Callinex Announces Acquisition to Expand its Headway Project in the Bathurst Mining District
Callinex Announces Acquisition to Expand its Headway Project in the
Bathurst Mining District
Highlights:
Executed a purchase agreement to acquire the Headway North claim, which hosts the Pabineau Deposit, that significantly expands the Company's
Headway Project;
The Headway Project shares a property boundary and similar geology with Glencore's Brunswick No 12 mine, previously the world's largest
underground zinc mine; and
Exploration has identified three high-priority drill targets and several untested near-surface electromagnetic anomalies.
VANCOUVER
, Feb. 28, 2019 /CNW/ -
Callinex Mines Inc.
(the "Company" or "Callinex") (TSXV: CNX) (OTC: CLLXF) is pleased to announce that it
has executed a purchase agreement to acquire the Headway North claim, which hosts the Pabineau Deposit, that significantly expands the Company's
Headway Project (the "Project") located in the Bathurst Mining District of
New Brunswick
(
See Figures
1, 2 and 3). The Headway Project shares a
property boundary and similar geology with Glencore's Brunswick No 12 mine, previously the world's largest underground zinc mine, where production
totalled 137 million tons grading 8.74% Zn, 3.44% Pb, 0.37% Cu, and 102 g/t Ag from 1964 to 2013.
Importantly, this acquisition further solidifies a land package that covers approximately 4 km of strike length along the prolific Brunswick Horizon and
encircled by mineral rights held by Glencore and Osisko Mining. Previous exploration has identified three high-priority drill targets and several untested
near-surface electromagnetic anomalies.
The Headway Project represents a compelling exploration opportunity with untested targets in the shadow of the world-class Brunswick No 12 Mine
and located within potential trucking distance to the Company's 100% owned Superjack and
Nash Creek
projects.
The Headway North claim also includes
$36,000
in existing work credits, from work previously completed by Nexa Resources S.A., which will allow for
the claims to remain in good standing until late-2024 without any additional exploration requirements.
The Company will issue the vendor 120,000 shares, representing an implied transaction value of
$12,000
, and a 1.0% NSR royalty, of which half can
be re-purchased for
$500,000
, subject to TSX Venture Exchange approval. Additionally, the Company has completed its previously announced
acquisition of the Headway Project (See News Release dated
November 14, 2018
).
J.J. O'Donnell, P.Geo, a qualified person under National Instrument 43-101 and a Consulting Geologist for Callinex, has reviewed and approved the
technical information in this news release.
Figure 1: Map of the Bathurst Mining District of
New Brunswick
Figure 2: Headway Project Location Map
Figure 3: Headway and Pabineau Deposits with Historic Drilling and Geology Map
Table 1: Mineral Resource Estimates for the
Nash Creek
and Superjack Projects
Indicated Mineral Resources
Project
Tonnes
Zn Eq.
(%)
Zn
(%)
Pb
(%)
Ag
(g/t)
Cu
(%)
Contained Zn Eq.
(M lbs)
Nash Creek
13,592,000
3.21
2.68
0.58
17.8
n/a
963
Total
13,592,000
3.21
2.68
0.58
17.8
n/a
963
Inferred Mineral Resources
Project
Tonnes
Zn Eq.
(%)
Zn
(%)
Pb
(%)
Ag
(g/t)
Cu
(%)
Contained Zn Eq.
(M lbs)
Superjack
3,211,000
4.63
3.01
0.78
29.5
0.27
328
Nash Creek
5,929,000
3.11
2.68
0.47
13.9
n/a
407
Total
9,140,000
3.64
2.80
0.58
19.4
0.09
735
Notes:
1
.
Mineral Resources are categorized according to CIM Definition Standards; it cannot be assumed that all or any part of Inferred Mineral Resources
will be upgraded to Indicated or Measured as a result of continued exploration.
2
.
The Nash Creek Mineral Resource Estimate includes the Hickey Zone and Hayes Zone.
3
.
The Superjack Mineral Resource Estimates includes the Nepisiguit A (the "A Zone") and Nepisiguit C Zones (the "C Zone").
4
.
Zinc equivalent Mineral Resources for the Nash Creek Project based on trailing 3-year metal prices and metallurgical recovery assumptions based
on limited testwork. Zinc equivalency is calculated as Zn%+ 0.747*Pb% + 0.006*Ag_ppm.
5
.
A cut-off grade of 1.5% Zn Eq. was utilized in the resource estimate.
6
.
Zinc equivalent Mineral Resources for the Superjack Project were calculated using metal prices of
$1.12
/lb for zinc,
$1.06
/lb for lead,
$2.97
/lb for
copper and
$20.38
/oz for silver. Metal recoveries have been assumed to be 100% for zinc, 72% for lead, 86% for copper and 70% for silver. A
cut-off grade of 1.5% Zn Eq. was utilized in the Mineral Resource Estimate
.
7
.
Numbers may not add due to rounding.
About Callinex Mines Inc.
Callinex Mines Inc. (TSXV: CNX) (OTC: CLLXF) is advancing its portfolio of zinc rich deposits located in established Canadian mining jurisdictions.
The portfolio is highlighted by its
Nash Creek
and Superjack deposits in the Bathurst Mining District of
New Brunswick
. A 2018 PEA outlined a mine
plan that generates a strong economic return with a pre-tax IRR of a 34.1% (25.2% post-tax) and NPV8% of
$230 million
(
$128 million
post-tax).
The projects have significant exploration upside over a district-scale land package that encompasses several high-grade mineral occurrences along
a 20 km trend.
Click here
to view a video overview of the Nash Creek Project.
Callinex has a project portfolio that also includes projects within the Flin Flon Mining District of
Manitoba
that are located 25 km to an operating
processing facility that requires additional ore. The Company's projects host Indicated resources of 13.6 Mt averaging 3.2% Zn Eq. totaling 963
million pounds and Inferred resources of 23.2 Mt averaging 5.2% Zn Eq. totaling 2.7 billion pounds (See News Release dated
April 16, 2018
).
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)
accepts responsibility for the adequacy or accuracy of this release.
Some statements in this news release contain forward-looking information. These statements include, but are not limited to, statements with respect
to future expenditures. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and
other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or
achievements expressed or implied by the statements. Such factors include, among others, the ability to complete the proposed drill program and
the timing and amount of expenditures. Except as required under applicable securities laws, Callinex does not assume the obligation to update any
forward-looking statement
.
View original content:
http://www.prnewswire.com/news-releases/callinex-announces-acquisition-to-expand-its-headway-project-in-the-bathurst-mining-district-300803861.html
SOURCE
Callinex Mines Inc.
View original content:
http://www.newswire.ca/en/releases/archive/February2019/28/c4555.html
%SEDAR: 00031889E
For further information:
Callinex Mines Inc., Max Porterfield, President and Chief Executive Officer, Phone: (604) 605-0885, E-mail: [email protected]
CO: Callinex Mines Inc.
CNW 08:30e 28-FEB-19