Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

VAU.V ·

Viva Gold Continues to Expand Gold Mineralization at the Tonopah Gold Project in Nevada Latest RC drilling extends the new southeast pit area and confirms a new block of gold mineralization on the south side of the deposit; first 15 holes now being incorporated into an

Drill Results Corporate Updates

NR 26-10

Viva Gold Continues to Expand Gold Mineralization at the Tonopah Gold Project

in Nevada

Latest RC drilling extends the new southeast pit area and confirms a new block of gold

mineralization on the south side of the deposit; first 15 holes now being incorporated into an

updated resource model

VANCOUVER, BC – June 23, 2026 – Viva Gold Corp ( TSXV: VAU; OTCQB: VAUCF ) (the “Company” or

“Viva”) is pleased to announce additional results from the 2026 reverse-circulation (“RC”) drill program

at its Tonopah Gold Project (“Tonopah,” or the “Project”). Tonopah is located on the prolific Walker Lane

Mineral Trend in western Nevada, approximately a 30 -minute drive south of Kinross Gold’s Round

Mountain Mine. Building on previously announced results, today’s results continue to extend known gold

mineralization and define new mineralized areas across the deposit – reinforcing the momentum of a

program that has returned consistent gold intercepts across the first fifteen holes drilled.

“With each batch of results, the picture at Tonopah gets bigger and clearer . TG2614 defined the width

extent of the new southeast trend, while TG2615 builds directly on our earlier TG2608 intercept to

establish a new block on gold mineralization of the south side of the deposit. The first fifteen holes of this

program are now being incorporated into our updated resource model, and we are encouraged by what

we are seeing,” stated James Hesketh, President & CEO.

With assays in hand for fifteen of the nineteen holes , and results for the remaining four expected in the

coming weeks, the 2026 program is feeding directly into the updated resource model that will underpin

the Company's pre-feasibility study, targeted for Q4 2026.

RC Drill Program Highlights

Highlights of our latest assay returns include:

• TG2615: 56.4 m @ 0.35 g/t Au in two zones starting at 32 meters depth;

• TG2614: 19.8 m @ 1.01 g/t Au in four zones starting at 51.8 meters depth;

• TG2612: 7.6 m @ 0.34 g/t Au in two zones starting at 56.4 meters depth.

This drill program was designed to infill and upgrade areas of inferred gold mineral resource and undrilled

areas currently carried as waste within our 2025 PEA resource pit shell. Additional drilling was performed

on open extensions to mineralization outside the PEA pit shell. Nineteen drill holes totaling 3,210 meters

have been completed in this program including three exploration holes drilled in the Midway Hills

prospect area at Tonopah. Assay results have been received for holes TG2601 to TG26 15 with assay

returns pending for the remaining four drill holes.

Hole Azimuth Dip From To Length

Depth To

Mineral Gold Grade Silver Grade Rock Type Comment

Meter Meter Meter Meter Gram/Tonne Gram/Tonne

TG2615 60 -70 152.4 143.2

32.0 83.8 51.8 30.1 0.36 2.08 Opa South Side of Eastern Pit

including 71.6 74.7 3.0 67.3 1.05 2.10 Opa 65m SSE of TG2608

93.0 97.5 4.6 87.4 0.28 2.23 Opa Comfirms thick package of

mineralization

TG2614 55 -65 152.4 138.1

51.8 59.4 7.6 47.0 0.71 3.70 Opa Drilled NE from collar of TG2602

62.5 65.5 3.0 56.6 0.91 4.20 Opa Bisects between TG2601 and

70.1 74.7 4.6 63.5 0.44 2.77 Opa TG2422 confirming width

85.3 89.9 4.6 77.3 2.14 4.13 Opa extent of new zone

TG2612 0 -90 134.1 134.1

56.4 61.0 4.6 56.4 0.29 3.33 Opa Offsets TG2607 and TG2601

70.1 73.2 3.0 70.1 0.41 2.55 Opa on north side of new SE trend

Released 3 June, 2026

TG2610 0 -90 262.1

123.4 182.9 59.4 123.4 1.08 1.97 Tvl North side of Western pit

including 123.4 129.5 6.1 123.4 4.32 7.80 Tvl extension in inferred resource

including 158.5 163.1 4.6 158.5 2.26 1.90 Tvl block. Mill feed grade.

including 173.7 181.4 7.6 173.7 1.17 1.56 Tvl Likely grade increase and

189.0 217.9 29.0 189.0 0.76 3.88 Tvl/Opa upgrade to Indicated mtl.

including 196.6 198.1 1.5 196.6 8.67 10.50 Opa

TG2609 0 -90 266.7

131.1 138.7 7.6 131.1 0.58 1.44 Tvl South Side of Western Pit

201.2 208.8 7.6 201.2 0.31 2.24 Opa

Released 13 May, 2026

TG2606 0 -90 176.8

21.3 24.4 3.0 21.3 1.40 0.90 Tvl Infill hole located 35 meters

74.7 106.7 32.0 74.7 3.14 8.11 Opa north of TG2422 confirms

including 76.2 85.3 9.1 76.2 9.27 16.48 Opa shallow pit potential.

including 76.2 77.7 1.5 76.2 26.3 45.5 Opa Inferred conversion and grade

121.9 125.0 3.0 121.9 0.53 1.60 Opa increase to mill grade

134.1 141.7 7.6 134.1 1.31 1.58 Opa

157.0 163.1 6.1 157.0 0.79 1.75 Opa

TG2605 0 -90 170.7

62.5 74.7 12.2 62.5 0.38 1.86 Tvl Infill of inferred on north

115.8 123.4 7.6 115.8 0.34 1.04 Tvl boundary of 2025 PEA pit

Upgrades inferred

TG2608 0 -90 137.2

25.9 35.1 9.1 25.9 0.72 2.88 Opa Drilled on edge of inferred zone

including 29.0 32.0 3.0 29.0 1.39 3.45 Opa South east PEA pit

47.2 67.1 19.8 47.2 0.39 1.06 Opa Adds new mineralization

85.3 88.4 3.0 85.3 0.91 1.17 Opa Heap Leach grades

103.6 137.2 33.5 103.6 0.44 1.09 Opa

TG2607 225 -70 121.9

56.4 64.0 7.6 53.0 0.45 9.16 Opa Drilled 52 meters SE of

94.5 99.1 4.6 88.8 0.33 3.10 Opa TG2601 extending new zone

111.3 115.8 4.6 104.5 0.28 2.63 Opa Adds new mineralization

Released April 23, 2026

TG2601 225 -70 152.4

64.0 86.9 22.9 60 1.29 9.07 Opa 73M SE step-out from TG2422

including 64.0 68.6 4.6 60.0 4.73 21.60 Opa Mill circuit grade

TG2603 250 -70 131.1

94.5 109.7 15.2 88.3 1.16 1.59 Opa/Tvl 50M NW step-out from MW81

including 96.0 99.1 3.0 90.2 2.56 4.90 Contact Mill circuit grade

Tvu = Upper Tertiary Volcanic Cutoff Grade: 0.2 Au g/t

Tvl = Lower Tertiary Volcanic

Opa = Ordovician Palmetto Argillite True thickness/widths are unknown

NSS = No significant sample

Tonopah Gold Project

Preliminary 2026 Reverse Circulation Drilling Program Results

Quality Assurance/Quality Control

Viva Gold utilizes a well-documented system of inserting blanks and standards into the assay stream and

has a strict chain of custody for samples taken by the Company. Assays taken by the Company are

completed at independent laboratories which have internal quality assurance and quality control systems

and procedures. Assays were performed by American Assay Laboratories Inc. of Reno, Nevada , by fire

assay and ICP methods with gravimetric finish.

Qualified Person

James Hesketh, MMSA -QP, has approved the scientific and technical disclosure contained in this press

release. Mr. Hesketh is not independent of the Company; he is an Officer and Director.

About Viva Gold Corp:

Viva Gold’s 100%-owned Tonopah Gold Project is located within a large land position in established gold-

mining country on the prolific Walker Lane Structural Trend in western Nevada, approximately a 30 -

minute drive south of Kinross Gold’s Round Mountain Mine. Viva has defined a high -confidence gold

mineral resource and has demonstrated the potential for an economically viable open-pit, heap leach/mill

gold project through its 2025 preliminary economic as sessment (“PEA”). Pre-feasibility study (PFS) has

been initiated on the project with a final report due in fourth quarter of 2026. Viva Gold is committed to

advancing the Tonopah Gold Project in an environmentally and socially responsible manner, consisten t

with management’s core values.

Viva Gold is led by CEO James Hesketh, a 40 -year mining industry veteran who has led the development

and construction of eight mines globally. The Board and management team include experienced mining

professionals with expertise in exploration, project development, construction, and mine operations.

Viva Gold trades on the TSX Venture Exchange (“VAU”), the OTCQB (“VAUCF”), and the Frankfurt Exchange

(“7PB”). Viva currently has approximately 172 million shares outstanding. The Company is advancing its

Tonopah Gold Project in mining -friendly Nevada with the support of institutional shareholders. More

information is available on https://www.sedar.com and at www.vivagoldcorp.com.

For further information please contact:

James Hesketh, President & CEO

(720) 291-1775

[email protected]

Graham Farrell, Investor Relations

(416) 842-9003

[email protected]

Forward-Looking Information :

This news release contains certain information that may constitute forward -looking information or

forward-looking statements under applicable Canadian securities legislation (collectively, “forward -

looking information”), including but not limited to drilli ng operations and estimates of gold mineral

resource at the Tonopah Gold Project. This forward -looking information entails various risks and

uncertainties that are based on current expectations, and actual results may differ materially from those

contained in such information. These uncertainties and risks include, but are not limited to, the strength

of the global economy, inflationary pressures, pandemics, and issues and delays related to permitting

activities; the price of gold; operational, funding and liquidity risks; the potential for achieving targeted

drill results, the degree to which mineral resource estimates are reflective of actual mineral resources; the

degree to which factors which would make a mineral deposit commercially viable are present; the risks

and hazards associated with drilling and mining operations; and the ability of Viva to fund its capital

requirements. Risks and uncertainties about the Company’s business are more fully discussed in the

Company’s disclosure materials filed with the securities regulatory authorities in Canada available at

www.sedar.com. Readers are urged to read these materials. Viva assumes no obligation to update any

forward-looking information or to update the reasons why actual results could differ from such

information unless required by law.

Cautionary Note to Investors --- Investors are cautioned not to assume that any "measured mineral

resources", "indicated mineral resources", or "inferred mineral resources" that the Company reports in this

news release are or will be economically or legally mineable. United States investors are cautioned that

while the SEC now recognizes "measured mineral resources", "indicated mineral resources" and "inferred

mineral resources", investors should not assume that any part or all of the mineral deposits in these

categories will ever be conve rted into a higher category of mineral resources or into mineral

reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Under

Canadian regulations, estimates of inferred mineral resources may not form the basis of feasibility or pre-

feasibility studies, except in limited circumstances. Further, "inferred mineral resources" have a great

amount of uncertainty as to their existence and as to their economic and legal feasibility. It cannot be

assumed that any part or all of an inferred mineral resource will ever be upgraded to a higher category.

The mineral reserve and mineral resource data set out in this news release are estimates, and no assurance

can be given that the anticipated tonnages and grades will be achieved or that the indicated level of

recovery will be realized.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.