AMERICAS SILVER CORPORATION PROVIDES FIRST QUARTER PRODUCTION AND COST UPDATE 

TORONTO,  ONTARIO—April   26,  2017—Americas   Silver  Corporation  (TSX:  USA)  (NYSE  “MKT”:  USAS) 

(“Americas  Silver”  or  the  “Company”)  today  announced  consolidated  production  and  operating  cost 

results for the first quarter of 2017 and individually for its Cosalá Operations and  Galena  Complex.   All 

figures are in U.S. dollars unless otherwise indicated. 

First Quarter Highlights (compared to Q1, 2016) 

 Consolidated  silver  production  of  approximately  524,000  silver  ounces  and  1.1  million  silver 

equivalent1  ounces,  representing  decreases  of  22% and  13%,  respectively.  Consolidated  cash costs2 

were approximately $10.49 per silver ounce, an increase of 7%, while consolidated all‐in sustaining 

costs2 were approximately $14.27 per silver ounce, an increase of 19%. 

 Cosalá  Operations  silver  production  of  approximately  250,000  silver  ounces  and  537,000  silver 

equivalent  ounces,  representing  decreases  of  19%  and  11%,  respectively,  inclusive  of  El  Cajón 

development  ounces.  Cash  costs  were  approximately  $2.61  per  silver  ounce  and  all‐in  sustaining 

costs  were  approximately  $3.21  per  silver  ounce,  down  63%  and  63%,  respectively,  exclusive  of  El 

Cajón development ounces and related costs. 

 Galena  Complex  silver  production  for  the  quarter  of  approximately  273,000  silver  ounces  and 

571,000  silver  equivalent  ounces  representing  decreases  of  25%  and  14%,  respectively.  Cash  costs 

were  approximately  $15.89  per  silver  ounce  and  all‐in  sustaining  costs  were  approximately  $21.86 

per silver ounce up 31% and 47%, respectively, due to planned lower grade and longer than expected 

mill repairs during the quarter.  

 Guidance for 2017 remains unchanged at 2.0 ‐  2.5 million ounces in silver production and 5.5 ‐  6.0 

million  ounces  of  silver  equivalent  production  with  projected  cash  costs  of  $4.00 ‐  $5.00  per  silver 

ounce and all‐in sustaining cash costs of $9.00 ‐ $10.00 per silver ounce. 

 The San Rafael Project remains on budget and on time for the start of production by the end of Q3, 

2017  despite  recent  ramp  development  challenges  with  poor  ground  conditions.  The  Company 

expects to be back into good ground by the end of April.  

 The Company purchased an option on the San Felipe Project for total payment of $7.0 million (plus 

VAT) in March 2017.  

 At  the  end  of  the  first  quarter,  the  Company  drew  fully  upon  the  $15  million  Glencore  facility  and 

fully  repaid  its  existing  debt  of  approximately  $8.0  million  during  the  quarter.  The  Company’s  cash 

balance at March 31, 2017 was $17.6 million. 

 “As  previously  announced,  the  year  began  slowly  at  Galena  with  expected  lower  grades  and  some 

necessary mill maintenance affecting silver and lead production but we are encouraged for the rest of the 

year with the lower grades, the mill liner changed and the associated backfill challenges behind us,” said 

1  Silver  equivalent  production  throughout  this  press  release  was  calculated  based  on  silver,  zinc,  lead  and  copper  spot  prices 

during each respective period. 

2 Cash cost per ounce and all‐in sustaining cost per ounce are non‐IFRS performance measures with no standardized definition. 

For  further  information  and  detailed  reconciliations,  please  refer  to  the  Company’s  2016  year‐end  and  quarterly  MD&A.  The 

performance  measures  for  the  quarter  ended  March  31,  2017  are  preliminary  throughout  this  press  release  subject  to 

refinement from the Company’s first quarter financial results to be released on or before May 11, 2017. 

2 

Americas Silver President and CEO Darren Blasutti. “Development at San Rafael has recently been slowed 

but  measures  have  been  taken  to  address  the  poor  ground  conditions.  We  anticipate  being  able  to 

resume  our  targeted  development  rate  once  we  are  in  more  competent  ground  in  early  May.   We 

continue to expect to begin production from San Rafael by the end of Q3, 2017 within budget. San Rafael 

will transform the Company to a first‐quartile cash cost producer and generate substantial cash flow in 

2018 and beyond.” 

The Company expects to release its first quarter financial results on or before May 11, 2017. 

Consolidated First Quarter Production Details 

Consolidated  silver  production  for  the  first  quarter  of  2017  was  523,747  ounces  which  represents  a 

decrease  of  7%  over  the  previous  quarter  and  a  decrease  of  22%  year‐over‐year.  Silver  equivalent 

production  was  approximately  1.1  million  ounces,  down  7%  over  the  previous  quarter  and  13%  year‐

over‐year. Consolidated cash costs increased 18% to $10.49 per silver ounce compared to the previous 

quarter  and  7%  year‐over‐year,  and  all‐in  sustaining  costs  increased  23%  to  $14.27  per  silver  ounce 

compared  to  the  previous  quarter  and  19%  year‐over‐year.  Consolidated  production  levels  for  the 

remainder  of  the  year  are  expected  to  improve  and  become  similar  to  fiscal  2016  production  levels 

subsequent to the mill repairs at the Galena Complex during the quarter. 

Table 1 

Consolidated Production Highlights 

  Q1 2017  Q1 2016  Change  Q4 2016  Change 

Processed Ore (tonnes milled)  167,493  175,108 ‐ 4%  168,038 ‐ 1% 

Silver Production (ounces)  523,747  672,074 ‐ 22%  564,475 ‐ 7% 

Silver Equivalent Production (ounces)  1,107,460  1,269,120 ‐ 13%  1,190,381 ‐ 7% 

Silver Grade (grams per tonne)  107  135 ‐ 21%  116 ‐ 7% 

Cost of Sales ($ per equiv. ounce silver)1  $9.91  $9.53  4%  $10.02 ‐ 1% 

Cash Costs ($ per ounce silver)1  $10.49  $9.82  7%  $8.91  18% 

All‐in Sustaining Costs ($ per ounce silver)1  $14.27  $12.02  19%  $11.57  23% 

Zinc Production (pounds)  2,389,133  3,552,522 ‐ 33%  2,671,391 ‐ 11% 

Lead Production (pounds)  6,160,732  7,121,573 ‐ 13%  7,277,346 ‐ 15% 

Copper Production (pounds)  308,100  245,808  25%  260,018  18% 

1   Cost of sales per silver equivalent ounce, cash costs per silver ounce, and all‐in sustaining costs per silver ounce in Q1, 2017 

excludes  pre‐production  of  62,714  silver  ounces  and  89,042  silver  equivalent  ounces  mined  from  El  Cajón  during  its 

commissioning period. Pre‐production revenue and cost of sales from El Cajón are capitalized as development costs. 

Consolidated  production  was  negatively  impacted  by  expected  lower  silver  and  lead  grades  in  the  first 

quarter  and  an  earlier  than  scheduled  mill  liner  replacement  at  the  Company’s  Galena  Complex.  The 

associated  impact  to  the  mine’s  backfill  cycle  as  a  secondary  result  of  this  replacement  also  affected 

production. At the end of December 2016, the Company observed that the mill liner at the Galena Mill 

would  require  replacement  prior  to  the  scheduled  timing  in  late  January  2017.  Local  management 

implemented  temporary  measures  until  the  liners  were  replaced  though  the  measures  resulted  in 

reduced capacity in January and early February.   Backfill to the underground operations was reduced in 

both  January  and  February  as  a  result  of  the  reduced  mill  capacity  impacting  production  during  the 

quarter.  The  liner  replacement  was  completed  in  early  February  however  stope  cycles  affected 

production  output  in  the  higher  grade,  mechanized  stopes  deeper  in  the  mine  as  a  result  of  backfill 

shortages.  In  March  2017,  the  Company  saw  a  return  to  the  planned  milling  capacity  and  grades,  and 

does not expect this situation to impact the results for the remainder of the year.  Offsetting this impact 

3 

was greater than expected output from the Nuestra Señora mine at the Cosalá Operations as it continues 

to outperform expectations ahead of the scheduled mine closure in Q2, 2017.  

During  the  first  quarter,  the  Company  obtained  a  low‐interest,  $15.0  million  concentrate  pre‐payment 

facility with a subsidiary of Glencore PLC to fund a portion of the project costs for San Rafael. At the end 

of the quarter, the facility was drawn in full and the Company fully repaid its previously outstanding debt 

of  approximately  $8.0  million  during  the  quarter.  In  addition,  the  Company  made  a  payment  of 

approximately $7.0 million for purchase of the option to acquire 100% interest of the San Felipe property 

located in Sonora, Mexico. The cash balance as at March 31, 2017 was $17.6 million and the Company 

expects to be able to fully fund the development of San Rafael.  

Cosalá Operations Production Details 

The Cosalá Operations  produced 250,296 ounces  of silver during  the first quarter of 2017 and 536,838 

ounces  of  silver  equivalent  inclusive  of  pre‐production  material  from  El  Cajón.  Excluding  the  El  Cajón 

material, the Cosalá Operations produced 187,582 ounces of silver during the first quarter of 2017 and 

447,796 ounces of silver equivalent during the same period at cost of sales of $7.17 per silver equivalent 

ounce, cash costs of $2.61 per silver ounce and all‐in sustaining costs of $3.21 per silver ounce.  Silver and 

silver  equivalent  production  decreased  19%  and  11%,  respectively,  compared  to  Q1,  2016.  Cash  costs 

improved  by  46%  compared  to  the  previous  quarter  and  decreased  63%  year‐over‐year  while  all‐in 

sustaining costs improved 33% compared to the previous quarter and decreased 63% year‐over‐year.   

Table 2 

Cosalá Operations Highlights 

  Q1 2017  Q1 2016  Change  Q4 2016  Change 

Processed Ore (tonnes milled)  128,577  131,063 ‐ 2%  127,224  1% 

Silver Production (ounces)  250,296  307,580 ‐ 19%  211,075  19% 

Silver Equivalent Production (ounces)  536,838  605,774 ‐ 11%  495,471  8% 

Silver Grade (grams per tonne)  70  88 ‐ 20%  63  11% 

Cost of Sales ($ per equiv. ounce silver) 1  $7.17  $8.19 ‐ 12%  $9.09 ‐ 21% 

Cash Costs ($ per ounce silver) 1  $2.61  $7.12 ‐ 63%  $4.83 ‐ 46% 

All‐in Sustaining Costs ($ per ounce silver) 1  $3.21  $8.59 ‐ 63%  $4.77 ‐ 33% 

Zinc Production (pounds)  2,389,133  3,552,522 ‐ 33%  2,671,391 ‐ 11% 

Lead Production (pounds)  1,124,464  1,510,053 ‐ 26%  1,218,151 ‐ 8% 

Copper Production (pounds)  308,100  245,808  25%  260,018  18% 

1   Cost of sales per silver equivalent ounce, cash costs per silver ounce, and all‐in sustaining costs per silver ounce in Q1, 2017 

excludes  pre‐production  of  62,714  silver  ounces  and  89,042  silver  equivalent  ounces  mined  from  El  Cajón  during  its 

commissioning period. Pre‐production revenue and cost of sales from El Cajón are capitalized as development costs. 

In fiscal 2017, the Company planned  to operate its Nuestra Señora mine through the end of Q1, 2017, 

then  transition  to  the  El  Cajón  mine  through  to  the  commencement  of  production  from  San  Rafael. 

During  Q1,  2017,  the  Nuestra  Señora mine  exceeded  expectations  by  significantly  reducing  cash  costs, 

benefiting  from  its  mix  of  precious  and  base  metals,  and  higher  by‐product  prices  relative  to  last  year. 

Further material has been identified in the mine to extend its life to June 2017 after which plant feed is 

expected  to  transition  to  El  Cajón  ore.  This  extension  of  Nuestra  Señora  should  result  in  better  than 

expected costs in the second quarter.  

El Cajón development was completed at the end of the first quarter including blasting of the slot raise to 

allow  long  hole  production  to  begin.   Processing  of  development  ore  provided  approximately  30,000 

4 

tonnes of mill feed during the quarter.  Management will be monitoring ore requirements closely leading 

up to the anticipated commencement of San Rafael production and efforts will be made to maximize cash 

flow and minimize working capital invested in stockpiles through the transition.  

Development at the Company’s San Rafael deposit and improvements at the Los Braceros plant continues 

to  progress  towards  the  start  of  production  by  the  end  of  Q3,  2017.   In  mid/late  February,  ramp 

development encountered an isolated area of poor ground conditions associated with several faults and 

karst  zones.   As  a  result,  development  slowed  significantly  as  local  management  identified  different 

options  for  progressing  through  these  areas.  A  geotechnical  consultant  was  engaged  to  identify 

appropriate  ground  support  methods  to  develop  through  these  zones.   In  March  2017,  the  Company 

implemented the recommended ground support and continued to advance slowly through the affected 

area.   The Company expects to be back in good ground conditions by the end of April.   Optimization of 

the  mine’s  development  design  has  reduced  the  overall  development  meters  required  to  access  the 

initial ore zone, which will help to offset the current delays with ramp development.   Mill modifications 

are progressing well with work expected to be completed by mid‐July.  Despite these current challenges, 

the Company expects to deliver production from San Rafael on budget by the end of Q3, 2017.  

An  exploration  budget  of  $2  million  has  been  approved  for  the  Cosalá  Operations.   Work  will  focus  on 

upgrading  and  extending  existing  resources  in  the  San  Rafael/El  Cajón  corridor  with  an  emphasis  on 

testing the southeast extension of San Rafael's Zone 120. This drilling is the first exploration drilling at the 

Cosalá Operations in over  4 years. The  Company expects  to update the market on its drilling results at 

both Cosalá and Galena Complex before the end of the second quarter.  

Galena Complex Production Details  

The  Galena  Complex  produced  273,451  ounces  of  silver  during  the  first  quarter  of  2017  and  570,622 

ounces of silver equivalent during the same period at cost of sales of $12.05 per silver equivalent ounce, 

cash  costs  of  $15.89  per  silver  ounce  and  all‐in  sustaining  costs  of  $21.86  per  silver  ounce.   Silver  and 

silver  equivalent  production  decreased  23%  and  18%,  respectively,  compared  to  the  previous  quarter. 

Cash costs were up 40% compared to the previous quarter and 31% year‐over‐year and all‐in sustaining 

costs were up 40% compared to the previous quarter and 47% year‐over‐year.  

Table 3 

Galena Complex Highlights 

  Q1 2017  Q1 2016  Change  Q4 2016  Change 

Processed Ore (tonnes milled)  38,916  44,045 ‐ 12%  40,814 ‐ 5% 

Silver Production (ounces)  273,451  364,494 ‐ 25%  353,400 ‐ 23% 

Silver Equivalent Production (ounces)  570,622  663,346 ‐ 14%  694,910 ‐ 18% 

Silver Grade (grams per tonne)  230  276 ‐ 17%  280 ‐ 18% 

Cost of Sales ($ per equiv. ounce silver)  $12.05  $10.75  12%  $10.69  13% 

Cash Costs ($ per ounce silver)  $15.89  $12.10  31%  $11.35  40% 

All‐in Sustaining Costs ($ per ounce silver)  $21.86  $14.92  47%  $15.63  40% 

Lead Production (pounds)  5,036,268  5,611,520 ‐ 10%  6,059,195 ‐ 17% 

As  previously  noted,  management  budgeted  for  lower  grades  in  the  quarter,  however  the  cumulative 

impact stemming from the Galena mill liner replacement resulted in a decreased level of production from 

the higher grade, deeper mechanized stopes as backfill availability was constrained by the mill shutdown.  

These issues were rectified by the end of the quarter and the Company expects the rest of the year to 

5 

return to the budgeted plan including significantly decreased cash and all‐in sustaining costs per ounce 

compared to the first quarter of 2017.  

SEC Filing 

The  Company  has  filed  its  Form  40‐F  which  includes  the  Audited  Consolidated  Financial  Statements, 

related  Management’s  Discussion  and  Analysis  and  its  Annual  Information  Form  for  the  year  ended 

December 31, 2016, with the Securities and Exchange Commission (“SEC”) on EDGAR on March 31, 2017.  

An  electronic  copy  of  each  document  is  available  on  Americas  Silver  website  at 

www.americassilvercorp.com  and  on  Americas  Silver  Corporation  SEDAR  profile  at  www.sedar.com. 

Shareholders may request a hard copy of the complete audited financial statements free of charge upon 

request.  

About Americas Silver Corporation  

Americas Silver is a silver mining company focused on growth in precious metals from its existing asset 

base  and  execution  of  targeted  accretive  acquisitions.   It  owns  and  operates  the  Cosalá  Operations  in 

Sinaloa, Mexico and the Galena Mine Complex in Idaho, USA. The Company has acquired an option on 

the San Felipe development project in Sonora, Mexico. 

Daren  Dell,  Chief  Operating  Officer  and  a  Qualified  Person  under  Canadian  Securities  Administrators 

guidelines, has approved the applicable contents of this news release. For further information please see 

SEDAR or americassilvercorp.com. 

Cautionary Statement on Forward‐Looking Information: 

This  news  release  contains  “forward‐looking  information”  within  the  meaning  of  applicable  securities 

laws. Forward‐looking information includes, but is not limited to, the Company’s expectations intentions, 

plans,  assumptions  and  beliefs  with  respect  to,  among  other  things,  the  realization  of  operational  and 

development plans (including the San Rafael Project), the Cosalá Operations and Galena Complex as well 

as the Company’s financing efforts. Often, but not always, forward‐looking information can be identified 

by forward‐looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “estimate”, 

“may”, “assume” and “will” or similar words suggesting future outcomes, or other expectations, beliefs, 

plans, objectives, assumptions, intentions, or statements about future events or performance. Forward‐

looking  information  is  based  on  the  opinions  and  estimates  of  the  Company  as  of  the  date  such 

information is provided and is subject to known and unknown risks, uncertainties, and other factors that 

may  cause  the  actual  results,  level  of  activity,  performance,  or  achievements  of  the  Company  to  be 

materially different from those expressed or implied by such forward looking information. This includes 

the  ability  to  develop  and  operate  the  Cosalá  and  Galena  properties,  risks  associated  with  the  mining 

industry such as economic factors (including future commodity prices, currency fluctuations and energy 

prices), ground conditions and other factors limiting mine access, failure of plant, equipment, processes 

and transportation services to operate as anticipated, environmental risks, government regulation, actual 

results of current exploration and production activities, possible variations in ore grade or recovery rates, 

permitting  timelines,  capital  expenditures,  reclamation  activities,  social  and  political  developments  and 

other  risks  of  the  mining  industry.  Although  the  Company  has  attempted  to  identify  important  factors 

that could cause actual results to differ materially from those contained in forward‐looking information, 

there may be other factors that cause results not to be as anticipated, estimated, or intended. Readers 

are  cautioned  not  to  place  undue  reliance  on  such  information.  By  its  nature,  forward‐looking 

information involves numerous assumptions, inherent risks and uncertainties, both general and specific 

that contribute to the possibility that the predictions, forecasts, and projections of various future events 

will  not  occur.  The  Company  undertakes  no  obligation  to  update  publicly  or  otherwise  revise  any 

6 

forward‐looking information whether as a result of new information, future events or other such factors 

which affect this information, except as required by law. 

For more information: 

Darren Blasutti 

President and CEO 

416‐848‐9503