Americas Silver Corporation Reports Second Quarter 2018 Financial Results

Financials

1 

AMERICAS SILVER CORPORATION REPORTS SECOND QUARTER 2018 FINANCIAL RESULTS  

TORONTO,  ONTARIO—Aug  13,  2018—Americas  Silver  Corporation  (TSX:  USA)  (NYSE  American:  USAS) 

(“Americas Silver” or the “Company”) today reported consolidate d financial and operational results for 

the second quarter of 2018.  

This earnings release should be read in conjunction with the Co mpany’s Second Quarter Production and 

Cost  Update,  Management’s  Discussion  and  Analysis,  Financial  St atements  and  Notes  to  Financial 

Statements  for  the  corresponding  period,  which  have  been  posted  on  the  Americas  Silver  Corporation 

SEDAR  profile  at  www.sedar.com, on  its  EDGAR  profile  at  www.sec.gov,  and  are  also  available  on  the 

Company’s website at www.americassilvercorp.com. All figures are in U.S. dollars unless otherwise noted.  

Second Quarter Highlights  

 Revenues  of  $17.3  million  and  net  income  of  $1.4  million  or  $0.03  cents  per  share  in  Q2,  2018, 

compared with revenues of $17.2  million and net income of $0.9  million or $0.02 cents per share in 

Q2, 2017.  

 Cash flow generated from operating activities1 for the first half of 2018 of approximately $8.0 million, 

compared to cash flow generated from operating activities of ap proximately $6.3 million during the 

same period in 2017. 

 Record‐low consolidated cash costs and all‐in sustaining costs2 (“AISC”) were approximately negative 

($6.15)  per  silver  ounce,  a  decrease  of  185%  year‐over‐year,  and  approximately  $5.40  per  silver 

ounce, a decrease of 49% year‐over‐year, respectively.  

 Consolidated silver production for the quarter of approximately 1.5 million silver equivalent3 ounces, 

an increase of 24% when compared to Q2 2017, including approximately 300,000 silver ounces. 

 Cash balance at June 30, 2018 of $7.8 million with net working capital of approximately $12.1 million; 

long‐term debt decreased to $8.3 million. 

 Guidance for 2018 remains at 1.6  – 2.0 million silver ounces an d 7.2 – 8.0 million silver equivalent 

ounces at cash costs of negati ve ($10.00) to negative ($5.00) p er silver ounce and AISC of negative 

($1.00) to $4.00 per silver ounce.  The Company expects silver a nd silver equivalent production to be 

at the lower end of guidance, as a result of the Galena shaft repairs in Q2, 2018.  

“The  Company’s  operations  achieved  record‐low  consolidated  cash   costs  and  all‐in  sustaining  costs 

despite  Galena’s  operations  being  down  for  nearly  a  month  during  the  quarter,”  said  Americas  Silver 

President and CEO Darren Blasutti.  “We expect the second half  of the year to produce more silver, zinc 

and lead at lower unit operating costs as Galena returns to nor mal production and San Rafael ramps up 

to peak milling rates.” 

1 C a s h  f l o w  g e n e r a t e d  f r o m  o p e r a ting  activities  is  a  non‐IFRS  financial  measure  calculated  as net  cash  flow  generated  from 

operating  activities  less  changes  in  non‐cash  working  capital  items  such  as  trade  and  other  receivables,  inventories,  prepaid 

expenses, and trade and other payables. 

2 Cash cost per ounce and all‐in s ustaining cost per ounce are n on‐IFRS performance measures with no standardized definition. 

For further information and detailed reconciliations, please refer to the Company’s 2017 year‐end and quarterly MD&A. 

3 Silver equivalent production throughout this press release was  calculated based on silver, zinc, lead and copper realized pri ces 

during each respective period. 

2 

Consolidated Production and Operating Costs  

Consolidated Production and Cost Details  

   Q2 2018  Q2 2017 

Total ore processed (tonnes milled)  164,313  179,427 

Silver produced (ounces)  301,711  557,892 

Zinc produced (pounds)  8,756,201  2,904,374 

Lead produced (pounds)  6,216,592  6,435,048 

Copper produced (pounds)  ‐  273,475 

Silver equivalent produced (ounces)   1,462,170  1,175,836 

Silver recovery (percent)  74.4  90.6 

Silver grade (grams per tonne)  77  107 

Silver sold (ounces)  311,671  574,479 

Zinc sold (pounds)  8,504,845  2,746,948 

Lead sold (pounds)  6,352,839  6,725,788 

Copper sold (pounds)  ‐  294,278 

Cost of sales ($ per silver equivalent ounce)1  $8.20  $11.00 

Silver cash cost ($ per silver ounce) 1  ($6.15)  $7.21 

All‐in sustaining cost ($ per silver ounce) 1  $5.40  $10.65 

1   For Q2 2017 cost of sales per silver equivalent ounce, cash c osts per silver ounce, and all‐in sustaining costs per silver o unce 

excludes pre‐production of 22,549 silver ounces and 32,955 silver equivalent ounces, respectively, mined from El Cajón during 

its commissioning period. Pre‐production revenue and cost of sales from El Cajón are capitalized as an offset to development 

costs. 

Net income of $1.4 million was recorded for the quarter, compar ed to net income of $0.9 million for the 

second  quarter  of  2017.  The  improvement  in  net  income  was  primarily  attributable  to  higher  metal 

production and realized metal prices, lower cost of sales, and  a gain on the disposal of an asset, partially 

offset by higher care and maintenance costs associated with the temporary shutdown. The Company also 

generated  cash from operating activities before non‐cash workin g  capital items of $4.3  million for  the 

quarter compared to $3.2 million in the second quarter of 2017.  

During Q2, 2018, the Company produced 1.5 million consolidated  silver equivalent ounces including 0.3 

million  silver  ounces,  compared  to  production  of  1.2  million  co nsolidated  silver  equivalent  ounces 

including 0.6 million silver ounces during Q2, 2017. Consolidat ed silver equivalent production increased 

due  to  the  greater  output  of  zinc  and  lead  by‐product  metals  from  the  San  Rafael  mine  at  the  Cosalá 

Operations. During the first half of 2018, mining rates from Sa n Rafael gradually increased as the mine 

balanced the extraction of ore with underground development into the main body of the deposit. Milling 

rates increased from 1,370 tonnes per calendar day in Q1 to 1,524 tonnes per calendar day in Q2 and are 

expected to be increase above 1,700 tonnes per day in the second half of this year.  

C o n s o l i d a t e d  s i l v e r  p r o d u c t i o n  w a s  l o w e r  c o m p a r e d  t o  p r i o r  q u a rt e r s  a s  G a l e n a ’ s  p r o d u c t i o n  w a s  

negatively impacted by necessary repairs to its No.3 Shaft completed by the end of Q2, 2018. As previously 

announced on June 14, 2018, production at the Galena Complex was negatively impacted by two separate 

issues affecting the No.3 Shaft for a combined total of 27 days during the quarter. Those issues have been 

resolved and are not expected to negatively impact production in the future. 

Consolidated  costs  of  sales  were  $8.20/oz.  equivalent  silver,  b y‐product  cash  costs  were  negative 

($6.15/oz.) silver, and all‐in sustaining costs were $5.40/oz. silver, representing year‐over‐year decreases 

of 25%, 185% and 49%, respectively. These improvements were a result of the significant increase in zinc 

production (201%) from the San Rafael mine compared to Q2, 2017 when the Cosalá Operations previous 

3 

mine, Nuestra Señora, was in production. The zinc production increase combined with increased realized 

prices for both zinc and lead substantially lowered these consolidated operating metrics for both Q2, 2018 

and first half of 2018, despite the 27‐day shutdown of the Galena mine.  

Further  information  concerning  the  consolidated  and  individual  mine  operations  is  included  in  the 

Company’s  second  quarter  Condensed  Interim  Consolidated  Financial  Statements  for  the  six  months 

ended June 30, 2018 and Management’s Discussion and Analysis for the three and six months ended June 

30, 2018. 

Q2 2018 Earnings Conference Call 

President & CEO Darren Blasutti will be hosting a Q2, 2018 earn ings conference call on Tuesday, August 

14, 2018 at 8:30am EDT.  A copy of the presentation will be mad e available on the company’s website at 

www.americassilvercorp.com.  

Step 1: Dial‐In

Canada and USA Toll‐Free    1‐800‐584‐1507  

International Toll Number +1‐416‐620‐9188  

Step 2: Online Login 

https://cc.callinfo.com/r/1b3u0dldpwwfe&eom 

About Americas Silver Corporation  

Americas Silver is a silver mining company focused on growth in  precious metals from its existing asset 

base  and  execution  of  targeted  accretive  acquisitions.    It  owns  and  operates  the  Cosalá  Operations  in 

Sinaloa, Mexico and the Galena Mine Complex in Idaho, USA. The  Company holds an option on the San 

Felipe  development  project  in  Sonora,  Mexico.  For  further  infor mation  please  see  SEDAR  or 

americassilvercorp.com. 

Cautionary Statement on Forward‐Looking Information: 

This  news  release  contains  “forward‐looking  information”  within  the  meaning  of  applicable  securities 

laws. Forward‐looking information includes, but is not limited to, the Company’s expectations intentions, 

plans,  assumptions  and  beliefs  with  respect  to,  among  other  thi ngs,  the  realization  of  exploration, 

operational, production, and development plans, the Cosalá Oper ations and Galena Complex as well as 

the Company’s financing efforts. Often, but not always, forward‐looking information can be identified by 

forward‐looking  words  such  as  “anticipate”,  “believe”,  “expect”,  “goal”,  “plan”,  “intend”,  “estimate”, 

“may”, “assume” and “will” or similar words suggesting future o utcomes, or other expectations, beliefs, 

plans, objectives, assumptions, i ntentions, or statements about  future events or performance. Forward‐

looking  information  is  based  on  the  opinions  and  estimates  of  t h e  C o m p a n y  a s  o f  t h e  d a t e  s u c h  

information is provided and is subject to known and unknown ris ks, uncertainties, and other factors that 

may  cause  the  actual  results,  level  of  activity,  performance,  or  achievements  of  the  Company  to  be 

materially different from those expressed or implied by such fo rward looking information. This includes 

the  ability  to  develop  and  operate  the  Cosalá  and  Galena  properties,  risks  associated  with  the  mining 

industry such as economic factors (including future commodity p rices, currency fluctuations and energy 

prices),  ground  conditions  and  factors  other  factors  limiting  mine  access,  failure  of  plant,  equipment, 

processes  and  transportation  services  to  operate  as  anticipated ,  environmental  risks,  government 

regulation, actual results of current exploration and production activities, possible variations in ore grade 

or recovery rates, permitting  timelines, capital  expenditures,  reclamation activities , social  and political 

developments and other risks of the mining industry. Although t he Company has attempted to identify 

important factors that  could cause actual results to differ mat erially from those contained in forward‐

looking information, there may be other factors that cause results not to be as anticipated, estimated, or 

intended. Readers are cautioned not to place undue reliance on such information. By its nature, forward‐

4 

looking information involves numerous assumptions, inherent ris ks and uncertainties, both general and 

specific that contribute to the possibility that the predictions, forecasts, and projections of various future 

events will not occur. The Company undertakes no obligation to  update publicly or otherwise revise any 

forward‐looking information whether as a result of new informat ion, future events or other such factors 

which affect this information, except as required by law. 