Americas GOLD and Silver Corporation Reports First Quarter 2022 Results

Financials

1 

AMERICAS GOLD AND SILVER CORPORATION REPORTS FIRST QUARTER 2022 RESULTS 

TORONTO, ONTARIO—  May 11, 2022 —Americas  Gold and Silver Corporation (TSX: USA) (NYSE American: 

USAS)  (“Americas”  or  the  “Company”),  a  growing  North  American  precious  metals  producer,  reports 

consolidated financial and operational results for the quarter ended March 31, 2022. 

This  earnings  release  should  be  read  in  conjunction  with  the  Company’s  Management’s  Discussion  and 

Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have 

been  posted  on  the  Americas  Gold  and  Silver  Corporation  SEDAR  profile  at www.sedar.com,  and  on  its 

EDGAR profile at www.sec.gov, and which are also available on the Company’s website at www.americas‐

gold.com.  All figures are in U.S. dollars unless otherwise noted. 

Highlights 

● Revenue of $26.4 million and net loss of $0.3 million or a net loss of ($0.00)2 per share in Q1‐2022, 

representing an increase of $16.0 million in revenue and a significant decrease of $91.5 million in 

net loss compared to Q1‐2021. 

● Aggregate  net  income  from  the  Cosalá  Operations  and  60%  owned  Galena  Complex  operating 

segments of $8.5 million during the quarter.  The Cosalá Operations net income increased to $5.6 

million (+347%) and the Galena Complex net income to $2.9 million (+290%) during Q1‐2022 over 

Q1‐2021. 

● Cash  generated  from  operating  activities2,  before  changes  in  non‐cash  working  capital  items, 

increased by $13.6 million in Q1‐2022 over Q1‐2021. 

● Significantly improved balance sheet with the resumption of mining at the Cosalá Operations with 

a return to full production in Q1‐2022.  The Company had a cash and cash equivalents balance of 

$7.1 million as of March 31, 2022, compared to a balance of $2.9 million as of December 31, 2021.  

Over the same period, net working capital2 improved by $17.6 million. 

● The Company previously reported Q1‐2022 consolidated attributable production of approximately 

300,000 silver ounces and 1,274,000 silver equivalent1 ounces.   This improvement represents a 

45% increase in silver production and an 80% increase in silver equivalent production compared 

with Q4‐2021. 

● The Company’s consolidated Q1‐2022 cash costs2 per silver ounce was negative $9.55 per ounce 

and consolidated Q1‐2022 all‐in sustaining costs2 per silver ounce was negative $2.67 per ounce.  

Cash  costs  benefitted  from  the  strong  zinc  and  lead  prices,  which  are  both  higher  than  the 

Company’s budget and may continue to positively impact cash and all‐in sustaining costs moving 

forward.    

● The Company's silver and silver equivalent production guidance remains unchanged at 1.4 – 1.8 

million  ounces  and  4.8  –  5.2  million  ounces,  respectively  for  2022.   Further  increases  in  silver 

production  to  a  range  of  3.4  –  3.8  million  ounces  and  silver  equivalent  production  to  7.0  –  7.4 

million ounces are projected for 2024, representing increases of approximately 425% and 380%, 

respectively, compared with 2021 production.  

2 

“The first quarter of 2022 demonstrated the potential of the Cosalá Operations” stated Americas Gold and 

Silver President & CEO Darren Blasutti.  “With strong silver, zinc, and lead prices, the Company generated 

positive operating cash flow, significantly improved the Company’s balance sheet, and funded the Galena 

Complex growth capital, which will allow the Galena Complex to double silver production over the next 

two  years.   I  expect  this  positive  trend  to  continue  in  subsequent  quarters  with  continued  strong 

production  and  increasing  silver  grades  at  the  Cosalá  Operations  and  the  commissioning  of  the  Galena 

Hoist project in Q4‐2022.”   

Cosalá Operations 

The  Cosalá  Operations  benefitted  from  its  first  full  quarter  of  production  in  Q1‐2022  following  the 

resolution  of  the  illegal  blockade  in  Q4‐2021.   The  Cosalá  Operations  produced  approximately  127,000 

ounces of silver, 9.6 million pounds of zinc and 3.9 million pounds of lead in Q1‐2022.  Cash costs per silver 

ounce and all‐in sustaining costs per silver ounce were negative $48.86 and negative $42.51, respectively, 

as the Cosalá Operations benefitted from strong zinc and lead prices.  The price of both zinc and lead have 

continued to increase in Q2‐2022 on an average basis compared to Q1‐2022 with further potential benefit 

from these two commodities anticipated.               

The  Cosalá  Operations  is  expected  to  increase  silver  production  through  2022  due  to  the  growing 

contribution from higher‐grade silver areas in the Upper Zone of the San Rafael mine in the second half of 

2022.  Silver production from the Cosalá Operations for the year continues to be estimated at 0.7 to 0.9 

million  ounces.   Zinc  production  from  the  Cosalá  Operations  is  expected  to  be  approximately  36  to  40 

million pounds while lead production is expected to be 13 to 15 million pounds. 

Galena Complex 

Attributable  production  from  the  Galena  Complex  was  approximately  174,000  ounces  of  silver  and  2.5 

million  pounds  of  lead  in  Q1‐2022.   Silver  production  is  estimated  to  increase  in  H2‐2022  from  mining 

higher tonnage in higher‐grade silver copper stopes.  The Company aims to commission the Galena Hoist 

project in Q4‐2022 which will increase hoisting capacity at the operation in the near term.  Cash costs per 

silver  ounce  and  all‐in  sustaining  costs  (excluding  the  Galena  Hoist  project)  per  silver  were  $19.17  and 

$26.44, respectively.  Cash costs per silver ounce and all‐in sustaining costs per silver ounce at the Galena 

Complex are anticipated to improve given that most of the operating costs are fixed and are expected to 

decrease on a per silver ounce basis assuming expected higher silver and lead production beyond 2022.   

Attributable metal production from the Galena Complex in 2022 is estimated to be 0.7 to 0.9 million silver 

ounces and 9 to 11 million pounds of lead. 

Relief Canyon  

The Company is committed to continuing efforts to resolve the metallurgical challenges at Relief Canyon.  

An independent metallurgical lab has been contracted to complete a metallurgical test program to evaluate 

process modifications, including the use of blinding agents, to minimize the impact of naturally occurring 

carbonaceous material on gold recovery.  The initial phase is expected to be completed by end of Q2‐2022.  

Based on the success of the initial phase, the Company is expected to initiate larger scale testing in the 

second half of 2022, but does not anticipate making a final determination on proceeding with larger scale 

testing until this initial phase has been completed and the results have been analyzed. 

3 

Financial Liquidity and Update on Annual Filings  

The Company’s liquidity has improved significantly with the restart of the Cosalá Operations and continuing 

operational  improvements  at  the  Galena  Complex  in  the  current  metal  price  environment  leading  to 

improvements in operating cash flow, working capital, net income, and metal production. The Company 

refers  to  its  audited  consolidated  financial  statements  for  the  fiscal  year  ended  December  31,  2021, 

included  in  the  Company’s  Annual  Report  on  Form  40‐F,  which  contained  an  audit  report  from  its 

independent registered public accounting firm with a going concern qualification.3  The Company’s current 

financial statements for the first quarter do not include going concern disclosure.     

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets in North America.  The Company owns and operates the Relief Canyon mine in Nevada, USA, the 

Cosalá Operations in Sinaloa, Mexico and manages the 60%‐owned Galena Complex in Idaho, USA.  The 

Company also owns the San Felipe development project in Sonora, Mexico.  For further information, please 

see SEDAR or www.americas‐gold.com.  

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The  scientific  and  technical  information  relating  to  the  operation  of  the  Company’s  material  operating 

mining properties contained herein has been reviewed and approved by Daren Dell, P.Eng., Chief Operating 

Officer of the Company.   The Company’s current Annual Information Form and the NI 43‐101 Technical 

Reports for its other material mineral properties, all of which are available on SEDAR at www.sedar.com, 

and  EDGAR  at  www.sec.gov  contain  further  details  regarding  mineral  reserve  and  mineral  resource 

estimates, classification and reporting parameters, key assumptions and associated risks for each of the 

Company’s material mineral properties, including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas  Gold  and  Silver’s  expectations, 

intentions, plans, assumptions and beliefs with respect to, among other things, estimated and targeted 

production rates and results for gold, silver and other metals, the expected prices of gold, silver and other 

metals,  as  well  as  the  related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena 

4 

Complex,  including  the  expected  production  levels  and  potential  additional  mineral  resources  thereat; 

mining  and  processing  operations  at   the  Cosalá  Operations  continuing,  including  expected  production 

levels and the continuity of legal access for employees and contractors; and the goal and results of test 

work intended to address metallurgical challenges at Relief Canyon.   Guidance and outlook contained in 

this press release was prepared based on current mine plan assumptions with respect to production, costs 

and capital expenditures, the metal price assumptions disclosed herein, and assumes no adverse impacts 

to operations from the COVID 19 pandemic and no further adverse impacts to the Cosalá Operations from 

blockades  and  is  subject  to  the  risks  and  uncertainties  outlined  below.   Considering  the  recent  illegal 

blockade,  the  ability  to  maintain  cash  flow  positive  production  at  the  Cosalá  Operations,  allowing  the 

Company to generate sufficient operating cash flows, is a significant judgment in the Q1‐2022 condensed 

interim consolidated financial statements with respect to the Company’s liquidity.   Should the Company 

experience  negative  operating  cash  flows  in  future  periods,  the  Company  may  need  to  raise  additional 

funds through the issuance of equity or debt securities.  Often, but not always, forward‐looking information 

can  be  identified  by  forward‐looking  words  such  as  “anticipate”,  “believe”,  “expect”,  “goal”,  “plan”, 

“intend”, “potential’, “estimate”, “may”, “assume” and “will” or similar words suggesting future outcomes, 

or  other  expectations,  beliefs,  plans,  objectives,  assumptions,  intentions,  or  statements  about  future 

events or performance.  Forward‐looking information is based on the opinions and estimates of Americas 

Gold and Silver as of the date such information is provided and is subject to known and unknown risks, 

uncertainties,  and  other  factors  that  may  cause  the  actual  results,  level  of  activity,  performance,  or 

achievements of Americas Gold and Silver to be materially different from those expressed or implied by 

such forward‐looking information.   With respect to the business of Americas Gold and Silver, these risks 

and  uncertainties  include  risks  relating  to  widespread  epidemics  or  pandemic  outbreak  including  the 

COVID‐19 pandemic; the impact of COVID‐19 on our workforce, suppliers and other essential resources 

and what effect those impacts, if they occur, would have on our business, including our ability to access 

goods and supplies, the ability to transport our products and impacts on employee productivity, the risks 

in connection with the operations, cash flow and results of the Company relating to the unknown duration 

and  impact  of  the  COVID‐19  pandemic;  interpretations  or  reinterpretations  of  geologic  information; 

unfavorable exploration results; inability to obtain permits required for future exploration, development 

or production; general economic conditions and conditions affecting the industries in which the Company 

operates; the uncertainty of regulatory requirements and approvals; fluctuating mineral and commodity 

prices; the ability to obtain necessary future financing on acceptable terms or at all; the ability to operate 

the Company’s projects; and risks associated with the mining industry such as economic factors (including 

future commodity prices, currency fluctuations and energy prices), ground conditions, illegal blockades and 

other factors limiting mine access or regular operations without interruption, failure of plant, equipment, 

processes  and  transportation  services  to  operate  as  anticipated,  environmental  risks,  government 

regulation, actual results of current exploration and production activities, possible variations in ore grade 

or recovery rates, permitting timelines, capital and construction expenditures, reclamation activities, labor 

relations  or  disruptions,  social  and  political  developments  and  other  risks  of  the  mining  industry.   The 

potential  effects  of  the  COVID‐19  pandemic  on  our  business  and  operations  are  unknown  at  this  time, 

including  the  Company’s  ability  to  manage  challenges  and  restrictions  arising  from  COVID‐19  in  the 

communities in which the Company operates and our ability to continue to safely operate and to safely 

return our business to normal operations.   The impact of COVID‐19 on the Company is dependent on a 

number of factors outside of its control and knowledge, including the effectiveness of the measures taken 

by  public  health  and  governmental  authorities  to  combat  the  spread  of  the  disease,  global  economic 

uncertainties and outlook due to the disease, and the evolving restrictions relating to mining activities and 

to travel in certain jurisdictions in which it operates.   Although the Company has attempted to identify 

5 

important  factors  that  could  cause  actual  results  to  differ  materially  from  those  contained  in  forward‐

looking information, there may be other factors that cause results not to be as anticipated, estimated, or 

intended.  Readers are cautioned not to place undue reliance on such information.  Additional information 

regarding  the  factors  that  may  cause  actual  results  to  differ  materially  from  this  forward‐looking 

information is available in Americas Gold and Silver’s filings with the Canadian Securities Administrators on 

SEDAR and with the SEC.  Americas Gold and Silver does not undertake any obligation to update publicly 

or otherwise revise any forward‐looking information whether as a result of new information, future events 

or other such factors which affect this information, except as required by law.  Americas Gold and Silver 

does  not  give  any  assurance  (1)  that  Americas  Gold  and  Silver  will  achieve  its  expectations,  or  (2) 

concerning  the  result  or  timing  thereof.   All  subsequent  written  and  oral  forward‐looking  information 

concerning Americas Gold and Silver are expressly qualified in their entirety by the cautionary statements 

above. 

1 Silver equivalent ounces for the 2022 guidance, and 2023 and 2004 outlook references were calculated 

based on $22.00/oz silver, $0.95/lbs lead and $1.30/lbs zinc throughout this press release.  Silver equivalent 

ounces  for  Q1‐2022  and  prior  periods  in  fiscal  2021  were  calculated  based  on  all  metals  production  at 

average realized silver, zinc, and lead prices during each respective period throughout this press release. 

2 This metric is a non‐GAAP financial measure or ratio.   The Company uses the financial measures “Cash 

Costs”,  “Cash  Costs/Ag  Oz  Produced”,  “All‐In  Sustaining  Costs”,  and  “All‐In  Sustaining  Costs/Ag  Oz 

Produced” in accordance with measures widely reported in the silver mining industry as a benchmark for 

performance  measurement  and  because  it  understands  that,  in  addition  to  conventional  measures 

prepared  in  accordance  with  IFRS,  certain  investors  and  analysts  use  this  information  to  evaluate  the 

Company’s underlying cash costs and total costs of operations. Cash costs are determined on a mine‐by‐

mine basis and include mine site operating costs such as mining, processing, administration, production 

taxes and royalties which are not based on sales or taxable income calculations, while all‐in sustaining costs 

is the cash costs plus all development, capital expenditures, and exploration spending. 

Reconciliation of Consolidated Cash Costs/Ag Oz Produced1

Q1-2022 Q1-2021 2

Cost of sales ('000) 16,554 $ -

Less non-controlling interests portion ('000) (3,478) -

Attributable cost of sales ('000) 13,076 -

Non-cash costs ('000) (1,796) -

Direct mining costs ('000) 11,280 $ -

Smelting, refining and royalty expenses ('000) 5,627 -

Less by-product credits ('000) (19,775) -

Cash costs ('000) (2,868)$ -

Divided by silver produced (oz) 300,316 -

Cash costs/Ag oz produced ($/oz) (9.55) $ -

6 

Reconciliation of Cosalá Operations Cash Costs/Ag Oz Produced

Q1-2022 Q1-2021 2

Cost of sales ('000) 7,859$ -

Non-cash costs ('000) (1,441) -

Direct mining costs ('000) 6,418 $ -

Smelting, refining and royalty expenses ('000) 4,699 -

Less by-product credits ('000) (17,311) -

Cash costs ('000) (6,194)$ -

Divided by silver produced (oz) 126,767 -

Cash costs/Ag oz produced ($/oz) (48.86) $ -

Reconciliation of Galena Complex Cash Costs/Ag Oz Produced

Q1-2022 Q1-2021 2

Cost of sales ('000) 8,695$ -

Non-cash costs ('000) (592) -

Direct mining costs ('000) 8,103 $ -

Smelting, refining and royalty expenses ('000) 1,547 -

Less by-product credits ('000) (4,106) -

Cash costs ('000) 5,544$ -

Divided by silver produced (oz) 289,249 -

Cash costs/Ag oz produced ($/oz) 19.17 $ -

Reconciliation of Consolidated All-In Sustaining Costs/Ag Oz Produced1

Q1-2022 Q1-2021 2

Cash costs ('000) (2,868)$ -

Capital expenditures ('000) 1,623 -

Exploration costs ('000) 444 -

All-in sustaining costs ('000) (801) $ -

Divided by silver produced (oz) 300,316 -

All-in sustaining costs/Ag oz produced ($/oz) (2.67) $ -

Reconciliation of Cosalá Operations All-In Sustaining Costs/Ag Oz Produced

Q1-2022 Q1-2021 2

Cash costs ('000) (6,194)$ -

Capital expenditures ('000) 371 -

Exploration costs ('000) 434 -

All-in sustaining costs ('000) (5,389) $ -

Divided by silver produced (oz) 126,767 -

All-in sustaining costs/Ag oz produced ($/oz) (42.51) $ -

7 

1 Throughout this press release, cons olidated production results and consolidated operating metrics are based on the attributable

ownership percentage of each operating segment (100% Cosalá Operations and 60% Galena Complex).

2 Production results are nil for the Cosalá Operations from Q2-2020 to Q3-2021 due to it being placed under care and maintenance

effective February 2020 as a result of the illegal blockade, and exclude the Galena Complex due to suspension of certain

operating metrics during the Galena Recapitalization Plan implementation.

The Company uses the financial measure “net loss per share”, “net cash generated from operating activities”,

and “working capital” because it understands that, in addition to conventional measures prepared in

accordance with IFRS, certain investors and analyst s use this information to evaluate the Company’s

liquidity, operational efficiency, and short-term financial health.

Net loss per share is consolidated net loss divided by the weighted average number of common shares

outstanding during the period.

Net cash generated from operating activities is a financial measure disclosed in the Company’s statements

of cash flows determined as net cash generated fr om operating activities, before changes in non-cash

working capital items.

Working capital is the excess of current assets over current liabilities.

Reconciliation of Galena Complex All-In Sustaining Costs/Ag Oz Produced

Q1-2022 Q1-2021 2

Cash costs ('000) 5,544$ -

Capital expenditures ('000) 2,086 -

Exploration costs ('000) 17 -

All-in sustaining costs ('000) 7,647 $ -

Galena Complex Recapitalization Plan costs ('000) 1,547 -

All-in sustaining costs with Galena Recapitalization Plan ('000) 9,194 $ -

Divided by silver produced (oz) 289,249 -

All-in sustaining costs/Ag oz produced ($/oz) 26.44 $ -

All-in sustaining costs with Galena Recapitalization Plan/Ag oz produced ($/oz) 31.79$ -

Reconciliation of Net Loss per Share

Q1-2022 Q1-2021

Consolidated net loss ('000) (296) $ (91,800)$

Divided by weighted average number of common shares outstanding 172,903,384 127,270,944

Net loss per share (0.00)$ (0.72) $

Reconciliation of Net Cash Generated from Operating Activities

Q1-2022 Q1-2021

Net cash used in operating activities ('000) (1,823) $ (16,313)$

Less changes in non-cash working capital items ('000) 8,272 9,121

Net cash generated from (used in) operating activities ('000) 6,449 $ (7,192)$

Reconciliation of Working Capital

Q1-2022 Q1-2021

Current Assets ('000) 28,974 $ 27,679 $

Less current liabilities ('000) (33,540) (27,884)

Working capital ('000) (4,566) $ (205) $

8 

3 Reference to this information is required by Section 610(b) of the NYSE American Company Guide. It does 

not  represent  any  change  or  amendment  to  any  of  the  Company’s  filings  for  the  fiscal  year  ended 

December 31, 2021.