AMERICAS GOLD AND SILVER CORPORATION REPORTS Q1‐2023 RESULTS 

TORONTO, ONTARIO—  May 15, 2023 —Americas  Gold and Silver Corporation (TSX: USA) (NYSE American: 

USAS)  (“Americas”  or  the  “Company”),  a  growing  North  American  precious  metals  producer,  reports 

consolidated financial and operational results for the quarter ended March 31, 2023. 

This  earnings  release  should  be  read  in  conjunction  with  the  Company’s  Management’s  Discussion  and 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been  posted  on  the  Americas  Gold  and  Silver  Corporation  SEDAR  profile  at www.sedar.com,  and  on  its 

EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐

gold.com.  All figures are in U.S. dollars unless otherwise noted. 

Highlights 

● Revenue of $22.1 million, representing a decrease of $4.3 million year‐over‐year, primarily due to a 

17‐day maintenance shutdown at the Cosalá Operations in February and lower realized metals 

prices. 

● Net cash generated from operating activities improved by $3.5 million to $1.7 million during Q1‐

2023 compared to net cash used in operating activities of $1.8 million during Q1‐2022.  

● A net loss of $10.5 million for Q1‐2023, or an attributable loss of $0.05 per share1, representing an 

increase in net loss of $10.2 million compared to Q1‐2022. The increase in loss was primarily due to 

the maintenance shutdown at the Cosalá Operations, higher interest and financing charges, a 

stronger Mexican peso in Q1‐2023, and a one‐time gain from the US Government loan forgiveness 

that lowered the net loss in Q1‐2022. 

● The Galena Hoist project remains on track with the hoist ropes installed last week ahead of shaft 

inspection and repair beginning this week.  The project is on schedule to be fully operational by the 

end of Q2‐2023. 

● Consolidated attributable production of approximately 1.2 million ounces of silver equivalent2, 

including 0.5 million ounces of silver, 7.2 million pounds of zinc and 5.5 million pounds of lead.  

Consolidated attributable silver production increased 66% year over year despite the quarter being 

impacted by the 17‐day maintenance shutdown at the Cosalá Operations. 

● Attributable cash costs of $11.18/oz silver produced3 and all‐in sustaining costs of $16.87/oz silver 

produced3 during the quarter. 

● Production guidance for 2023 remains unchanged with consolidated attributable silver equivalent 

production expected to range between 5.5 – 6.0 million ounces and consolidated attributable silver 

production expected to increase by over 80% from 2022 and range between 2.2 – 2.6 million 

ounces. 

“The  Galena  Hoist  project  is  making  excellent  progress  with  not  only  the  major  capital  obligations  and 

technical components completed but the shaft repair work about to start,” stated Americas President and 

CEO Darren Blasutti.  “Once operational, the Galena Hoist will not only add flexibility but also support plans 

to significantly increase silver production at the Galena Complex moving forward starting in Q3‐2023.  The 

2 

Company  is  well  positioned  to  deliver  on  its  2023  production  guidance  which  provides  solid  organic 

production growth and offers substantial silver optionality to our stakeholders.”    

Cosalá Operations 

The Cosalá Operations had a successful start to the year despite the 17‐day maintenance shutdown that 

impacted overall production during the quarter.  The Cosalá Operations produced approximately 265,000 

ounces  of  silver,  2.7  million  pounds  of  lead  and  7.2  million  pounds  of  zinc  in  Q1‐2023,  compared  to 

approximately 127,000 ounces of silver (representing an approximate 110% increase year‐over‐year), 3.9 

million pounds of lead and 9.6 million pounds of zinc in Q1‐2022, benefitting from more production from 

the higher‐grade silver areas in the Upper Zone of the San Rafael mine.  Cash cost and all‐in sustaining cost 

were $4.61 per silver ounce and $9.52 per silver ounce, respectively, an increase compared to Q1‐2022 as 

the Company produced more silver and less by‐product zinc and lead. 

Production at the Cosalá Operations during Q1‐2023 was impacted by the 17‐day maintenance shutdown 

to perform remedial work on the decant tunnel at the Cosalá Operations tailings facility as part of the long‐

term environmental plan  at the operations.   This temporary shutdown allowed  the San  Rafael Mine to 

rebuild stockpiles that had been drawn down in 2022 and allowed scheduled maintenance to be carried 

out at the Los Braceros mill, setting the operation up for a strong remainder of 2023.  

Silver production from the Cosalá Operations in 2023 is expected to be between 1.2 – 1.4 million ounces, 

benefitting from more production from the higher‐grade silver areas in the Upper Zone of the San Rafael 

mine.  Zinc production from the Cosalá Operations is expected to be approximately 33 – 37 million pounds 

while lead production is expected to be 11 – 13 million pounds. 

Galena Complex 

Attributable  production  from  the  Galena  Complex  was  approximately  235,000  ounces  of  silver  and  2.8 

million pounds of lead in Q1‐2023, compared to approximately 174,000 ounces of silver (representing an 

approximate 35% increase year‐over‐year) and 2.5 million pounds of lead in Q1‐2022.  Cash cost and all‐in 

sustaining cost were $18.59 per silver ounce and $25.18 per silver ounce, respectively, largely unchanged 

compared  to  Q1‐2022.   All‐in  sustaining  cost  per  silver  ounce  at  the  Galena  Complex  is  anticipated  to 

decrease  with  the  completion  of  the  Galena  Hoist  project  as  the  benefits  of  scaling  economies  on  the 

existing cost base are realized.     

The  Company  began  mining  the  3700  Level  high‐grade  silver  ore  in  mid‐December  2022  and  recently 

started development on the 4300 Level to access the Upper 360 Complex reserve area.   The 4300 Level 

mining front will increase the number of producing stopes and boost production output to coincide with 

the completion of the Galena Hoist.   

The Galena Hoist project remains on track with hoist ropes installed last week ahead of shaft inspection 

and repair beginning this week.  Completion of this phase of hoist commissioning de‐risks the project and 

demonstrates the hoist is mechanically sound and ready for use.  A preliminary inspection of the Galena 

shaft indicated that it was in reasonable condition with no substantial deterioration during the period of 

inactivity.  The Galena Hoist project remains on track to be completed and be fully operational by the end 

of Q2‐2023 which will support plans to increase production, improve operational flexibility and improve 

operational economics.  

Attributable silver production to the Company from the Galena Complex (60% owned by Americas) in 2023 

is expected to be between 1.0 – 1.2 million silver ounces.  Attributable lead production is expected to be 

between  11  –  13  million  pounds.   The  Galena  Complex  attributable  production  for  2022  was  672,000 

ounces of silver and 9.3 million pounds of lead. 

3 

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets  in  North  America.   The  Company  owns  and  operates  the  Cosalá  Operations  in  Sinaloa,  Mexico, 

manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evaluating the Relief Canyon mine in 

Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further 

information, please see SEDAR or www.americas‐gold.com. 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The scientific and technical information relating to the Company’s material mining properties contained 

herein has been reviewed and approved by Daren Dell, P.Eng., Chief Operating Officer of the Company.  

The  Company’s  current  Annual  Information  Form  and  the  NI  43‐101  Technical  Reports  for  its  mineral 

properties, all of which are available on SEDAR at www.sedar.com, and EDGAR at www.sec.gov, contain 

further  details  regarding  mineral  reserve  and  mineral  resource  estimates,  classification  and  reporting 

parameters, key assumptions and associated risks for each of the Company’s material mineral properties, 

including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas’  expectations,  intentions,  plans, 

assumptions and beliefs with respect to, among other things, estimated and targeted production rates and 

results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the 

related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena  Complex,  including  the 

expected production levels and potential additional mineral resources thereat;  the expected timing and 

completion of the Galena Hoist project and the expected operational and production results therefrom, 

including the anticipated improvements to the cash cost per silver ounce and all‐in sustaining cost per silver 

ounce at the Galena Complex following completion; and mining and processing operations at the Cosalá 

Operations  continuing,  including  expected  production  levels  and  the  continuity  of  legal  access  for 

employees  and  contractors.   Guidance  and  outlook  references  contained  in  this  press  release  were 

prepared based on current mine plan assumptions with respect to production, development, costs and 

capital  expenditures,  the  metal  price  assumptions  disclosed  herein,  and  assumes  no  further  adverse 

impacts to the Cosalá Operations from blockades or work stoppages, and completion of the Galena Hoist 

project on its expected schedule and budget, and the realization of the anticipated benefits therefrom,  

and  is  subject  to  the  risks  and  uncertainties  outlined  below.   The  ability  to  maintain  cash  flow  positive 

4 

production  at  the  Cosalá  Operations  through  meeting  production  targets  and  at  the  Galena  Complex 

through  implementing  the  Galena  Recapitalization  Plan,  including  the  completion  of  the  Galena  Hoist 

project on its expected schedule and budget, allowing the Company to generate sufficient operating cash 

flows  while  facing  market  fluctuations  in  commodity  prices  and  inflationary  pressures,  are  significant 

judgments in the consolidated financial statements with respect to the Company’s liquidity.   Should the 

Company  experience  negative  operating  cash  flows  in  future  periods,  the  Company  may  need  to  raise 

additional funds through the issuance of equity or debt securities.  Often, but not always, forward‐looking 

information can be identified by forward‐looking words such as “anticipate”, “believe”, “expect”, “goal”, 

“plan”, “intend”, “potential’, “estimate”, “may”, “assume” and “will” or similar words suggesting future 

outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions, or statements about 

future events or  performance.   Forward‐looking information is based on the  opinions and estimates of 

Americas  as  of  the  date  such  information  is  provided  and  is  subject  to  known  and  unknown  risks, 

uncertainties,  and  other  factors  that  may  cause  the  actual  results,  level  of  activity,  performance,  or 

achievements of Americas to be materially different from those expressed or implied by such forward‐

looking information.  With respect to the business of Americas , these risks and uncertainties include risks 

relating to widespread epidemics or pandemic outbreak including interpretations or reinterpretations of 

geologic  information;  unfavorable  exploration  results;  inability  to  obtain  permits  required  for  future 

exploration,  development  or  production;  general  economic  conditions  and  conditions  affecting  the 

industries  in  which  the  Company  operates;  the  uncertainty  of  regulatory  requirements  and  approvals; 

potential  litigation;  fluctuating  mineral  and  commodity  prices;  the  ability  to  obtain  necessary  future 

financing on acceptable terms or at all; the ability to operate the Company’s projects; and risks associated 

with  the  mining  industry  such  as  economic  factors  (including  future  commodity  prices,  currency 

fluctuations and energy prices), ground conditions, illegal blockades and other factors limiting mine access 

or  regular  operations  without  interruption,  failure  of  plant,  equipment,  processes  and  transportation 

services to operate as anticipated, environmental risks, government regulation, actual results of current 

exploration  and  production  activities,  possible  variations  in  ore  grade  or  recovery  rates,  permitting 

timelines,  capital  and  construction  expenditures,  reclamation  activities,  labor  relations  or  disruptions, 

social  and  political  developments,  risks  associated  with  generally  elevated  inflation  and  inflationary 

pressures,  risks  related  to  changing  global  economic  conditions,  and  market  volatility,  risks  relating  to 

geopolitical  instability,  political  unrest,  war,  and  other  global  conflicts  may  result  in  adverse  effects  on 

macroeconomic  conditions  including  volatility  in  financial  markets,  adverse  changes  in  trade  policies, 

inflation,  supply  chain  disruptions  and  other  risks  of  the  mining  industry.   Although  the  Company  has 

attempted  to  identify  important  factors  that  could  cause  actual  results  to  differ  materially  from  those 

contained  in  forward‐looking  information,  there  may  be  other  factors  that  cause  results  not  to  be  as 

anticipated,  estimated,  or  intended.   Readers  are  cautioned  not  to  place  undue  reliance  on  such 

information.  Additional information regarding the factors that may cause actual results to differ materially 

from  this  forward‐looking  information  is  available  in  Americas  filings  with  the  Canadian  Securities 

Administrators on SEDAR and with the SEC.  Americas does not undertake any obligation to update publicly 

or otherwise revise any forward‐looking information whether as a result of new information, future events 

or other such factors which affect this information, except as required by law.  Americas does not give any 

assurance (1) that Americas will achieve its expectations, or (2) concerning the result or timing thereof.  All 

subsequent written and oral forward‐looking information concerning Americas are expressly qualified in 

their entirety by the cautionary statements above. 

5 

1 The Company uses the financial measure “net loss per share” because it understands that, in addition to 

conventional  measures  prepared  in  accordance  with  IFRS,  certain  investors  and  analysts  use  this 

information to evaluate the Company’s liquidity, operational efficiency, and short‐term financial health.  

Net loss per share is consolidated net loss divided by the weighted average number of common shares 

outstanding during the period. 

Reconciliation of Net Loss per Share 

    Q1‐2023   Q1‐2022 

Consolidated net loss ('000)   $(10,524)   $(296) 

Divided by weighted average number of common shares outstanding  206,204,961  172,903,384  

Net loss per share   $(0.05)   $(0.01) 

2 Silver equivalent ounces for Q1‐2023 and Q1‐2022 were calculated based on all metals production at 

average realized silver, zinc, and lead prices during each respective period throughout this press release.  

Silver  equivalent  ounces  for  the  2023  guidance  and  2024  outlook  references  were  calculated  based  on 

$22.00/oz silver, $1.45/lb zinc, $1.00 /lb lead, and $3.75/lb copper throughout this press release.   

3 This metric is a non‐GAAP financial measure or ratio.   The Company uses the financial measures “Cash 

Cost”, “Cash Cost/Ag Oz Produced”, “All‐In Sustaining Cost”, and “All‐In Sustaining Cost/Ag Oz Produced” 

in accordance with measures widely reported in the silver mining industry as a benchmark for performance 

measurement  and  because  it  understands  that,  in  addition  to  conventional  measures  prepared  in 

accordance  with  IFRS,  certain  investors  and  analysts  use  this  information  to  evaluate  the  Company’s 

underlying cash costs and total costs of operations. Cash costs are determined on a mine‐by‐mine basis 

and  include  mine  site  operating  costs  such  as  mining,  processing,  administration,  production  taxes  and 

royalties which are not based on sales or taxable income calculations, while all‐in sustaining costs is the 

cash costs plus all development, capital expenditures, and exploration spending. 

Reconciliation of Consolidated Cash Costs/Ag Oz Produced1 

   Q1‐2023     Q1‐2022  

Cost of sales ('000)   $17,479     $16,554  

Less non‐controlling interests portion ('000)   (3,959)   (3,478) 

Attributable cost of sales ('000)   13,520     13,076  

Non‐cash costs ('000)   279     (1,796) 

Direct mining costs ('000)   $13,799     $11,280  

Smelting, refining and royalty expenses ('000)   5,242     5,627  

Less by‐product credits ('000)   (13,457)   (19,775) 

Cash costs ('000)   $5,584     $(2,868) 

Divided by silver produced (oz)   499,677     300,316  

Cash costs/Ag oz produced ($/oz)   $11.18     $(9.55) 

6 

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced 

   Q1‐2023     Q1‐2022  

Cost of sales ('000)   $7,582     $7,859  

Non‐cash costs ('000)   292     (1,441) 

Direct mining costs ('000)   $7,874     $6,418  

Smelting, refining and royalty expenses ('000)   4,188     4,699  

Less by‐product credits ('000)   (10,839)   (17,311) 

Cash costs ('000)   $1,223     $(6,194) 

Divided by silver produced (oz)   265,121     126,767  

Cash costs/Ag oz produced ($/oz)   $4.61     $(48.86) 

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced 

   Q1‐2023     Q1‐2022  

Cost of sales ('000)   $9,897     $8,695  

Non‐cash costs ('000)   (21)   (592) 

Direct mining costs ('000)   $9,876     $8,103  

Smelting, refining and royalty expenses ('000)   1,757     1,547  

Less by‐product credits ('000)   (4,364)   (4,106) 

Cash costs ('000)   $7,269     $5,544  

Divided by silver produced (oz)   390,927     289,249  

Cash costs/Ag oz produced ($/oz)   $18.59     $19.17  

Reconciliation of Consolidated All‐In Sustaining Costs/Ag Oz Produced 1 

   Q1‐2023     Q1‐2022  

Cash costs ('000)   $5,584     $(2,868) 

Capital expenditures ('000)   2,419     1,623  

Exploration costs ('000)   427     444  

All‐in sustaining costs ('000)   $8,430     $(801) 

Divided by silver produced (oz)   499,677     300,316  

All‐in sustaining costs/Ag oz produced ($/oz)   $16.87     $(2.67) 

Reconciliation of Cosalá Operations All‐In Sustaining Costs/Ag Oz Produced 

   Q1‐2023     Q1‐2022  

Cash costs ('000)   $1,223     $(6,194) 

Capital expenditures ('000)   1,183     371  

Exploration costs ('000)   119     434  

All‐in sustaining costs ('000)   $2,525     $(5,389) 

Divided by silver produced (oz)   265,121     126,767  

All‐in sustaining costs/Ag oz produced ($/oz)   $9.52     $(42.51) 

7 

Reconciliation of Galena Complex All‐In Sustaining Costs/Ag Oz Produced  

   Q1‐2023     Q1‐2022  

Cash costs ('000)   $7,269     $5,544  

Capital expenditures ('000)   2,060     2,086  

Exploration costs ('000)   514     17  

All‐in sustaining costs ('000)   $9,843     $7,647  

Galena Complex Recapitalization Plan costs ('000)   2,565     1,547  

All‐in sustaining costs with Galena Recapitalization Plan ('000)   $12,408     $9,194  

Divided by silver produced (oz)   390,927     289,249  

All‐in sustaining costs/Ag oz produced ($/oz)   $25.18     $26.44  

All‐in sustaining costs with Galena Recapitalization/Ag oz produced ($/oz)   $31.74     $31.79  

1   Throughout this press release, consolidated production results and consolidated operating metrics are 

based on the attributable ownership percentage of each operating segment (100% Cosalá Operations 

and 60% Galena Complex).