Americas Silver Corporation Reports Second Quarter 2018 Financial Results
1
AMERICAS SILVER CORPORATION REPORTS SECOND QUARTER 2018 FINANCIAL RESULTS
TORONTO, ONTARIO—Aug 13, 2018—Americas Silver Corporation (TSX: USA) (NYSE American: USAS)
(“Americas Silver” or the “Company”) today reported consolidate d financial and operational results for
the second quarter of 2018.
This earnings release should be read in conjunction with the Co mpany’s Second Quarter Production and
Cost Update, Management’s Discussion and Analysis, Financial St atements and Notes to Financial
Statements for the corresponding period, which have been posted on the Americas Silver Corporation
SEDAR profile at www.sedar.com, on its EDGAR profile at www.sec.gov, and are also available on the
Company’s website at www.americassilvercorp.com. All figures are in U.S. dollars unless otherwise noted.
Second Quarter Highlights
Revenues of $17.3 million and net income of $1.4 million or $0.03 cents per share in Q2, 2018,
compared with revenues of $17.2 million and net income of $0.9 million or $0.02 cents per share in
Q2, 2017.
Cash flow generated from operating activities1 for the first half of 2018 of approximately $8.0 million,
compared to cash flow generated from operating activities of ap proximately $6.3 million during the
same period in 2017.
Record‐low consolidated cash costs and all‐in sustaining costs2 (“AISC”) were approximately negative
($6.15) per silver ounce, a decrease of 185% year‐over‐year, and approximately $5.40 per silver
ounce, a decrease of 49% year‐over‐year, respectively.
Consolidated silver production for the quarter of approximately 1.5 million silver equivalent3 ounces,
an increase of 24% when compared to Q2 2017, including approximately 300,000 silver ounces.
Cash balance at June 30, 2018 of $7.8 million with net working capital of approximately $12.1 million;
long‐term debt decreased to $8.3 million.
Guidance for 2018 remains at 1.6 – 2.0 million silver ounces an d 7.2 – 8.0 million silver equivalent
ounces at cash costs of negati ve ($10.00) to negative ($5.00) p er silver ounce and AISC of negative
($1.00) to $4.00 per silver ounce. The Company expects silver a nd silver equivalent production to be
at the lower end of guidance, as a result of the Galena shaft repairs in Q2, 2018.
“The Company’s operations achieved record‐low consolidated cash costs and all‐in sustaining costs
despite Galena’s operations being down for nearly a month during the quarter,” said Americas Silver
President and CEO Darren Blasutti. “We expect the second half of the year to produce more silver, zinc
and lead at lower unit operating costs as Galena returns to nor mal production and San Rafael ramps up
to peak milling rates.”
1 C a s h f l o w g e n e r a t e d f r o m o p e r a ting activities is a non‐IFRS financial measure calculated as net cash flow generated from
operating activities less changes in non‐cash working capital items such as trade and other receivables, inventories, prepaid
expenses, and trade and other payables.
2 Cash cost per ounce and all‐in s ustaining cost per ounce are n on‐IFRS performance measures with no standardized definition.
For further information and detailed reconciliations, please refer to the Company’s 2017 year‐end and quarterly MD&A.
3 Silver equivalent production throughout this press release was calculated based on silver, zinc, lead and copper realized pri ces
during each respective period.
2
Consolidated Production and Operating Costs
Consolidated Production and Cost Details
Q2 2018 Q2 2017
Total ore processed (tonnes milled) 164,313 179,427
Silver produced (ounces) 301,711 557,892
Zinc produced (pounds) 8,756,201 2,904,374
Lead produced (pounds) 6,216,592 6,435,048
Copper produced (pounds) ‐ 273,475
Silver equivalent produced (ounces) 1,462,170 1,175,836
Silver recovery (percent) 74.4 90.6
Silver grade (grams per tonne) 77 107
Silver sold (ounces) 311,671 574,479
Zinc sold (pounds) 8,504,845 2,746,948
Lead sold (pounds) 6,352,839 6,725,788
Copper sold (pounds) ‐ 294,278
Cost of sales ($ per silver equivalent ounce)1 $8.20 $11.00
Silver cash cost ($ per silver ounce) 1 ($6.15) $7.21
All‐in sustaining cost ($ per silver ounce) 1 $5.40 $10.65
1 For Q2 2017 cost of sales per silver equivalent ounce, cash c osts per silver ounce, and all‐in sustaining costs per silver o unce
excludes pre‐production of 22,549 silver ounces and 32,955 silver equivalent ounces, respectively, mined from El Cajón during
its commissioning period. Pre‐production revenue and cost of sales from El Cajón are capitalized as an offset to development
costs.
Net income of $1.4 million was recorded for the quarter, compar ed to net income of $0.9 million for the
second quarter of 2017. The improvement in net income was primarily attributable to higher metal
production and realized metal prices, lower cost of sales, and a gain on the disposal of an asset, partially
offset by higher care and maintenance costs associated with the temporary shutdown. The Company also
generated cash from operating activities before non‐cash workin g capital items of $4.3 million for the
quarter compared to $3.2 million in the second quarter of 2017.
During Q2, 2018, the Company produced 1.5 million consolidated silver equivalent ounces including 0.3
million silver ounces, compared to production of 1.2 million co nsolidated silver equivalent ounces
including 0.6 million silver ounces during Q2, 2017. Consolidat ed silver equivalent production increased
due to the greater output of zinc and lead by‐product metals from the San Rafael mine at the Cosalá
Operations. During the first half of 2018, mining rates from Sa n Rafael gradually increased as the mine
balanced the extraction of ore with underground development into the main body of the deposit. Milling
rates increased from 1,370 tonnes per calendar day in Q1 to 1,524 tonnes per calendar day in Q2 and are
expected to be increase above 1,700 tonnes per day in the second half of this year.
C o n s o l i d a t e d s i l v e r p r o d u c t i o n w a s l o w e r c o m p a r e d t o p r i o r q u a rt e r s a s G a l e n a ’ s p r o d u c t i o n w a s
negatively impacted by necessary repairs to its No.3 Shaft completed by the end of Q2, 2018. As previously
announced on June 14, 2018, production at the Galena Complex was negatively impacted by two separate
issues affecting the No.3 Shaft for a combined total of 27 days during the quarter. Those issues have been
resolved and are not expected to negatively impact production in the future.
Consolidated costs of sales were $8.20/oz. equivalent silver, b y‐product cash costs were negative
($6.15/oz.) silver, and all‐in sustaining costs were $5.40/oz. silver, representing year‐over‐year decreases
of 25%, 185% and 49%, respectively. These improvements were a result of the significant increase in zinc
production (201%) from the San Rafael mine compared to Q2, 2017 when the Cosalá Operations previous
3
mine, Nuestra Señora, was in production. The zinc production increase combined with increased realized
prices for both zinc and lead substantially lowered these consolidated operating metrics for both Q2, 2018
and first half of 2018, despite the 27‐day shutdown of the Galena mine.
Further information concerning the consolidated and individual mine operations is included in the
Company’s second quarter Condensed Interim Consolidated Financial Statements for the six months
ended June 30, 2018 and Management’s Discussion and Analysis for the three and six months ended June
30, 2018.
Q2 2018 Earnings Conference Call
President & CEO Darren Blasutti will be hosting a Q2, 2018 earn ings conference call on Tuesday, August
14, 2018 at 8:30am EDT. A copy of the presentation will be mad e available on the company’s website at
www.americassilvercorp.com.
Step 1: Dial‐In
Canada and USA Toll‐Free 1‐800‐584‐1507
International Toll Number +1‐416‐620‐9188
Step 2: Online Login
https://cc.callinfo.com/r/1b3u0dldpwwfe&eom
About Americas Silver Corporation
Americas Silver is a silver mining company focused on growth in precious metals from its existing asset
base and execution of targeted accretive acquisitions. It owns and operates the Cosalá Operations in
Sinaloa, Mexico and the Galena Mine Complex in Idaho, USA. The Company holds an option on the San
Felipe development project in Sonora, Mexico. For further infor mation please see SEDAR or
americassilvercorp.com.
Cautionary Statement on Forward‐Looking Information:
This news release contains “forward‐looking information” within the meaning of applicable securities
laws. Forward‐looking information includes, but is not limited to, the Company’s expectations intentions,
plans, assumptions and beliefs with respect to, among other thi ngs, the realization of exploration,
operational, production, and development plans, the Cosalá Oper ations and Galena Complex as well as
the Company’s financing efforts. Often, but not always, forward‐looking information can be identified by
forward‐looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “estimate”,
“may”, “assume” and “will” or similar words suggesting future o utcomes, or other expectations, beliefs,
plans, objectives, assumptions, i ntentions, or statements about future events or performance. Forward‐
looking information is based on the opinions and estimates of t h e C o m p a n y a s o f t h e d a t e s u c h
information is provided and is subject to known and unknown ris ks, uncertainties, and other factors that
may cause the actual results, level of activity, performance, or achievements of the Company to be
materially different from those expressed or implied by such fo rward looking information. This includes
the ability to develop and operate the Cosalá and Galena properties, risks associated with the mining
industry such as economic factors (including future commodity p rices, currency fluctuations and energy
prices), ground conditions and factors other factors limiting mine access, failure of plant, equipment,
processes and transportation services to operate as anticipated , environmental risks, government
regulation, actual results of current exploration and production activities, possible variations in ore grade
or recovery rates, permitting timelines, capital expenditures, reclamation activities , social and political
developments and other risks of the mining industry. Although t he Company has attempted to identify
important factors that could cause actual results to differ mat erially from those contained in forward‐
looking information, there may be other factors that cause results not to be as anticipated, estimated, or
intended. Readers are cautioned not to place undue reliance on such information. By its nature, forward‐
4
looking information involves numerous assumptions, inherent ris ks and uncertainties, both general and
specific that contribute to the possibility that the predictions, forecasts, and projections of various future
events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any
forward‐looking information whether as a result of new informat ion, future events or other such factors
which affect this information, except as required by law.
For more information:
Darren Blasutti
President and CEO
416‐848‐9503