Americas GOLD and Silver Reports Q3‐2023 Results

Financials

1

AMERICAS GOLD AND SILVER REPORTS Q3‐2023 RESULTS 

TORONTO,  ONTARIO  –  November  15,  2023  –  Americas  Gold  and  Silver  CorporaƟon  (TSX:  USA)  (NYSE 

American: USAS) (“Americas” or the “Company”), a growing North American precious metals producer, 

reports consolidated financial and operaƟonal results for the quarter ended September 30, 2023. 

This earnings release should be read in conjuncƟon with the Company’s Management’s Discussion and 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been  posted  on  the  Americas  Gold  and  Silver  CorporaƟon  SEDAR  profile  at  www.sedar.com,  and  on  its 

EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐

gold.com.  All figures are in U.S. dollars unless otherwise noted.  

Highlights 

 Revenue of $18.3 million for Q3‐2023 compared to revenue of $18.3 million for Q3‐2022, resulƟng 

from higher silver producƟon and silver price from the Galena Complex, offset by slightly lower 

base metal producƟon and much lower zinc prices from the Cosalá OperaƟons during the most 

recent period. 

 A net loss of $10.5 million for Q3‐2023, or an aƩributable loss of $0.04 per share represenƟng a 

decrease in net loss of $14.1 million compared to Q3‐2022.  

 As  previously  reported,  Q3‐2023  consolidated  aƩributable  silver  producƟon  rose  17%  totalling 

approximately 0.39 million ounces compared with approximately 0.33 million ounces in Q3‐2022. 

 ProducƟon was negaƟvely impacted early in the quarter by a planned five‐day electrical shutdown 

at  the  Galena  Complex,  as  well  as  mobile  equipment  availability.   The  Cosalá  OperaƟons  had 

various  mill  outages  totalling  14  days  due  to  heavy  rain  and  tailings  work  during  the  Q3‐2023 

period. 

 Q4‐2023  producƟon  has  been  strong  to  date  with  over  190,000  ounces  of  aƩributable  silver 

ounces  produced  in  October .   AƩributable  silver  producƟon  in  November  and  December  are 

expected to exceed October actuals.  

 AƩributable cash costs of $19.01/oz silver produced1 and all‐in sustaining costs of $29.55/oz silver 

produced2 during the quarter .   Cash costs were negaƟvely impacted in the quarter by losing 19 

days of combined producƟon, lower zinc prices and the appreciaƟon in the Mexican peso. 

 Following  the  end  of  the  quarter,  the  Company  commenced  discussions  with  interested  metal 

traders  to  provide  concentrate  prepayment  financing  for  the  capital  requirements  at  its  100%‐

owned El Cajón and Zone 120 silver‐copper project (“EC120 Project”) at the Cosalá OperaƟons. 

The Company expects this financing to close before the end of 2023.  

 The Company has selected Moran Mining and Tunnelling Limited to finish the Galena ShaŌ repair 

work.  Moran  will  begin  fabricaƟng  the  necessary  work  plaƞorms  in  their  shop  and  expects  to 

commission to site in early to mid January 2024. The repair work is expected to be completed by 

the end of Q1‐2024. 

2

 ProducƟon guidance for 2023 remains unchanged but the Company expects to be at lower end of 

both  the  consolidated  aƩributable  silver  producƟon  range  of  2.2  and  2.6  million  ounces  and 

consolidated  aƩributable  silver  equivalent2  producƟon  range  of  5.5  and  6.0  million  ounces  at 

budgeted prices. 

 Darren Dell resigned from his role as COO with the Company during Q4‐2023 to pursue a technical 

role in corporate banking.  Mr . Dell was instrumental in the iniƟal construcƟon and the re‐opening 

of the San Rafael mine, and the driving force behind the re‐capitalizaƟon of the Galena Complex 

Joint Venture.  The Company is expected to announce Daren’s successor prior to year end.  

“The operaƟons had strong silver producƟon in October which is expected to conƟnue for the balance of 

the year, posiƟoning the Company to meet the lower end of its full year silver producƟon targets following 

a  difficult  Q3‐2023,”  stated  Americas  President  and  CEO  Darren  Blasuƫ.   “On  behalf  of  the  Board  of 

Directors, I would like to thank Daren Dell for his leadership, hard work, and dedicaƟon at the Company 

over the previous decade.  Daren posiƟoned the Company’s operaƟons to significantly increase its silver 

producƟon over the next several years in anƟcipaƟon of much stronger silver prices.”  

Galena Complex 

AƩributable producƟon from the 60% owned Galena Complex was approximately 209,000 ounces of silver 

and 1.8 million pounds of lead in Q3‐2023, compared to approximately 145,000 ounces of silver and 2.1 

million pounds of lead in Q3‐2022, represenƟng a 44% increase in silver producƟon and a 13% decrease 

in  lead  producƟon.   ProducƟon  was  negaƟvely  impacted  early  in  the  quarter  by  a  planned  five‐day 

electrical shutdown at the Galena Complex to allow necessary hoist switchgear upgrades.   Towards the 

end of Q3‐2023, the Galana Complex was unable to maintain targeted ore producƟon due to unavailability 

of certain mine mobile equipment.  The availability issue has been largely resolved and has led to a strong 

start in Q4‐2023 though improvements were late to posiƟvely impact Q3‐2023 results.   

Cash costs decreased to  $22.91 per silver ounce from $28.51  per silver ounce  in Q3‐2022 with similar 

decrease to all‐in sustaining costs per silver ounce due to the increase in silver producƟon.  All‐in sustaining 

costs per silver ounce at the Galena Complex is anƟcipated to conƟnue to decrease with the compleƟon 

of the Galena Hoist project as the benefits of economies of scale on the exisƟng cost base are realized. 

The Company selected Moran Mining and Tunnelling Limited to finish the Galena ShaŌ repair work.  Moran 

will begin fabricaƟng the necessary work plaƞorms in their shop and expects to mobilize to site in early to 

mid January 2024.  The repair work is expected to be completed at the end of Q1‐2024.    

Cosalá OperaƟons 

The Cosalá OperaƟons produced approximately 178,000 ounces of silver, 2.8 million pounds of lead and 

9.0 million pounds of zinc in Q3‐2023, compared to approximately 186,000 ounces of silver, 3.8 million 

pounds of lead and 9.4 million pounds of zinc in Q3‐2022.    ProducƟon during the quarter was negaƟvely 

impacted by a cumulaƟve 14 days of lost mill operaƟng Ɵme due to heavy rainfall and tailings maintenance.  

Cash costs per silver ounce increased significantly in the quarter to $14.42 per ounce from $(4.43) per 

ounce in Q3‐2022 due to the lower price of zinc combined with lower base metal producƟon, and the 

devaluaƟon of the USD relaƟve to the Mexican peso.  

With  the  current  higher  silver  price  and  lower  zinc  price,  the  Company  decided  to  expedite  the 

development of its 100%‐owned EC120 Project at the Cosalá OperaƟons.   IniƟal access to the Zone 120 

3

deposit  occurred  in  Q3‐2023  from  the  San  Rafael  Upper  Zone  development  and  approximately  10,000 

tonnes of high‐grade material was stockpiled from the transiƟon area between the deposits. 

The  Company  has  commenced  discussions  in  Q4‐2023  with  interested  metal  traders  to  provide 

concentrate prepayment financing opƟons for the capital requirements at the EC120 Project.   The 2019 

Preliminary Feasibility Study enƟtled “Americas Silver CorporaƟon Technical Report on the San Rafael Mine 

and the EC120 Preliminary Feasibility Study, Sinaloa, Mexico” dated May 17, 2019 (with an effecƟve date 

of  April  3,  2019) capital  esƟmate  assumed  a  standalone  project.   The  current  EC120  Project  will  take 

advantage of exisƟng infrastructure, faciliƟes, and equipment currently in use at the Cosalá OperaƟon’s 

San Rafael Mine.  Assuming the Company’s ability to bring to expected producƟon, the EC120 Project is 

expected  to  provide  significantly  improved  cash  flow  to  the  Company  given  the  shared  infrastructure, 

capital  reducƟons,  and  the  higher  silver  and  copper  prices  which  have  improved  since  the  date  of  the 

study. 

About Americas Gold and Silver CorporaƟon 

Americas  Gold  and  Silver  CorporaƟon  is  a  high‐growth  precious  metals  mining  company  with  mulƟple 

assets  in  North  America.   The  Company  owns  and  operates  the  Cosalá  OperaƟons  in  Sinaloa,  Mexico, 

manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evaluaƟng the Relief Canyon mine in 

Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further 

informaƟon, please see SEDAR or www.americas‐gold.com. 

For more informaƟon: 

Stefan Axell        Darren Blasuƫ 

VP , Corporate Development & CommunicaƟons   President and CEO 

Americas Gold and Silver CorporaƟon     Americas Gold and Silver CorporaƟon 

416‐874‐1708        416‐848‐9503 

Technical InformaƟon and Qualified Persons 

The scienƟfic and technical informaƟon relaƟng to the Company’s material mining properƟes contained 

herein has been reviewed and approved by Chris McCann, P .Eng., Vice President, Technical Services of the 

Company.   The Company’s current Annual InformaƟon Form and the NI 43‐101 Technical Reports for its 

mineral properƟes, all of which are available on SEDAR at www.sedar .com, and EDGAR at www.sec.gov, 

contain  further  details  regarding  mineral  reserve  and  mineral  resource  esƟmates,  classificaƟon  and 

reporƟng parameters, key assumpƟons and associated risks for each of the Company’s material mineral 

properƟes, including a breakdown by category. 

All mining terms used herein have the meanings set forth in NaƟonal Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securiƟes regulatory authoriƟes.  

These standards differ from the requirements of the SEC that are applicable to domesƟc United States 

reporƟng companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, informaƟon contained in this 

news release may not be comparable to similar informaƟon made public by companies subject to the SEC’s 

reporƟng and disclosure requirements. 

4

CauƟonary Statement on Forward‐Looking InformaƟon: 

This news release contains “forward‐looking informaƟon” within the meaning of applicable securiƟes laws.  

Forward‐looking  informaƟon  includes,  but  is  not  limited  to,  Americas  expectaƟons,  intenƟons,  plans, 

assumpƟons and beliefs with respect to, among other things, esƟmated and targeted producƟon rates and 

results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the 

related  costs,  expenses  and  capital  expenditures;  producƟon  from  the  Galena  Complex,  including  the 

expected producƟon levels and potenƟal addiƟonal mineral resources thereat;  the expected Ɵming and 

compleƟon  of  the  Galena  shaŌ  repair  following  compleƟon  of  the  Galena  Hoist  installaƟon  and  the 

expected operaƟonal and producƟon results therefrom, including the anƟcipated improvements to the 

cash costs per silver ounce and all‐in sustaining costs per silver ounce at the Galena Complex following 

compleƟon;  and  mining  and  processing  operaƟons  at   the  Cosalá  OperaƟons  conƟnuing,  including 

expected  producƟon  levels  and  the  conƟnuity  of  legal  access  for  employees  and  contractors;  and 

statements relaƟng to the Company’s EC120 Project, including expected approvals, financing availability 

and  capital  expenditures  required  to  develop  such  project  and  reach  producƟon  thereat,  expectaƟons 

regarding  the ability to rely in  exisƟng infrastructure, faciliƟes, and equipment.   Guidance and outlook 

references contained in this press release were prepared based on current mine plan assumpƟons with 

respect  to  producƟon,  development,  costs  and  capital  expenditures,  the  metal  price  assumpƟons 

disclosed herein, and assumes no adverse impacts to operaƟons from the COVID 19 pandemic, no further 

adverse  impacts  to  the  Cosalá  OperaƟons  from  blockades  or  work  stoppages,  and  compleƟon  of  the 

Galena  Hoist  project  (including  current  shaŌ  repair)  on  its  expected  schedule  and  budget,  and  the 

realizaƟon of the anƟcipated benefits therefrom,   and is subject to the risks and uncertainƟes outlined 

below.   The ability to maintain cash flow posiƟve producƟon at the Cosalá OperaƟons through meeƟng 

producƟon targets and at the Galena Complex through implemenƟng the Galena RecapitalizaƟon Plan, 

including the compleƟon of the Galena Hoist project and related shaŌ repairs on its expected schedule 

and  budget,  allowing  the  Company  to  generate  sufficient  operaƟng  cash  flows  while  facing  market 

fluctuaƟons in commodity prices and inflaƟonary pressures, are significant judgments in the consolidated 

financial statements with respect to the Company’s liquidity.   Should the Company experience negaƟve 

operaƟng  cash  flows  in  future  periods,  the  Company  may  need  to  raise  addiƟonal  funds  through  the 

issuance of equity or debt securiƟes.  OŌen, but not always, forward‐looking informaƟon can be idenƟfied 

by  forward‐looking  words  such  as  “anƟcipate”,  “believe” ,  “expect”,  “goal” ,  “plan” ,  “intend” ,  “potenƟal’ , 

“esƟmate” ,  “may” ,  “assume”  and  “will”  or  similar  words  suggesƟng  future  outcomes,  or  other 

expectaƟons,  beliefs,  plans,  objecƟves,  assumpƟons,  intenƟons,  or  statements  about  future  events  or 

performance.  Forward‐looking informaƟon is based on the opinions and esƟmates of Americas as of the 

date such informaƟon is provided and is subject to known and unknown risks, uncertainƟes, and other 

factors that may cause the actual results, level of acƟvity, performance, or achievements of Americas to 

be materially different from those expressed or implied by such forward‐looking informaƟon.  With respect 

to the business of Americas , these risks and uncertainƟes include risks relaƟng to widespread epidemics 

or pandemic outbreak including the COVID‐19 pandemic, including the emergence of new strains and/or 

the resurgence of COVID‐19, acƟons that have been and may be taken by governmental authoriƟes to 

contain  the  COVID‐19  pandemic  or  to  treat  its  impact  and/or  the  availability,  effecƟveness  and  use  of 

treatments  and  vaccines  (including  the  effecƟveness  of  boosters);  the  impact  of  COVID‐19  on  our 

workforce, suppliers and other essenƟal resources and what effect those impacts, if they occur, would 

have  on  our  business,  including  our  ability  to  access  goods  and  supplies,  the  ability  to  transport  our 

products and impacts on employee producƟvity, the risks in connecƟon with the operaƟons, cash flow and 

5

results  of  the  Company  relaƟng  to  the  unknown  duraƟon  and  impact  of  the  COVID‐19  pandemic; 

interpretaƟons or reinterpretaƟons of geologic informaƟon; unfavorable exploraƟon results; inability to 

obtain permits required for future exploraƟon, development or producƟon; general economic condiƟons 

and  condiƟons  affecƟng  the  industries  in  which  the  Company  operates;  the  uncertainty  of  regulatory 

requirements and approvals; potenƟal liƟgaƟon; fluctuaƟng mineral and commodity prices; the ability to 

obtain  necessary  future  financing  on  acceptable  terms  or  at  all;  the  ability  to  operate  the  Company’s 

projects;  and  risks  associated  with  the  mining  industry  such  as  economic  factors  (including  future 

commodity prices, currency fluctuaƟons and energy prices), ground condiƟons, illegal blockades and other 

factors  limiƟng  mine  access  or  regular  operaƟons  without  interrupƟon,  failure  of  plant,  equipment, 

processes  and  transportaƟon  services  to  operate  as  anƟcipated,  environmental  risks,  government 

regulaƟon, actual results of current exploraƟon and producƟon acƟviƟes, possible variaƟons in ore grade 

or recovery rates, permiƫng Ɵmelines, capital and construcƟon expenditures, reclamaƟon acƟviƟes, labor 

relaƟons  or  disrupƟons,  social  and  poliƟcal  developments,  risks  associated  with  generally  elevated 

inflaƟon  and  inflaƟonary  pressures,  risks  related  to  changing  global  economic  condiƟons,  and  market 

volaƟlity, risks relaƟng to geopoliƟcal instability, poliƟcal unrest, war, and other global conflicts may result 

in adverse effects on macroeconomic condiƟons including volaƟlity in financial markets, adverse changes 

in trade policies, inflaƟon, supply chain disrupƟons and other risks of the mining industry.    Although the 

Company has aƩempted to idenƟfy important factors that could cause actual results to differ materially 

from those contained in forward‐looking informaƟon, there may be other factors that cause results not to 

be as anƟcipated, esƟmated, or intended.   Readers are cauƟoned not to place undue reliance on such 

informaƟon.  AddiƟonal informaƟon regarding the factors that may cause actual results to differ materially 

from  this  forward‐looking  informaƟon  is  available  in  Americas  filings  with  the  Canadian  SecuriƟes 

Administrators on SEDAR and with the SEC.  Americas does not undertake any obligaƟon to update publicly 

or otherwise revise any forward‐looking informaƟon whether as a result of new informaƟon, future events 

or other such factors which affect this informaƟon, except as required by law.  Americas does not give any 

assurance (1) that Americas will achieve its expectaƟons, or (2) concerning the result or Ɵming thereof.  

All subsequent wriƩen and oral forward‐looking informaƟon concerning Americas are expressly qualified 

in their enƟrety by the cauƟonary statements above. 

1 This metric is a non‐GAAP financial measure or raƟo.  The Company uses the financial measures “Cash 

Cost” , “Cash Cost/Ag Oz Produced” , “All‐In Sustaining Cost” , and “All‐In Sustaining Cost/Ag Oz Produced” 

in  accordance  with  measures  widely  reported  in  the  silver  mining  industry  as  a  benchmark  for 

performance  measurement  and  because  it  understands  that,  in  addiƟon  to  convenƟonal  measures 

prepared  in  accordance  with  IFRS,  certain  investors  and  analysts  use  this  informaƟon  to  evaluate  the 

Company’s underlying cash costs and total costs of operaƟons. Cash costs are determined on a mine‐by‐

mine basis and include mine site operaƟng costs such as mining, processing, administraƟon, producƟon 

taxes and royalƟes which are not based on sales or taxable income calculaƟons, while all‐in sustaining 

costs is the cash costs plus all development, capital expenditures, and exploraƟon spending. 

6

Reconciliation of Consolidated Cash Costs/Ag Oz Produced(a) 

   Q3‐2023     Q3‐2022  

Cost of sales ('000)   $17,984     $17,434  

Less non‐controlling interests portion ('000)   (3,614)   (3,599) 

Attributable cost of sales ('000)   14,370     13,835  

Non‐cash costs ('000)   16     (18) 

Direct mining costs ('000)   $14,386     $13,817  

Smelting, refining and royalty expenses ('000)   5,549     5,687  

Less by‐product credits ('000)   (12,583)   (16,187) 

Cash costs ('000)   $7,352     $3,317  

Divided by silver produced (oz)   386,615     331,304  

Cash costs/Ag oz produced ($/oz)   $19.01     $10.01  

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced 

   Q3‐2023     Q3‐2022  

Cost of sales ('000)   $8,949     $8,435  

Non‐cash costs ('000)   11     231  

Direct mining costs ('000)   $8,960     $8,666  

Smelting, refining and royalty expenses ('000)   4,420     4,929  

Less by‐product credits ('000)   (10,820)   (14,419) 

Cash costs ('000)   $2,560     $(824) 

Divided by silver produced (oz)   177,503     186,062  

Cash costs/Ag oz produced ($/oz)   $14.42     $(4.43) 

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced 

   Q3‐2023     Q3‐2022  

Cost of sales ('000)   $9,035     $8,999  

Non‐cash costs ('000)   8   (415) 

Direct mining costs ('000)   $9,043     $8,584  

Smelting, refining and royalty expenses ('000)   1,882     1,264  

Less by‐product credits ('000)   (2,939)   (2,947) 

Cash costs ('000)   $7,986     $6,901  

Divided by silver produced (oz)   348,521     242,070  

Cash costs/Ag oz produced ($/oz)   $22.91     $28.51  

Reconciliation of Consolidated All‐In Sustaining Costs/Ag Oz Produced (a) 

   Q3‐2023     Q3‐2022  

Cash costs ('000)   $7,352     $3,317  

Capital expenditures ('000)   3,434     2,340  

Exploration costs ('000)   640     526  

All‐in sustaining costs ('000)   $11,426     $6,183  

Divided by silver produced (oz)   386,615     331,304  

All‐in sustaining costs/Ag oz produced ($/oz)   $29.55     $18.66  

7

Reconciliation of Cosalá Operations All‐In Sustaining Costs/Ag Oz Produced 

   Q2‐2023     Q3‐2022  

Cash costs ('000)   $2,560     $(824) 

Capital expenditures ('000)   2,077     1,153  

Exploration costs ('000)   198     479  

All‐in sustaining costs ('000)   $4,835     $808  

Divided by silver produced (oz)   177,503     186,062  

All‐in sustaining costs/Ag oz produced ($/oz)   $27.24   $4.35  

Reconciliation of Galena Complex All‐In Sustaining Costs/Ag Oz Produced  

   Q3‐2023     Q3‐2022  

Cash costs ('000)   $7,986     $6,901  

Capital expenditures ('000)   2,263     1,979  

Exploration costs ('000)   737     78  

All‐in sustaining costs ('000)   $10,986     $8,958  

Galena Complex Recapitalization Plan costs ('000)   275     2,858  

All‐in sustaining costs with Galena Recapitalization Plan ('000)   $11,261     $11,816  

Divided by silver produced (oz)   348,521     242,070  

All‐in sustaining costs/Ag oz produced ($/oz)   $31.52     $37.00  

All‐in sustaining costs with Galena Recapitalization/Ag oz produced ($/oz)   $32.31     $48.81  

(a)  Throughout this press release, consolidated producƟon results and consolidated operaƟng metrics are 

based on the aƩributable ownership percentage of each operaƟng segment (100% Cosalá OperaƟons 

and 60% Galena Complex).   

2 Silver equivalent ounces for Q3‐2023 and Q3‐2022 were calculated based on all metals producƟon at 

average realized silver, zinc, and lead prices during each respecƟve period throughout this press 

release.  Silver equivalent ounces for the 2023 guidance and 2024 outlook references were calculated 

based on $22.00/oz silver, $1.45/lb zinc, $1.00 /lb lead, and $3.75/lb copper throughout this press 

release.