AMERICAS GOLD AND SILVER CORPORATION REPORTS FULL‐YEAR 2023 RESULTS 

TORONTO,  ONTARIO  —   March  28,  2024  —   Americas  Gold  and  Silver  Corporation  (TSX:  USA)  (NYSE 

American: USAS) (“Americas” or the “Company”), a growing North American precious metals producer, 

reports consolidated financial and operational results for the year ended December 31, 2023. 

This  earnings  release  should  be  read  in  conjunction  with  the  Company’s  Management’s  Discussion  and 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been posted on the Americas Gold and Silver Corporation SEDAR+ profile at www.sedarplus.ca, and on its 

EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐

gold.com.  All figures are in U.S. dollars unless otherwise noted. 

● Revenue increased to $89.6 million for 2023 or 5% compared to $85.0 million for 2022, resulting 

from higher silver production, offset by lower mill throughput, lower base metal production, and 

lower realized zinc price during the year. 

● A net loss of $38.2 million for 2023, or an attributable loss of $0.16 per share, including a $6.0 

million impairment and $3.2 million care and maintenance charge at the Relief Canyon property.  

The net loss represents a decrease in net loss of $7.0 million compared to 2022. 

● The Company previously reported that 2023 consolidated attributable silver production increased 

by  56%  totalling  approximately  2.04  million  ounces  compared  with  approximately  1.31  million 

ounces in 2022. 

● Consolidated attributable cash costs of $13.21/oz silver produced[1] and all‐in sustaining costs of 

$20.44/oz silver produced[1] during the year. 

● The Company is in the final stages of negotiation with a global metal trader to provide concentrate 

prepayment financing for the capital requirements at its 100%‐owned El Cajón and Zone 120 silver‐

copper  project  ("EC120  Project")  at  the  Cosalá  Operations.   The  Company  expects  to  close  this 

financing in Q2‐2024 with the goal to be producing higher‐grade silver‐copper concentrates by the 

end of 2024.  

● On  March  27,  2024,  the  Company  closed  its  previously  announced  equity  offerings  for  gross 

proceeds of C$7,800,000 with net proceeds to be used for working capital requirements at the 

Company’s Cosalá Operations and Galena Complex, and for general and administrative purposes. 

“Silver production during 2023 increased by 56% year‐over‐year which represents the Company’s first step 

in increasing its production to more silver‐copper mineralization at the Company’s two producing mines,” 

stated  Americas  President  and  CEO  Darren  Blasutti.   “The  Company  expects  healthy  silver  production 

growth in 2024 and a further step change in 2025 as it brings on its silver‐copper EC120 Project at the 

Cosalá Operations and finishes the maintenance on the Galena shaft.  The Company is also encouraged by 

the impressive high‐grade, silver‐copper mineralization that it has recently drilled near infrastructure at 

the Galena Complex which could positively impact production both near and longer term.”     

Cosalá Operations 

The Cosalá Operations produced approximately 1.1 million ounces of silver, 11.5 million pounds of lead 

and 34.1 million pounds of zinc, compared with approximately 0.6 million ounces of silver, 15.3 million 

pounds of lead and 39.3 million pounds of zinc in 2022.   Silver production for the year increased 73% as 

the Company focused on higher grade silver areas given the increase in silver prices and lower zinc prices. 

2 

Cash costs per silver ounce increased during the year to $8.47 per ounce from $(19.03) per ounce in 2022 

due primarily to the lower price of zinc combined with lower base metal production, and the devaluation 

of the USD relative to the Mexican peso.  In late 2023 Mining began in Zone 120 in areas adjacent to the 

San Rafael Upper Zone with the Company expecting to realize an increase in silver production in the near 

term due the higher‐grade silver areas in the Upper Zone and developed portions of the Zone 120 deposit. 

The  Company  is  in  final  discussions  with  a  metal  trader  to  provide  concentrate  prepayment  financing 

options for the capital requirements at the EC120 Project.  The Company expects to close on this financing 

in Q2‐2024 with the goal of producing higher‐grade silver‐copper concentrates at the EC120 Project by the 

end of 2024. 

Galena Complex 

The  Galena  Complex’s  attributable  silver  production  increased  to  0.9  million  silver  ounces  in  2023 

compared  to  approximately  0.7  million  silver  ounces  in  2022,  or  41%  higher  year‐over‐year.   Lead 

production for 2023 was 9.1 million pounds compared with 9.3 million pounds in 2022. 

All‐in sustaining costs decreased to $28.64 per silver ounce in 2023 from $35.32 per silver ounce in 2022.  

All‐in sustaining costs per silver ounce at the Galena Complex is anticipated to continue to decrease, as the 

benefits of economies of scale on the existing cost base are realized, the Company completes its major 

capital projects and realizes increased silver production from its large resource base at the Galena Complex.

The Galena Shaft Repair project is expected to recommence in Q3‐2024 and is contracted to be completed 

by Moran Mining & Tunneling.   In Q4‐2023, the Galena Complex undertook some critical rehab work on 

the Coeur Shaft to increase total skipping capacity and ensure that necessary waste development above 

3700 Level is possible which will open up new high grade stope areas.  During H1‐2024, the Galena Complex 

anticipates  bringing  two  new  stope  areas  online  which  would  increase  the  production  rate  resulting  in 

critical incremental cash flow which will be directed to the Galena Shaft Repair project. 

The Galena Complex has been actively drilling near mine exploration targets with exciting results including 

an area between the 4600 Level and 4900 Level which had previously been a gap in drilling and has been 

consistently  returning  high‐grade  intercepts  of  attractive  Ag‐Cu  veins.   The  current  drill  program  is 

highlighted by the most recent intercept from Hole 49‐703 as reported in our March 26, 2024 press release: 

● Hole 49‐703:  20,147 g/t silver and 5.9% copper (20,842 g/t silver equivalent[2]) over 2.1 m[3] 

This hole represents one of the highest‐grade intercepts since the Company commenced the Galena Complex 

Recapitalization Program in 2019.   The hole is less than 30 meters from existing mine infrastructure which 

should enable the Company to exploit this area quickly and generate additional silver production in the near 

term following some additional delineation drilling.  

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets  in  North  America.   The  Company  owns  and  operates  the  Cosalá  Operations  in  Sinaloa,  Mexico, 

manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evaluating the Relief Canyon mine in 

Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further 

information, please see SEDAR+ or www.americas‐gold.com. 

Annual Filings 

Consistent with prior years, the auditors' report received from its independent public accounting firm on 

its audited financial statements for the fiscal year ended December 31, 2023, contained a going concern 

3 

emphasis of matter.  Disclosure of this going concern explanatory language is required by Section 610(b) 

of the NYSE MKT Company Guide. 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The  scientific  and  technical  information  relating  to  the  operation  of  the  Company’s  material  operating 

mining properties contained herein has been reviewed and approved by Chris McCann, P.Eng., VP Technical 

Services of the Company.  The Company’s current Annual Information Form and the NI 43‐101 Technical 

Reports for its other material mineral properties, all of which are available on SEDAR+ at www.sedarplus.ca, 

and  EDGAR  at  www.sec.gov,  contain  further  details  regarding  mineral  reserve  and  mineral  resource 

estimates, classification and reporting parameters, key assumptions and associated risks for each of the 

Company’s material mineral properties, including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas’  expectations,  intentions,  plans, 

assumptions and beliefs with respect to, among other things, estimated and targeted production rates and 

results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the 

related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena  Complex,  including  the 

expected number of producing stopes and production levels; the expected timing and completion of the 

Galena Shaft Repair project and the expected operational and production results therefrom, including the 

anticipated improvements to the cash costs per silver ounce and all‐in sustaining costs per silver ounce at 

the Galena Complex following completion; and statements relating to Americas’ EC120 Project, including 

expected approvals, prepayment financing availability and the anticipated time to obtain such financing 

and capital expenditures required to develop such project and reach production thereat, and expectations 

regarding  its  ability  to  rely  on  existing  infrastructure,  facilities,  and  equipment.   Guidance  and  outlook 

references contained in this press release were prepared based on current mine plan assumptions with 

respect to production, development, costs and capital expenditures, the metal price assumptions disclosed 

herein,  and  assumes  no  further  adverse  impacts  to  the  Cosalá  Operations  from  blockades  or  work 

stoppages for any reason, and completion of the shaft repair and shaft rehab work at the Galena Complex 

on its expected schedule and budget, the realization of the anticipated benefits therefrom, and is subject 

to the risks and uncertainties outlined below.  The ability to maintain cash flow positive production at the 

Cosalá  Operations,  which  includes  the  EC120  Project,  through  meeting  production  targets  and  at  the 

Galena Complex through implementing the Galena Recapitalization Plan, including the completion of the 

4 

Galena shaft repair and shaft rehab work on its expected schedule and budget, allowing the Company to 

generate  sufficient  operating  cash  flows  while  facing  market  fluctuations  in  commodity  prices  and 

inflationary pressures, are significant judgments in the consolidated financial statements with respect to 

the Company’s liquidity. Should the Company experience negative operating cash flows in future periods, 

the Company may need to raise additional funds through the issuance of equity or debt securities.  Often, 

but  not  always,  forward‐looking  information  can  be  identified  by  forward‐looking  words  such  as 

“anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “potential’, “estimate”, “may”, “assume” and 

“will”  or  similar  words  suggesting  future  outcomes,  or  other  expectations,  beliefs,  plans,  objectives, 

assumptions, intentions, or statements about future events or performance.  Forward‐looking information 

is  based  on  the  opinions  and  estimates  of  Americas  as  of  the  date  such  information  is  provided  and  is 

subject to known and unknown risks, uncertainties, and other factors that may cause the actual results, 

level of activity, performance, or achievements of Americas to be materially different from those expressed 

or implied by such forward‐looking information.  With respect to the business of Americas, these risks and 

uncertainties include risks relating to widespread epidemics or pandemic outbreak, actions that have been 

and may be taken by governmental authorities to contain such epidemic or pandemic or to treat its impact 

and/or the availability, effectiveness and use of treatments and vaccines (including the effectiveness of 

boosters);  interpretations  or  reinterpretations  of  geologic  information;  unfavorable  exploration  results; 

inability  to  obtain  or  maintain  permits  required  for  exploration,  development  or  production;  general 

economic  conditions  and  conditions  affecting  the  industries  in  which  the  Company  operates;  the 

uncertainty  of  regulatory  requirements  and  approvals;  potential  litigation;  fluctuating  mineral  and 

commodity prices; the ability to obtain necessary future financing on acceptable terms or at all; the ability 

to operate the Company’s projects; and risks associated with the mining industry such as economic factors 

(including  future  commodity  prices,  currency  fluctuations  and  energy  prices),  ground  conditions,  illegal 

blockades  and  other  factors  limiting  mine  access  or  regular  operations  without  interruption,  failure  of 

plant, equipment, processes and transportation services to operate as anticipated, environmental risks, 

government regulation, actual results of current exploration and production activities, possible variations 

in ore grade or recovery rates, permitting timelines, capital and construction expenditures, reclamation 

activities, labor relations or disruptions, social and political developments, risks associated with generally 

elevated  inflation  and  inflationary  pressures,  risks  related  to  changing  global  economic  conditions,  and 

market volatility, risks relating to geopolitical instability, political unrest, war, and other global conflicts 

may result in adverse effects on macroeconomic conditions including volatility in financial markets, adverse 

changes  in  trade  policies,  inflation,  supply  chain  disruptions  and  other  risks  of  the  mining  industry.   

Although the Company has attempted to identify important factors that could cause actual results to differ 

materially from those  contained in forward‐looking information, there may be other factors that  cause 

results not to be as anticipated, estimated, or intended.  Readers are cautioned not to place undue reliance 

on such information.  Additional information regarding the factors that may cause actual results to differ 

materially  from  this  forward‐looking  information  is  available  in  Americas’  filings  with  the  Canadian 

Securities Administrators on SEDAR+ and with the SEC.   Americas does not undertake any obligation to 

update  publicly  or  otherwise  revise  any  forward‐looking  information  whether  as  a  result  of  new 

information, future events or other such factors which affect this information, except as required by law.  

Americas does not give any assurance (1) that Americas will achieve its expectations, or (2) concerning the 

result or timing thereof.  All subsequent written and oral forward‐looking information concerning Americas 

are expressly qualified in their entirety by the cautionary statements above. 

1 This metric is a non‐GAAP financial measure or ratio.   The Company uses the financial measures “Cash 

Cost”, “Cash Cost/Ag Oz Produced”, “All‐In Sustaining Cost”, and “All‐In Sustaining Cost/Ag Oz Produced” 

5 

in accordance with measures widely reported in the silver mining industry as a benchmark for performance 

measurement  and  because  it  understands  that,  in  addition  to  conventional  measures  prepared  in 

accordance  with  IFRS,  certain  investors  and  analysts  use  this  information  to  evaluate  the  Company’s 

underlying cash costs and total costs of operations. Cash costs are determined on a mine‐by‐mine basis 

and  include  mine  site  operating  costs  such  as  mining,  processing,  administration,  production  taxes  and 

royalties which are not based on sales or taxable income calculations, while all‐in sustaining costs is the 

cash costs plus all development, capital expenditures, and exploration spending. 

Reconciliation of Consolidated Cash Costs/Ag Oz Produced(a) 

   2023     2022  

Cost of sales ('000)   $74,292     $64,340  

Less non‐controlling interests portion ('000)   (15,253)   (12,388) 

Attributable cost of sales ('000)   59,039     51,952  

Non‐cash costs ('000)   712     (1,723) 

Direct mining costs ('000)   $59,751     $50,229  

Smelting, refining and royalty expenses ('000)   21,163     24,050  

Less by‐product credits ('000)   (53,927)   (73,274) 

Cash costs ('000)   $26,987     $1,005  

Divided by silver produced (oz)   2,043,053   1,308,201  

Cash costs/Ag oz produced ($/oz)   $13.21     $0.77  

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced 

   2023     2022  

Cost of sales ('000)   $36,160     $33,371  

Non‐cash costs ('000)   1,145     (1,348) 

Direct mining costs ('000)   $37,305     $32,023  

Smelting, refining and royalty expenses ('000)   17,556     20,580  

Less by‐product credits ('000)   (45,556)   (64,710) 

Cash costs ('000)   $9,305     $(12,107) 

Divided by silver produced (oz)   1,098,612     636,246  

Cash costs/Ag oz produced ($/oz)   $8.47     $(19.03) 

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced 

   2023     2022  

Cost of sales ('000)   $38,132     $30,969  

Non‐cash costs ('000)   (721)   (625) 

Direct mining costs ('000)   $37,411     $30,344  

Smelting, refining and royalty expenses ('000)   6,011     5,784  

Less by‐product credits ('000)   (13,951)   (14,274) 

Cash costs ('000)   $29,471     $21,854  

Divided by silver produced (oz)   1,574,068     1,119,925  

Cash costs/Ag oz produced ($/oz)   $18.72     $19.51  

6 

Reconciliation of Consolidated All‐In Sustaining Costs/Ag Oz Produced (a) 

   2023     2022  

Cash costs ('000)   $26,987     $1,005  

Capital expenditures ('000)   12,460     9,031  

Exploration costs ('000)   2,308     2,569  

All‐in sustaining costs ('000)   $41,755     $12,605  

Divided by silver produced (oz)   2,043,053     1,308,201  

All‐in sustaining costs/Ag oz produced ($/oz)   $20.44     $9.64  

Reconciliation of Cosalá Operations All‐In Sustaining Costs/Ag Oz Produced 

   2023     2022  

Cash costs ('000)   $9,305     $(12,107) 

Capital expenditures ('000)   7,129     3,649  

Exploration costs ('000)   835     1,296  

All‐in sustaining costs ('000)   $17,269     $(7,162) 

Divided by silver produced (oz)   1,098,612     636,246  

All‐in sustaining costs/Ag oz produced ($/oz)   $15.72   $(11.26) 

Reconciliation of Galena Complex All‐In Sustaining Costs/Ag Oz Produced  

   2023     2022  

Cash costs ('000)   $29,471     $21,854  

Capital expenditures ('000)   8,885     8,970  

Exploration costs ('000)   2,455     2,122  

All‐in sustaining costs ('000)   $40,811     $32,946  

Galena Complex Recapitalization Plan costs ('000)   4,264     6,608  

All‐in sustaining costs with Galena Recapitalization Plan ('000)   $45,075     $39,554  

Divided by silver produced (oz)   1,574,068     1,119,925  

All‐in sustaining costs/Ag oz produced ($/oz)   $25.93     $29.42  

All‐in sustaining costs with Galena Recapitalization/Ag oz produced 

($/oz) 

 $28.64     $35.32  

(a)  Throughout this press release, consolidated production results and consolidated operating metrics are 

based on the attributable ownership percentage of each operating segment (100% Cosalá Operations 

and 60% Galena Complex).   

2 Silver equivalent grade for drill intercepts were calculated using metal prices of $22.00/oz silver, 

$3.75/lb copper and $0.95/lb lead and equivalent metallurgical recoveries were assumed for all metals 

(silver, lead and copper). 

3 Meters represent “True Width” which is calculated for significant intercepts only and is based on 