Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

USA.TO ·

Americas GOLD and Silver Corporation Reports Second Quarter 2022 Results

Financials

1 

AMERICAS GOLD AND SILVER CORPORATION REPORTS SECOND QUARTER 2022 RESULTS 

TORONTO,  ONTARIO—   August  12,  2022  —Americas   Gold  and  Silver  Corporation  (TSX:  USA)  (NYSE 

American: USAS) (“Americas” or the “Company”), a growing North American precious metals producer, 

reports consolidated financial and operational results for the quarter ended June 30, 2022. 

This  earnings  release  should  be  read  in  conjunction  with  the  Company’s  Management’s  Discussion  and 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been  posted  on  the  Americas  Gold  and  Silver  Corporation  SEDAR  profile  at www.sedar.com,  and  on  its 

EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐

gold.com.  All figures are in U.S. dollars unless otherwise noted. 

Highlights 

● Revenue  of  approximately  $20.0  million  and  a  net  loss  of  $9.3  million  for  Q2‐2022,  or  an 

attributable  loss  of  $0.04  per  share.   Despite  higher  silver  equivalent  production  in  Q2‐2022 

compared to Q1‐2022, revenue decreased by approximately $6.5 million as a result of lower silver 

and lead prices, lower final settlements on concentrate sales, and higher treatment and refining 

costs. 

● Net cash generated from operating activities2 was approximately $7.0 million. 

● The  Company  had  a  cash  and  cash  equivalents  balance  of  $8.8  million  as  of  June  30,  2022, 

compared to a balance of $2.9 million as of December 31, 2021.   

● Total  liabilities  on  the  balance  sheet  were  reduced  in  the  quarter  by  $3.5  million  and  by  $19.4 

million since year end as the Company continues to improve its financial position. 

● The Company previously reported Q2‐2022 consolidated attributable production of approximately 

300,000 silver ounces and 1,343,000 silver equivalent1 ounces.  Silver production was unchanged 

quarter‐over‐quarter and increased 115% year‐over‐year.   Silver equivalent production increased 

by over 5% quarter‐over‐quarter and over 475% year‐over‐year. 

● The Company’s attributable consolidated Q2‐2022 cash costs2 per silver ounce was negative $2.72 

per ounce and consolidated Q2‐2022 all‐in sustaining costs2 per silver ounce was $5.37 per ounce.  

Cash costs continued to benefit from higher by‐product credits than budgeted though increased 

quarter‐over‐quarter  mainly  due  to  increased  employee  retention  costs  and  slightly  higher  raw 

materials and consumable costs.    

● Year‐to‐date attributable silver production of approximately 600,000 ounces at cash costs and all‐

in sustaining costs of negative $6.13 per silver ounce and $1.34 per silver ounce, respectively.  

Year‐to‐ date attributable silver equivalent production is approximately 2.62 million ounces. 

● The Company's silver and silver equivalent production guidance remains unchanged at 1.4 – 1.8 

million  ounces  and  4.8  –  5.2  million  ounces,  respectively  for  2022.   Further  increases  in  silver 

production  to  a  range  of  3.4  –  3.8  million  ounces  and  silver  equivalent  production  to  7.0  –  7.4 

million ounces are projected for 2024, representing increases of approximately 425% and 380%, 

respectively, compared with 2021 production. 

2 

“We are generally pleased with the progress made in the first half of 2022 where we focused on the Cosalá 

Operations  ramp‐up,  the  refurbishment  and  installation  of  the  new  hoist  at  the  Galena  Complex  and 

improving the overall financial position of the Company,” stated Americas Gold and Silver President & CEO 

Darren Blasutti.  “Further, we have stayed on track to meet our silver and silver equivalent production as 

well as our  cost guidance  despite the  many  challenges in  the first half of  the year  including  the Cosalá 

Operations  start‐up,  persistent  Covid  challenges,  volatile  metal  prices,  increasing  inflationary  costs  and 

delays throughout the supply chain.   We are expecting an exciting second half of the year where silver 

production at both mines will noticeably increase due to mining in the Upper Zone at the Cosalá Operations 

and mining higher‐grade silver stopes at the Galena Complex.”    

Cosalá Operations 

The Cosalá Operations had a strong quarter in Q2‐2022.  During another full quarter of production in Q2‐

2022, the Cosalá Operations produced approximately 128,000 ounces of silver, 9.9 million pounds of zinc 

and 3.9 million pounds of lead.  Cash costs per silver ounce and all‐in sustaining costs per silver ounce were 

negative $35.97 and  negative $25.89, respectively,  as the Cosalá Operations  continued to benefit from 

strong by‐product credits.   Cash costs increased versus Q1‐2022 due to higher wages and consumables 

costs.               

The Company expects silver production to increase in H2‐2022 with a growing contribution from higher‐

grade silver areas in the Upper Zone of the San Rafael mine.  Silver production from the Cosalá Operations 

for the year is expected to be towards the bottom end of the projected range of 0.7 to 0.9 million silver 

ounces as the Company focused on mining the higher‐grade zinc Main Zone in H1‐2022 and delay mining 

the higher‐grade silver Upper Zone.  Zinc production from the Cosalá Operations is expected to be towards 

the upper end of the projected range of 36 to 40 million pounds while lead production is also expected to 

be towards the upper end of the projected range of 13 to 15 million pounds. 

Galena Complex 

Attributable  production  from  the  Galena  Complex  was  approximately  171,000  ounces  of  silver  and  2.5 

million pounds of lead in Q2‐2022.  Silver production is expected to increase in H2‐2022 from a combination 

of higher ore tonnage and higher average silver grade.  The Company aims to commission the Galena Hoist 

project in Q4‐2022 which will increase hoisting capacity at the operation once complete.  Cash costs per 

silver  ounce  and  all‐in  sustaining  costs  (excluding  the  Galena  Hoist  project)  per  silver  were  $22.09  and 

$28.67, respectively.  Cash costs per silver ounce and all‐in sustaining costs per silver ounce at the Galena 

Complex are anticipated to improve given that most of the operating costs are fixed and are expected to 

decrease on a per silver ounce basis assuming expected higher silver and lead production beyond 2022 

following completion of the Galena Hoist project.   

The outlook for expected attributable metal production from the Galena Complex in fiscal 2022 remains 

unchanged and is estimated to be 0.7 to 0.9 million silver ounces and 9 to 11 million pounds of lead. 

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets in North America.  The Company owns and operates the Relief Canyon mine in Nevada, USA, the 

Cosalá Operations in Sinaloa, Mexico and manages the 60%‐owned Galena Complex in Idaho, USA.  The 

Company also owns the San Felipe development project in Sonora, Mexico.  For further information, please 

see SEDAR or www.americas‐gold.com.  

3 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The  scientific  and  technical  information  relating  to  the  operation  of  the  Company’s  material  operating 

mining properties contained herein has been reviewed and approved by Daren Dell, P.Eng., Chief Operating 

Officer of the Company.   The Company’s current Annual Information Form and the NI 43‐101 Technical 

Reports for its other material mineral properties, all of which are available on SEDAR at www.sedar.com, 

and  EDGAR  at  www.sec.gov  contain  further  details  regarding  mineral  reserve  and  mineral  resource 

estimates, classification and reporting parameters, key assumptions and associated risks for each of the 

Company’s material mineral properties, including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas  Gold  and  Silver’s  expectations, 

intentions, plans, assumptions and beliefs with respect to, among other things, estimated and targeted 

production rates and results for gold, silver and other metals, the expected prices of gold, silver and other 

metals,  as  well  as  the  related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena 

Complex, including the expected production levels and potential additional mineral resources thereat;  the 

expected timing and completion of the Galena Hoist  project and the expected operational and production 

results  therefrom;  mining  and  processing  operations  at   the  Cosalá  Operations  continuing,  including 

expected production levels and the continuity of legal access for employees and contractors; and the goal 

and  results  of  test  work  intended  to  address  metallurgical  challenges  at  Relief  Canyon.   Guidance  and 

outlook contained in this press release was prepared based on current mine plan assumptions with respect 

to production, development, costs and capital expenditures, the metal price assumptions disclosed herein, 

and  assumes  no  adverse  impacts  to  operations  from  the  COVID  19  pandemic  and  no  further  adverse 

impacts  to  the  Cosalá  Operations  from  blockades  and  is  subject  to  the  risks  and  uncertainties  outlined 

below.   The ability to maintain cash flow positive production at the Cosalá Operations through meeting 

production  targets  and  at  the  Galena  Complex  through  implementing  the  Galena  Recapitalization  Plan, 

allowing  the  Company  to  generate  sufficient  operating  cash  flows  while  facing  market  fluctuations  in 

commodity prices and inflationary pressures, are significant judgments in the Q2‐2022 condensed interim 

consolidated financial statements with respect to the Company’s liquidity.  Should the Company experience 

negative operating cash flows in future periods, the Company may need to raise additional funds through 

the  issuance  of  equity  or  debt  securities.   Often,  but  not  always,  forward‐looking  information  can  be 

4 

identified  by  forward‐looking  words  such  as  “anticipate”,  “believe”,  “expect”,  “goal”,  “plan”,  “intend”, 

“potential’, “estimate”, “may”, “assume” and “will” or similar words suggesting future outcomes, or other 

expectations,  beliefs,  plans,  objectives,  assumptions,  intentions,  or  statements  about  future  events  or 

performance.  Forward‐looking information is based on the opinions and estimates of Americas Gold and 

Silver as of the date such information is provided and is subject to known and unknown risks, uncertainties, 

and  other  factors  that  may  cause  the  actual  results,  level  of  activity,  performance,  or  achievements  of 

Americas  Gold  and  Silver  to  be  materially  different  from  those  expressed  or  implied  by  such  forward‐

looking information.  With respect to the business of Americas Gold and Silver, these risks and uncertainties 

include risks relating to widespread epidemics or pandemic outbreak including the COVID‐19 pandemic, 

including the emergence of new strains and/or the resurgence of COVID‐19, actions that have been and 

may be taken by governmental authorities to contain the COVID‐19 pandemic or to treat its impact and/or 

the availability, effectiveness and use of treatments and vaccines (including the effectiveness of boosters); 

the impact of COVID‐19 on our workforce, suppliers and other essential resources and what effect those 

impacts, if they occur, would have on our business, including our ability to access goods and supplies, the 

ability to transport our products and impacts on employee productivity, the risks in connection with the 

operations,  cash  flow  and  results  of  the  Company  relating  to  the  unknown  duration  and  impact  of  the 

COVID‐19 pandemic; interpretations or reinterpretations of geologic information; unfavorable exploration 

results; inability  to obtain  permits required for future exploration, development or production;  general 

economic  conditions  and  conditions  affecting  the  industries  in  which  the  Company  operates;  the 

uncertainty  of  regulatory  requirements  and  approvals;  fluctuating  mineral  and  commodity  prices;  the 

ability  to  obtain  necessary  future  financing  on  acceptable  terms  or  at  all;  the  ability  to  operate  the 

Company’s  projects;  and  risks  associated  with  the  mining  industry  such  as  economic  factors  (including 

future commodity prices, currency fluctuations and energy prices), ground conditions, illegal blockades and 

other factors limiting mine access or regular operations without interruption, failure of plant, equipment, 

processes  and  transportation  services  to  operate  as  anticipated,  environmental  risks,  government 

regulation, actual results of current exploration and production activities, possible variations in ore grade 

or recovery rates, permitting timelines, capital and construction expenditures, reclamation activities, labor 

relations or disruptions, social and political developments, risks associated with generally elevated inflation 

and inflationary pressures, risks related to changing global economic conditions, and market volatility, risks 

relating  to  geopolitical  instability,  political  unrest,  war,  and  other  global  conflicts  may  result  in  adverse 

effects  on  macroeconomic  conditions  including  volatility  in  financial  markets,  adverse  changes  in  trade 

policies, inflation, supply chain disruptions and other risks of the mining industry.  The potential effects of 

the COVID‐19 pandemic on our business and operations are unknown at this time, including the Company’s 

ability  to  manage  challenges  and  restrictions  arising  from  COVID‐19  in  the  communities  in  which  the 

Company operates and our ability to continue to safely operate and to safely return our business to normal 

operations.  The impact of COVID‐19 on the Company is dependent on a number of factors outside of its 

control  and  knowledge,  including  the  effectiveness  of  the  measures  taken  by  public  health  and 

governmental authorities to combat the spread of the disease, global economic uncertainties and outlook 

due  to  the  disease,  and  the  evolving  restrictions  relating  to  mining  activities  and  to  travel  in  certain 

jurisdictions in which it operates.  Although the Company has attempted to identify important factors that 

could cause actual results to differ materially from those contained in forward‐looking information, there 

may  be  other  factors  that  cause  results  not  to  be  as  anticipated,  estimated,  or  intended.   Readers  are 

cautioned not to place undue reliance on such information.  Additional information regarding the factors 

that  may  cause  actual  results  to  differ  materially  from  this  forward‐looking  information  is  available  in 

Americas Gold and Silver’s filings with the Canadian Securities Administrators on SEDAR and with the SEC.  

Americas Gold and Silver does not undertake any obligation to update publicly or otherwise revise any 

forward‐looking information whether as a result of new information, future events or other such factors 

5 

which  affect  this  information,  except  as  required  by  law.   Americas  Gold  and  Silver  does  not  give  any 

assurance (1) that Americas Gold and Silver will achieve its expectations, or (2) concerning the result or 

timing thereof.   All subsequent written and oral forward‐looking information concerning Americas Gold 

and Silver are expressly qualified in their entirety by the cautionary statements above. 

1 Silver equivalent ounces for the 2022 guidance, and 2023 and 2004 outlook references were calculated 

based on $22.00/oz silver, $0.95/lbs lead and $1.30/lbs zinc throughout this press release.  Silver equivalent 

ounces  for  Q2‐2022,  Q1‐2022  and  prior  periods  in  fiscal  2021  were  calculated  based  on  all  metals 

production at average realized silver, zinc, and lead prices during each respective period throughout this 

press release. 

2 This metric is a non‐GAAP financial measure or ratio.   The Company uses the financial measures “Cash 

Costs”,  “Cash  Costs/Ag  Oz  Produced”,  “All‐In  Sustaining  Costs”,  and  “All‐In  Sustaining  Costs/Ag  Oz 

Produced” in accordance with measures widely reported in the silver mining industry as a benchmark for 

performance  measurement  and  because  it  understands  that,  in  addition  to  conventional  measures 

prepared  in  accordance  with  IFRS,  certain  investors  and  analysts  use  this  information  to  evaluate  the 

Company’s underlying cash costs and total costs of operations. Cash costs are determined on a mine‐by‐

mine basis and include mine site operating costs such as mining, processing, administration, production 

taxes and royalties which are not based on sales or taxable income calculations, while all‐in sustaining costs 

is the cash costs plus all development, capital expenditures, and exploration spending. 

Reconciliation of Consolidated Cash Costs/Ag Oz Produced1 

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cost of sales ('000)  $16,552 ‐   $33,106   ‐ 

Less non‐controlling interests portion ('000)  (3,440) ‐   (6,918) ‐  

Attributable cost of sales ('000)  3,112   ‐  26,188   ‐ 

Non‐cash costs ('000)  71   ‐  (1,725) ‐  

Direct mining costs ('000)  $13,183   ‐  $24,463   ‐ 

Smelting, refining and royalty expenses ('000)  6,447   ‐  12,074   ‐ 

Less by‐product credits ('000)  (20,440) ‐     (40,215) ‐  

Cash costs ('000)  $(810) ‐     $(3,678) ‐  

Divided by silver produced (oz)  299,228   ‐  599,544   ‐ 

Cash costs/Ag oz produced ($/oz)  $(2.72) ‐     $(6.13) ‐  

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced 

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cost of sales ('000)  $7,953 ‐   $15,812   ‐ 

Non‐cash costs ('000)  20 ‐   (1,421) ‐  

Direct mining costs ('000)  $7,973 ‐   $14,391   ‐ 

Smelting, refining and royalty expenses ('000)  5,485   ‐  10,184   ‐ 

Less by‐product credits ('000)  (18,055) ‐   (35,366) ‐  

Cash costs ('000)  $(4,597) ‐   $(10,791) ‐  

Divided by silver produced (oz)  127,803 ‐   254,570   ‐ 

Cash costs/Ag oz produced ($/oz)  $ (35.97) ‐   $(42.39) ‐  

6 

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced 

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cost of sales ('000)  $8,599 ‐   $17,294 ‐  

Non‐cash costs ('000)  85 ‐   (507) ‐  

Direct mining costs ('000)   $8,684 ‐   $16,787 ‐  

Smelting, refining and royalty expenses ('000)  1,603 ‐   3,150 ‐  

Less by‐product credits ('000)  (3,975) ‐   (8,081) ‐  

Cash costs ('000)  $6,312 ‐   $11,856 ‐  

Divided by silver produced (oz)  285,707 ‐   574,956 ‐  

Cash costs/Ag oz produced ($/oz)  $22.09 ‐   $20.62 ‐  

Reconciliation of Consolidated All‐In Sustaining Costs/Ag Oz Produced 1 

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cash costs ('000)  $(809) ‐   $(3,677) ‐  

Capital expenditures ('000)  2,138 ‐   3,761 ‐  

Exploration costs ('000)  278 ‐   722 ‐  

All‐in sustaining costs ('000)  $1,607 ‐   $806 ‐  

Divided by silver produced (oz)  299,228 ‐   599,544 ‐  

All‐in sustaining costs/Ag oz produced ($/oz)  $5.37 ‐   $1.34 ‐  

Reconciliation of Cosalá Operations All‐In Sustaining Costs/Ag Oz Produced 

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cash costs ('000)  $(4,597) ‐   $(10,791) ‐  

Capital expenditures ('000)  1,022   ‐  1,393 ‐  

Exploration costs ('000)  266 ‐   700 ‐  

All‐in sustaining costs ('000)  $(3,309) ‐   $(8,698) ‐  

Divided by silver produced (oz)  127,803 ‐   254,570   ‐ 

All‐in sustaining costs/Ag oz produced ($/oz)  $(25.89) ‐   $(34.17) ‐  

Reconciliation of Galena Complex All‐In Sustaining Costs/Ag Oz Produced  

   Q2‐2022   Q2‐20212   YTD‐2022   YTD‐20212 

Cash costs ('000)  $6,312   ‐  $11,856 ‐  

Capital expenditures ('000)  1,860   ‐  3,946 ‐  

Exploration costs ('000)  20 ‐   37 ‐  

All‐in sustaining costs ('000)  $8,192 ‐   $15,839 ‐  

Galena Complex Recapitalization Plan costs ('000)  2,308 ‐   3,855 ‐  

All‐in sustaining costs with Galena Recapitalization Plan ('000)  $10,500 ‐   $19,694 ‐  

Divided by silver produced (oz)  285,707 ‐   574,956 ‐  

All‐in sustaining costs/Ag oz produced ($/oz)  $28.67 ‐   $27.55 ‐  

All‐in sustaining costs with Galena Recapitalization Plan/Ag oz produced ($/oz)  $36.75 ‐   $34.25 ‐  

1 Throughout this press release, consolidated production results and consolidated operating metrics are based on the 

attributable ownership percentage of each operating segment (100% Cosalá Operations and 60% Galena Complex). 

2   Production results are nil for the Cosalá Operations from Q2‐2020 to Q3‐2021 due to it being placed under care and 

maintenance effective February 2020 as a result of the illegal blockade and exclude the Galena Complex due to suspension of 

certain operating metrics during the Galena Recapitalization Plan implementation. 

7 

The  Company  uses  the  financial  measure  “net  loss  per  share”,  “net  cash  generated  from  operating 

activities”,  and  “working  capital”  because  it  understands  that,  in  addition  to  conventional  measures 

prepared  in  accordance  with  IFRS,  certain  investors  and  analysts  use  this  information  to  evaluate  the 

Company’s liquidity, operational efficiency, and short‐term financial health.  

Net loss per share is consolidated net loss divided by the weighted average number of common shares 

outstanding during the period. 

Reconciliation of Net Loss per Share 

    Q2‐2022   Q2‐2021   YTD‐2022   YTD‐2021 

Consolidated net loss ('000)  $(9,278)  $(17,782)  $(9,574)  $(109,582) 

Divided by weighted average number of common shares outstanding  180,795,755  133,928,463   176,871,371   130,618,095 

Net loss per share  $(0.05)  $(0.13)  $(0.05)  $(0.84) 

Net cash generated from operating activities is a financial measure disclosed in the Company’s statements 

of cash flows determined as cash generated from operating activities, after changes in non‐cash working 

capital items.  

Reconciliation of Net Cash Generated from Operating Activities 

    Q2‐2022   Q2‐2021   YTD‐2022   YTD‐2021 

Cash generated from (used in) operating activities ('000)  $(2,312)  $(5,604)  $4,137  $(12,796) 

Changes in non‐cash working capital items ('000)  9,284  (9,987)  1,012  (19,108) 

Net cash generated from (used in) operating activities ('000)  $6,972  $(15,591)  $5,149  $(31,904) 

Working capital is the excess of current assets over current liabilities.  

Reconciliation of Working Capital       

    Q2‐2022   Q2‐2021 

Current Assets ('000)  $29,091   $29,370 

Less current liabilities ('000)  (38,061)  (39,034) 

Working capital ('000)  $(8,970)  $(9,664)