AMERICAS SILVER RELEASES HIGHLIGHTS FROM EL CAJÓN AND ZONE 120 PRE‐FEASIBILITY STUDY  

TORONTO,  ONTARIO—April  3,  2019—Americas  Silver  Corporation  (TSX:  USA)  (NYSE  American:  USAS) 

(“Americas Silver” or the “Company”) is pleased to announce the results of a Preliminary Feasibility Study 

( “ P F S ” ,  “ S t u d y ” )  a n d  i n i t i a l  m i n e r a l  r e s e r v e  e s t i m a t e  p r e p a r e d  internally  by  Company  personnel  for  a 

combined operation at its 100% owned El Cajón and Zone 120 silver‐copper deposits (“EC120”, “Project”) 

located near Cosalá, Sinaloa, Me xico.  The base case economics  for the EC120 Project are presented at 

long  term  consensus  prices  of  $17.50  per  ounce  silver  and  $3.00  per  pound  copper,  with  all  amounts 

expressed in US dollars.  

EC120 Project PFS Highlights (all values in USD unless otherwise noted): 

● Estimated probable mineral reserve of 2.9 million tonnes with a grade of 157g/t silver and 0.42% 

copper containing 14.5 million ounces of silver and 26.5 million pounds of copper

● 5‐year  mine  life  with  average  annual  metal  production  of  2.5  million  ounces  of  silver  and  4.6 

million pounds of copper (3.3 million silver equivalent ounces 1)

● The Project has a pre‐tax net present value with a 5% discount  rate (“NPV5%”) of approximately 

$43 million and internal rate of return (“IRR”) of 61% or after‐tax NPV5% of $33 million and IRR of 

47% 

● Initial  capital  expenditure  of  approximately  $17  million  with  life  of  mine  sustaining  capital  of 

approximately $15 million2

● Life of mine cash cost3of approximately $9.60 per silver ounce and average all‐in sust aining cost2 

(“AISC”) of approximately $10.80 per silver ounce

“The EC120 Project is a significant addition to our precious metals growth pipeline,” said Darren Blasutti, 

President  &  CEO  of  Americas  Silver.    “Having  a  2.5  million  ounc e  p e r  y e a r  s i l v e r  p r o j e c t  r e a d y  f o r  

immediate development fits into our strategy of preparing for t he inevitable positive correction in the 

silver price. It provides a solid five‐year production base as  we continue to further explore the El Cajón 

and Zone 120 deposits and our other silver‐rich exploration target areas in Cosalá later in 2019.”  

The Study considers two underground operations with concurrent production from the adjacent El Cajón 

and Zone 120 deposits.  Following an 18‐month pre‐production period, the combined operation will target 

a production rate of 1,800 tonnes  per day.  Overhand mechanized cut‐and‐fill will be the mining method 

utilized at both mines.  The Project will take advantage of existing infrastructure and equipment currently 

in use at the producing San Rafael mine and existing development at the El Cajón deposit.  

1 Silver equivalent ounces are calculated using metal prices of $17.50/oz silver and $3.00/lb copper  

2 Initial capex excludes working capital and pre‐production operating costs net of revenue 

3 Cash cost per ounce and all‐in sustaining cost per ounce are non‐IFRS performance measures with no standardized definition. 

The Company reconciles such measures to IFRS measures as shown in the Company’s 2018 Management’s Discussion and 

Analysis under the heading “Non‐IFRS measures: Cash Costs per Ounce and All‐in Sustaining Cost per Ounce.” For further 

information on the PFS non‐IFRS measures, please see the pre‐feasibility study once it is filed on www.SEDAR.com.   

2 

The Study assumes that processing will take place at the existing Los Braceros facility to produce a silver‐

bearing copper concentrate.  The Los Braceros facility currently processes San Rafael ore to produce silver‐

bearing zinc and lead concentrates.  Only minor modifications t o the plant would be required to process 

ore from EC120.  The existing ta ilings storage facility has cap acity to store all planned production with 

scheduled dam lifts.   

Based on the Study, the Project is expected to produce over 12  million ounces of silver and 23.0 million 

pounds of copper over a mine life of approximately 5 years.  The life of mine all‐in sustaining costs of the 

Project are expected to be below $11.00 per ounce of silver produced.  The Company has not yet made a 

production decision with respect to the Project, however permit s are in place to allow development to 

begin at any time.     

The Probable Mineral Reserve estimate for EC120 as at April 3, 2019 is presented below. 

EC120 Probable Mineral Reserves  

   Ore  Grade  Contained Metal 

   Tonnes  Silver  Copper  Silver  Copper  

   000s  g/t  %  koz  Mlbs 

  Zone 120 Probable  2,047  161  0.40  10,610  18.1 

  El Cajón Probable  831  147  0.46  3,939  8.4 

EC120 Probable  2,877  157  0.42  14,549  26.5 

Mineral Reserve Notes: 

1.  CIM (2014) Definition Standards were followed for Mineral Re serves. 

2.  Mineral Reserves are estimated at a net smelter return cut‐o ff value of US$40/tonne at El Cajon and Zone 

120.   

3.  Mineral Reserves are estimate d using metal prices of US$16.00/oz Ag and $2.50/lb Cu. 

4.  A minimum mining width of 4 m eters and a 15% dilution factor , at zero grade, was used for estimating 

Reserves at El Cajon and Zone 120.  Mining recoveries vary betw een 80% to 95% depending on the width 

of the ore zone to reflect the proposed overhand cut and fill mining method. 

5.  The EC120 Mineral Reserve estimate was prepared internally b y Shawn Wilson, P.Eng., who is a Qualified 

Person for the purpose of National Instrument 43‐101 (“NI 43‐101”). 

6.  Numbers may not add or multipl y accurately due to rounding. 

7.   Americas  Silver  is  not  aware  of  any  environmental,  permitti ng,  legal,  title,  taxation,  socio‐economic, 

marketing, political, or other relevant issues that would materially affect this mineral reserve estimate. 

Readers are encouraged to read t he related technical report in  its entirety once filed on the Company’s 

SEDAR profile at www.sedar.com and on the Company’s website at www.americassilvercorp.com to fully 

understand the information in this news release.   

The technical information in this news release has been prepared and approved by Shawn Wilson, P.Eng., 

Vice President Technical Services for Americas Silver and a Qualified Person for the purpose of NI 43‐101. 

About Americas Silver Corporation 

Americas Silver is a precious metal mining company focused on g rowth from its existing asset base and 

execution  of  targeted  accretive acquisitions.  It  owns  and  operates  the  Cosalá  Operations  in  Sinaloa, 

Mexico  and  the  Galena  Complex  in  Idaho,  USA.  The  Company  holds  a n  o p t i o n  o n  t h e  S a n  F e l i p e  

development  project  in  Sonora,  Me xico.  For  further  information  please  see  SEDAR  or 

americassilvercorp.com. 

3 

Cautionary Statement on Forward‐Looking Information: 

This  news  release  contains  “forward‐looking  information”  within  the  meaning  of  applicable  securities 

laws. Forward‐looking information includes, but is not limited  to, Americas Silver’s and Pershing Gold’s 

expectations, intentions, plans, assumptions and beliefs with r espect to, among other things, Americas 

Silver’s potential advancement of the EC120 Project. Often, but not always, forward‐looking information 

can  be  identified  by  forward‐looking  words  such  as  “anticipate”,  “believe”,  “expect”,  “goal”,  “plan”, 

“intend”, “estimate”, “may”, “assume” and “will” or similar wor ds suggesting future outcomes, or other 

expectations,  beliefs,  plans,  objectives,  assumptions,  intentions,  or  statements  about  future  events  or 

performance.  Forward‐looking information is based on the opini ons and estimates of Americas Silver as 

of the date such information is provided and is subject to know n and unknown risks, uncertainties, and 

o t h e r  f a c t o r s  t h a t  m a y  c a u s e  t h e  a c t u a l  r e s u l t s ,  l e v e l  o f  a c t i vi t y ,  p e r f o r m a n c e ,  o r  a c h i e v e m e n t s  o f  

Americas  Silver  to  be  materially  different  from  those  expressed  or  implied  by  such  forward‐looking 

information.    With  respect  to  the  business  of  Americas  Silver,  these  risks  and  uncertainties  include 

interpretations or reinterpretations of geologic information; u nfavorable exploration results; inability to 

obtain permits required for future exploration, development or production; general economic conditions 

and  conditions  affecting  the  industries  in  which  the  Company  operates;  the  uncertainty  of  regulatory 

requirements and approvals; fluctuating mineral and commodity p rices; the ability to obtain necessary 

f u t u r e  f i n a n c i n g  o n  a c c e p t a b l e  t e r m s  o r  a t  a l l ;  a n d  r i s k s  a s s o ciated  with  the  mining  industry  such  as 

economic factors (including future commodity prices, currency f luctuations and energy prices), ground 

conditions  and  other  factors  limiting  mine  access,  failure  of  p lant,  equipment,  processes  and 

transportation  services  to  operate  as  anticipated,  environmental  risks,  government  regulation,  actual 

results of current exploration and production activities, possible variations in ore grade or recovery rates, 

permitting  timelines,  capital  expenditures,  reclamation  activities,  labor  relations,  social  and  political 

developments and other risks of the mining industry. Although t he Company has attempted to identify 

important factors that  could cause actual results to differ mat erially from those contained in forward‐

looking information, there may be other factors that cause results not to be as anticipated, estimated, or 

intended.  Readers are cautioned not to place undue reliance on such information.  Additional information 

regarding  the  factors  that  may  c ause  actual  results  to  differ  m aterially  from  this  forward‐looking 

information is available in Americas Silver’s filings with the  Canadian Securities Administrators on SEDAR 

and  with  the  SEC.    Americas  Silver  does  not  undertake  any  obligation  to  update  publicly  or  otherwise 

revise any forward‐looking information whether as a result of n ew information, future events or other 

such factors which affect this information, except as required  by law.  Americas Silver does not give any 

assurance  (1)  that  Americas  Silver  will  achieve  its  expectations,  or  (2)  concerning  the  result  or  timing 

thereof.    All  subsequent  written  and  oral  forward‐looking  information  concerning  Americas  Silver,  the 

EC120 Project, or any person acting on the behalf of Americas Silver are expressly qualified in their entirety 

by the cautionary statements above. 

No Offer or Solicitation  

This  press  release  is  for  informational  purposes  only  and  does not  constitute  an  offer  to  sell  or  the 

solicitation of an offer to buy any securities, nor shall there  be any sale of securities in any jurisdiction in 

which such offer, solicitation or sale would be  unlawful prior  to  registration or qualification under the 

securities laws of any such jurisdiction.  No offer or sale of  securities shall be made except pursuant to 

registration under the United States Securities Act of 1933, as  amended (the “U.S. Securities Act”), and 

any applicable state securities laws or in compliance with an exemption therefrom. 

4 

Cautionary Note to U.S. Investors: 

The  terms  “mineral  resource”,  “measured  mineral  resource”,  “indicated  mineral  resource”,  “inferred 

mineral resource” used in the press release are Canadian mining terms used in accordance with National 

Instrument  43‐101  ‐  Standards  of  Disclosure  for  Mineral  Projects  under  the  guidelines  set  out  in  the 

Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum  Standards.   Mineral  resources  which  are  not 

mineral reserves do not have demonstrated economic viability.  

W h i l e  t h e  t e r m s  “ m i n e r a l  r e s o u r c e ” ,  “ m e a s u r e d  m i n e r a l  r e s o u r c e ”,  “indicated  mineral  resource”,  and 

“inferred mineral resource” are recognized and required by Cana dian regulations, they are not defined 

terms under  standards in  the  United States and normally are not  permitted  to be used in  reports and 

registration statements filed with the Securities & Exchange Co mmission (“SEC”).  A s such, information 

contained  in  the  Company's  disclosure  concerning  descriptions  of  mineralization  and  resources  under 

Canadian standards may not be comparable to similar information  made public by U.S companies in SEC 

filings.   With  respect  to  “inferred  mineral  resource”  there  is a  great  amount  of  uncertainty  as  to  their 

existence and a great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all 

or any part of an “inferred mineral resource” will ever be upgr aded to a higher category.  Investors are 

cautioned  not  to  assume  that  any  part  or  all  of  the  mineral  deposits  in  these  categories  will  ever  be 

converted into reserves. 

For more information: 

Darren Blasutti 

President and CEO 

416‐848‐9503 

Andrea Totino 

IR Manager 

416‐866‐1866