AMERICAS GOLD AND SILVER CORPORATION PROVIDES Q3‐2023 PRODUCTION RESULTS WITH AN 

INCREASE OF 17% IN ATTRIBUTABLE SILVER PRODUCTION 

TORONTO,  ONTARIO  —   October  30,  2023  —   Americas  Gold  and  Silver  Corporation  (TSX:  USA)  (NYSE 

American: USAS) (“Americas” or the “Company”), a growing North American precious metals producer, is 

pleased to provide its Q3‐2023 production results. 

● Q3‐2023 consolidated attributable silver production rose 17% totalling approximately 0.39 million 

ounces compared with approximately 0.33 million ounces in Q3‐2022.  

● Consolidated attributable silver equivalent1 production in Q3‐2023 was approximately 1.0 million 

ounces  compared  with  approximately  1.3  million  ounces  in  Q3‐2022.   The  reported  silver 

equivalent production was impacted by higher silver prices and lower zinc prices in Q3‐2023 versus 

Q3‐2022 as the Company uses realized quarterly prices in its calculations.   These price changes 

negatively  impacted  the  silver  equivalent  production  calculation  by  approximately  0.3  million 

ounces in Q3‐2023 compared to Q3‐2022.  

● Production  was  negatively  impacted  early  in  the  quarter  by  a  5‐day  electrical  shutdown  at  the 

Galena  Complex  to  allow  necessary  hoist  switchgear  upgrades,  as  well  as  mobile  equipment 

availability.  The Cosalá Operations had various mill outages totalling 14 days due to heavy rain and 

tailings work.  

● The Cosalá Operations has grown its ore stockpile to approximately 25,000 tonnes from zero at the 

beginning of the year.   Further, mining has begun in the transition zone between the San Rafael 

Upper Zone and Zone 120 with approximately 10,000 tonnes mined to‐date.  The Company expects 

to realize an increase in silver production in the near term due the higher‐grade silver areas in the 

Upper Zone and the transition zone. 

● Production is expected to be the highest in Q4‐2023 for calendar 2023 with both operations now 

accessing their highest silver grades for the year. 

● Production guidance for 2023 remains unchanged but the Company expects to be at lower end of 

both  the  consolidated  attributable  silver  production  range  of  2.2  and  2.6  million  ounces  and 

consolidated attributable silver equivalent production range of 5.5 and 6.0 million ounces. 

“October  production  has  started  out  strongly  and  the  Company  is  confident  that  Q4‐2023  will  be  its 

strongest silver production quarter following a challenging operating quarter in Q3‐2023,” stated Americas 

President  and  CEO  Darren  Blasutti.   “The  Company  is  undertaking  numerous  operating  decisions  to 

increase both its overall silver production and its percentage of revenue generated from silver at the two 

operations in the coming quarters as it is anticipating much stronger silver prices in 2024.”      

2 

Consolidated Attributable Production* 

  Q3‐2023  Q3‐2022  % Increase 

(Decrease)  

(Y‐over‐Y) 

Silver Production (ounces)  0.39 Moz  0.33 Moz  17% 

Zinc Production (pounds)  9.0 Mlbs  9.4 Mlbs  (5%) 

Lead Production (pounds)  4.7 Mlbs  5.9 Mlbs  (20%) 

Silver Equivalent Production (ounces)   1.0 Moz  1.3 Moz  (26%) 

* Silver equivalent ounces for Q3‐2023 and Q3‐2022 were calculated based on silver, zinc and lead realized prices during each 

respective period throughout this press release.   Guidance numbers were based on $22.00/oz silver, $1.45/lb zinc and $1.00/lb 

lead.

Attributable production from the 60% owned Galena Complex was approximately 209,000 ounces of silver 

and 1.8 million pounds of lead in Q3‐2023, compared to approximately 145,000 ounces of silver and 2.1 

million  pounds  of  lead  in  Q3‐2022.   Towards  the  end  of  Q3‐2023,  the  Galana  Complex  was  unable  to 

maintain targeted ore production due to mine mobile equipment availability.  The issue has been largely 

resolved and, while improvements were too late to positively impact Q3‐2023 results, October has had a 

strong start.  The Company has found a specialized contractor that it will engage in November to repair the 

badly damaged few hundred feet of the Galena shaft.  

The Cosalá Operations produced approximately 178,000 ounces of silver, 2.8 million pounds of lead and 

9.0 million pounds of zinc in Q3‐2023, compared with approximately 186,000 ounces of silver, 3.8 million 

pounds of lead and 9.4 million pounds of zinc in Q3‐2022.  Production during the quarter was negatively 

impacted by a cumulative 14 days of lost mill operating time due to heavy rainfall and tailings maintenance.  

The majority of the decrease in silver equivalent production compared to the prior year period is a result 

of 25% higher realized silver prices and 25% lower realized zinc prices, impacting the calculation by 0.3 

million ounces.  Production is expected to increase in Q4‐2023 benefiting from the higher‐grade silver areas 

in the Upper Zone of the San Rafael mine and stockpiled production from the Zone 120 deposit. 

The Company’s production is expected to come in at the lower of end of 2023 guidance of attributable 

consolidated  silver  equivalent  production  between  5.5  and  6.0  million  ounces  and  attributable 

consolidated silver production between 2.2 and 2.6 million ounces. 

In  connection  with  contemplated  amendments  to  the  existing  convertible  debentures  held  by  funds 

managed  by  Delbrook  Capital  Advisors  (“Debentures”)  to  provide  an  additional  $2,000,000  in  principal 

amount, the Company has agreed to amend the terms of its existing warrants held by funds managed by 

Delbrook  Capital  Advisors  and  affiliates  (an  aggregate  of  3,500,000  common  share  purchase  warrants, 

“Warrants”) to amend the exercise price from C$0.80 per warrant to C$0.55 per Warrant, a premium of 

25%  to  October  27,  2023  closing  price  of  C$0.44.  The  Warrants  expire  on  June  21,  2026,  and  contain 

customary anti‐dilution provisions, as well as customary blocker language regarding becoming a control 

person without required shareholder and TSX approvals. The amendments will be effective upon the entry 

into definitive documentation, and no earlier than November 13, 2023. 

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets  in  North  America.   The  Company  owns  and  operates  the  Cosalá  Operations  in  Sinaloa,  Mexico, 

manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evaluating the Relief Canyon mine in 

Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further 

information, please see SEDAR or www.americas‐gold.com. 

3 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The  scientific  and  technical  information  relating  to  the  operation  of  the  Company’s  material  operating 

mining properties contained herein has been reviewed and approved by Daren Dell, P.Eng., Chief Operating 

Officer of the Company.   The Company’s current Annual Information Form and the NI 43‐101 Technical 

Reports for its other material mineral properties, all of which are available on SEDAR at www.sedar.com, 

and  EDGAR  at  www.sec.gov,  contain  further  details  regarding  mineral  reserve  and  mineral  resource 

estimates, classification and reporting parameters, key assumptions and associated risks for each of the 

Company’s material mineral properties, including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas  expectations,  intentions,  plans, 

assumptions and beliefs with respect to, among other things, estimated and targeted production rates and 

results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the 

related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena  Complex,  including  the 

expected production levels and potential additional mineral resources thereat;  the expected timing and 

completion of the Galena Hoist project and the expected operational and production results therefrom, 

including the anticipated improvements to the cash costs per silver ounce and all‐in sustaining costs per 

silver ounce at the Galena Complex following completion; and mining and processing operations at   the 

Cosalá Operations continuing, including expected production levels and the continuity of legal access for 

employees  and  contractors;   Guidance  and  outlook  references  contained  in  this  press  release  were 

prepared based on current mine plan assumptions with respect to production, development, costs and 

capital expenditures, the metal price assumptions disclosed herein, and assumes no adverse impacts to 

operations  from  the  COVID  19  pandemic,  no  further  adverse  impacts  to  the  Cosalá  Operations  from 

blockades or work stoppages for any reason, and completion of the Galena Hoist project on its expected 

schedule and budget, and the realization of the anticipated benefits therefrom,  and is subject to the risks 

and  uncertainties  outlined  below.   The  ability  to  maintain  cash  flow  positive  production  at  the  Cosalá 

Operations  through  meeting  production  targets  and  at  the  Galena  Complex  through  implementing  the 

Galena Recapitalization Plan, including the completion of the Galena Hoist project on its expected schedule 

and  budget,  allowing  the  Company  to  generate  sufficient  operating  cash  flows  while  facing  market 

fluctuations in commodity prices and inflationary pressures, are significant judgments in the consolidated 

financial statements with respect to the Company’s liquidity.   Should the Company experience negative 

operating  cash  flows  in  future  periods,  the  Company  may  need  to  raise  additional  funds  through  the 

4 

issuance of equity or debt securities.  Often, but not always, forward‐looking information can be identified 

by forward‐looking words such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “potential’, 

“estimate”,  “may”,  “assume”  and  “will”  or  similar  words  suggesting  future  outcomes,  or  other 

expectations,  beliefs,  plans,  objectives,  assumptions,  intentions,  or  statements  about  future  events  or 

performance.  Forward‐looking information is based on the opinions and estimates of Americas as of the 

date such information is provided and is subject to known and unknown risks, uncertainties, and other 

factors that may cause the actual results, level of activity, performance, or achievements of Americas to be 

materially different from those expressed or implied by such forward‐looking information.  With respect 

to the business of Americas , these risks and uncertainties include risks relating to widespread epidemics 

or pandemic outbreak including the COVID‐19 pandemic, including the emergence of new strains and/or 

the  resurgence  of  COVID‐19,  actions  that  have  been  and  may  be  taken  by  governmental  authorities  to 

contain  the  COVID‐19  pandemic  or  to  treat  its  impact  and/or  the  availability,  effectiveness  and  use  of 

treatments  and  vaccines  (including  the  effectiveness  of  boosters);  the  impact  of  COVID‐19  on  our 

workforce, suppliers and other essential resources and what effect those impacts, if they occur, would have 

on our business, including our ability to access goods and supplies, the ability to transport our products 

and impacts on employee productivity, the risks in connection with the operations, cash flow and results 

of the Company relating to the unknown duration and impact of the COVID‐19 pandemic; interpretations 

or reinterpretations of geologic information; unfavorable exploration results; inability to obtain permits 

required for future exploration, development or production; general economic conditions and conditions 

affecting the industries in which the Company operates; the uncertainty of regulatory requirements and 

approvals; potential litigation; fluctuating mineral and commodity prices; the ability to obtain necessary 

future  financing  on  acceptable  terms  or  at  all;  the  ability  to  operate  the  Company’s  projects;  and  risks 

associated with the mining industry such as economic factors (including future commodity prices, currency 

fluctuations and energy prices), ground conditions, illegal blockades and other factors limiting mine access 

or  regular  operations  without  interruption,  failure  of  plant,  equipment,  processes  and  transportation 

services to operate as anticipated, environmental risks, government regulation, actual results of current 

exploration  and  production  activities,  possible  variations  in  ore  grade  or  recovery  rates,  permitting 

timelines,  capital  and  construction  expenditures,  reclamation  activities,  labor  relations  or  disruptions, 

social  and  political  developments,  risks  associated  with  generally  elevated  inflation  and  inflationary 

pressures,  risks  related  to  changing  global  economic  conditions,  and  market  volatility,  risks  relating  to 

geopolitical  instability,  political  unrest,  war,  and  other  global  conflicts  may  result  in  adverse  effects  on 

macroeconomic  conditions  including  volatility  in  financial  markets,  adverse  changes  in  trade  policies, 

inflation,  supply  chain  disruptions  and  other  risks  of  the  mining  industry.   Although  the  Company  has 

attempted  to  identify  important  factors  that  could  cause  actual  results  to  differ  materially  from  those 

contained  in  forward‐looking  information,  there  may  be  other  factors  that  cause  results  not  to  be  as 

anticipated,  estimated,  or  intended.   Readers  are  cautioned  not  to  place  undue  reliance  on  such 

information.  Additional information regarding the factors that may cause actual results to differ materially 

from  this  forward‐looking  information  is  available  in  Americas  filings  with  the  Canadian  Securities 

Administrators on SEDAR and with the SEC.  Americas does not undertake any obligation to update publicly 

or otherwise revise any forward‐looking information whether as a result of new information, future events 

or other such factors which affect this information, except as required by law.  Americas does not give any 

assurance (1) that Americas will achieve its expectations, or (2) concerning the result or timing thereof.  All 

subsequent written and oral forward‐looking information concerning Americas are expressly qualified in 

their entirety by the cautionary statements above. 

5 

1 Silver equivalent ounces for the 2023 guidance references were calculated based on $22.00/oz silver, 

$1.00/lb lead and $1.45/lb zinc throughout this press release.  Silver equivalent ounces for production in 

Q3‐2023 and Q3‐2022 were calculated based on silver, zinc and lead realized prices during the period 

throughout this press release.