portion of the Flin Flon-Snow Lake Greenstone Belt (

Flin Flon Greenstone Belt Regional Geology

) . This is especially important since the majority of the VMS

deposits occurring within the Flin Flon Belt of

Saskatchewan

and

Manitoba

are almost always hosted by rhyolitic flows and volcaniclastic rocks within

predominantly mafic terranes. Of additional importance is that these felsic (rhyolitic) rocks only account for a small portion of the total volcanic pile (5-10%). Of

particular exploration interest to Callinex's Pine Bay Project, is the very large exposure of intensely altered (chloritic, sericitic and silicic alteration) felsic rocks that

have collectively been called the Baker Patton Alteration Zone, encompassing an area with a minimum of a

700m

by

1000m

footprint. A very large footwall

alteration system such as this would normally be expected to be accompanied by a large VMS system and has consequently been the target of many exploration

companies preceding Callinex.

Flin Flon Greenstone Belt Regional Geology Map March 2022 (CNW Group/Callinex Mines Inc.)

Table 1: Pine Bay Drill Results

Drill Hole

From

(m)

To

(m)

Interval (m)

Cu

%

Au g/t

Ag g/t

Zn

%

Sg

CuEq

%

PBM-166

617.0

618.5

1.50

0.11

0.12

2.44

0.44

3.81

0.39

Notes:

1. PBM-159 collar is located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 329374m East and 6070399m North and 320.0m above sea level, and started at 295Az, -60 degree dip. PBM-160 collar is

located at the following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 329721m East and 6070791m North and 322.0m above sea level, and started at 300Az, -55 degree dip. PBM-162 collar is located at the

following Universal Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 330052m East and 6070726m North and 292.0m above sea level, and started at 345Az, -75 degree dip. PBM-166 collar is located at the following Universal

Transverse Mercator (UTM) coordinates using the North American Datum of 1983 (NAD83) within UTM Zone 14N: 329568m East and 6070978m North and 324.0m above sea level, and started at 320Az, -52 degree dip. The Company completed exploration drill holes throughout its property that

did not encounter significant mineralization: PBM-159, 160 and 162.

2. The size of the drill core is NQ.

3. True Width calculations assumed the Rainbow Horizon to strike 032 degrees azimuth, with a 80 degree easterly dip.

4. All CuEq (copper equivalent) assay results in this news release use the following pricing: US$3.00 copper per pound ($6,720/tonne), US$1.15 zinc per pound, US$1,450/troy ounce gold ($46.62/gram), US$16.50/toy ounce silver ($0.53/gram), calculation CuEQ= Cu%+(Zn% x zinc price per

pound / copper price per pound)+(Au g/t x Au price per gram / copper price per tonne) x100 + (Ag g/t x Ag price per gram / copper price per tonne) x 100. 100% metal recoveries used, ie. no process recoveries or smelter payables were included in the calculation.

J.J. O'Donnell, P.Geo, a qualified person under National Instrument 43-101, has reviewed and approved the technical information in this news release.

QA / QC Protocols

Individual samples were labeled, placed in plastic sample bags, and sealed. Groups of samples were then placed in security sealed bags and shipped directly to

SGS lab in

Vancouver, BC

for analysis. Samples were weighed then crushed to 75% passing 2mm and pulverized to 85% passing 75 microns in order to produce

a 250g pulverized split. 35 elements including copper, zinc, lead and silver assays were determined by Aqua Regia digestion with a combination of ICP-MS and

ICP-AES finish, with over limits rerun using an ore grade analysis (two acid digest ICP-AES). Gold was analyzed by fire assay. Specific gravity (sg) measured for

each sample using the pycnometer and water and air method. QA/QC included the insertion and continual monitoring of numerous standards, blanks, and

duplicates

About Callinex Mines Inc.

Callinex Mines Inc.

(TSXV:

CNX

) (OTCQX

: CLLXF)

is advancing its portfolio of base and precious metals rich deposits located in established Canadian

mining jurisdictions. The focus of the portfolio is highlighted by the rapidly expanding Rainbow Discovery at its rich VMS Pine Bay Project located near existing

infrastructure in the Flin Flon Mining District. The second asset in the portfolio is the Nash Creek Project located in the VMS rich Bathurst Mining District of

New

Brunswick

. A 2018 PEA generates a strong economic return with a pre-tax IRR of 34.1% (25.2% post-tax) and NPV8% of

$230 million

(

$128 million

post-tax) at

$1.25

Zinc. The third asset, 100% owned Point Leamington Deposit in

Newfoundland

, is located in one of the richest VMS and Gold Districts in

Canada

.

Callinex prepared a pit constrained Indicated Mineral Resource of 5.0 Mt grading 2.5 g/t AuEq for 402 koz AuEq (145.7 koz gold, 60.0 Mlb copper, 153.5 Mlb

zinc, 2.0 Moz silver, 1.5 Mlb lead), an pit constrained Inferred Mineral Resource of 13.7 Mt grading 2.24 g/t AuEq for 986.5 koz AuEq (354.8 koz gold, 110.2

Mlb copper, 527.3 Mlb zinc, 6.2 Moz silver, 7.0 Mlb lead) and an out-of-pit Inferred Mineral Resource of 1.7 Mt grading 3.06 g/t AuEq for 168.5 koz AuEq (65.4

koz gold, 13.3 Mlb copper, 102.9 Mlb zinc, 1.4

Moz Ag

, 2.6 Mlb lead).

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

Some statements in this news release contain forward-looking information. These statements include, but are not limited to, statements with respect to future

expenditures. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or

implied by the statements. Such factors include, among others, the ability to complete the proposed drill program and the timing and amount of expenditures.

Except as required under applicable securities laws, Callinex does not assume the obligation to update any forward-looking statement

.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/callinex-defines-highly-conductive-target-off-hole-from-copper-zinc-gold-and-silver-bearing-massive-sulphides-at-pine-bay-project-mb-301500122.html

SOURCE

Callinex Mines Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2022/10/c3974.html

%SEDAR: 00031889E

For further information:

Callinex Mines Inc., Max Porterfield, President and Chief Executive Officer, Phone: (604) 605-0885, E-mail: [email protected]

CO: Callinex Mines Inc.

CNW 08:30e 10-MAR-22