Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

USA.TO ·

Americas GOLD and Silver Corporation Provides Q1‐2023 Production Results

Production Results

1 

AMERICAS GOLD AND SILVER CORPORATION PROVIDES Q1‐2023 PRODUCTION RESULTS 

TORONTO, ONTARIO—  April 13, 2023 —  Americas Gold and Silver Corporation (TSX: USA) (NYSE American: 

USAS) (“Americas” or the “Company”), a growing North American precious metals producer, is pleased to 

provide its Q1‐2023 production results. 

● Q1‐2023  consolidated  attributable  silver  production  totalled  approximately  0.5  million  ounces 

compared with approximately 0.3 million ounces in Q1‐2022, representing a 66% increase year‐

over‐year. 

● Despite the large increase in silver production, Q1‐2023 production was impacted by a two‐and‐a‐

half‐week  shutdown  of  the  Cosalá  Operations  tailings  facility  in  February  in  order  to  perform 

remedial work on the decant tunnel.   

● As a result of the shutdown, Q1‐2023 consolidated attributable silver equivalent1 production was 

down approximately 8% to 1.2 million ounces, compared with Q1‐2022.  

● Silver and silver equivalent production is expected to increase cumulatively quarter‐over‐quarter for 

the remainder of the year.  Production is expected to increase at both the Cosalá Operations and the 

Galena Complex due to the mining of higher‐grade silver zones with additional production benefits 

expected once the Galena Hoist becomes operational, which is expected before the end of Q2‐2023. 

● Production guidance for 2023 remains unchanged with consolidated attributable silver equivalent 

production expected to range between 5.5 and 6.0 million ounces and consolidated attributable 

silver production expected to range between 2.2 and 2.6 million ounces. 

● Mining  operations  at  the  Galena  Complex  have  resumed  today  after  they  were  temporarily 

suspended  for  two  days  following  a  tragic  incident  that  resulted  in  the  fatality  of  a  Company 

employee on April 11, 2023. 

“The Company had a strong operational start to the year, despite a 17‐day operating shutdown in Mexico 

in  February,”  stated  Americas  President  and  CEO  Darren  Blasutti.   “The  Company  will  continue  on  its 

positive  silver  production  momentum  and  is  reiterating  its  2023  production  guidance,  with  further 

production increases expected in 2024.  These increases are anticipated to deliver solid organic production 

growth and offer substantial silver optionality to our stakeholders over the next several years.”    

Consolidated Attributable Production* 

  Q1‐2023  Q1‐2022  % Increase (Decrease)  

(Y‐over‐Y) 

Silver Production (ounces)  0.5 Moz  0.3 Moz  66% 

Zinc Production (million pounds)  7.2 Mlbs  9.6 Mlbs  (25%) 

Lead Production (million pounds)  5.5 Mlbs  6.4 Mlbs  (13%) 

Silver Equivalent Production (ounces)   1.2 Moz  1.3 Moz  (7%) 

* Silver equivalent ounces for Q1‐2023 and Q1‐2022 were calculated based on silver, zinc and lead realized prices during each 

respective period throughout this press release.

2 

The Cosalá Operations produced approximately 265,000 ounces of silver, 2.7 million pounds of lead and 

7.2 million pounds of zinc in Q1‐2023, compared to approximately 127,000 ounces of silver, 3.9 million 

pounds  of  lead  and  9.6  million  pounds  of  zinc  in  Q1‐2022,  benefitting  from  more  production  from  the 

higher‐grade silver areas in the Upper Zone of the San Rafael mine. 

Production at the Cosalá Operations during Q1‐2023 was impacted by a two‐and‐a‐half‐week shutdown in 

February in order to perform remedial work on the decant tunnel at the Cosalá Operations tailings facility 

as part of the long‐term environmental plan at the operations.  This temporary shutdown allowed the San 

Rafael Mine to rebuild stockpiles that had been drawn down in 2022 and allowed scheduled maintenance 

to be carried out at the Los Braceros mill, setting the operation up for a strong remainder of 2023. 

Attributable  production  from  the  Galena  Complex  was  approximately  235,000  ounces  of  silver  and  2.8 

million pounds of lead in Q1‐2023, compared to approximately 174,000 ounces of silver and 2.5 million 

pounds of lead in Q1‐2022.  

The  Company  began  mining  the  3700  Level  high‐grade  silver  ore  in  mid‐December  2022  and  recently 

started development on the 4300 Level to access the Upper 360 Complex reserve area.   The 4300 Level 

mining front will increase the number of producing stopes and boost production output to coincide with 

the completion of the Galena Hoist.   The Galena Hoist project remains on track to be completed and be 

fully  operational  by  the  end  of  Q2‐2023  which  will  support  plans  to  increase  production,  improve 

operational flexibility and improve operational economics due to the benefits of scaling production on the 

existing cost base. 

The Galena Complex resumed mining operations following a tragic incident which resulted in the fatality 

of an underground miner on Tuesday, April 11, 2023.   The Company continues to work closely with the 

Mine Safety and Health Administration (MSHA) to investigate this incident.  

The  Company’s  production  guidance  for  2023  remains  unchanged  with  attributable  consolidated  silver 

equivalent production expected to range between 5.5 and 6.0 million ounces and attributable consolidated 

silver production forecast between 2.2 and 2.6 million ounces. 

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth  precious  metals  mining  company  with  multiple 

assets  in  North  America.   The  Company  owns  and  operates  the  Cosalá  Operations  in  Sinaloa,  Mexico, 

manages the 60%‐owned Galena Complex in Idaho, USA, and is re‐evaluating the Relief Canyon mine in 

Nevada, USA.    The Company also owns the San Felipe development project in Sonora, Mexico.  For further 

information, please see SEDAR or www.americas‐gold.com. 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Technical Information and Qualified Persons 

The  scientific  and  technical  information  relating  to  the  operation  of  the  Company’s  material  operating 

mining properties contained herein has been reviewed and approved by Daren Dell, P.Eng., Chief Operating 

Officer of the Company.   The Company’s current Annual Information Form and the NI 43‐101 Technical 

Reports for its other material mineral properties, all of which are available on SEDAR at www.sedar.com, 

and  EDGAR  at  www.sec.gov,  contain  further  details  regarding  mineral  reserve  and  mineral  resource 

3 

estimates, classification and reporting parameters, key assumptions and associated risks for each of the 

Company’s material mineral properties, including a breakdown by category. 

All mining terms used herein have the meanings set forth in National Instrument 43‐101 – Standards of 

Disclosure for Mineral Projects (“NI 43‐101”), as required by Canadian securities regulatory authorities.  

These standards differ from the requirements of the SEC that are applicable  to domestic  United States 

reporting companies.  Any mineral reserves and mineral resources reported by the Company in accordance 

with NI 43‐101 may not qualify as such under SEC standards. Accordingly, information contained in this 

news release may not be comparable to similar information made public by companies subject to the SEC’s 

reporting and disclosure requirements. 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas  expectations,  intentions,  plans, 

assumptions and beliefs with respect to, among other things, estimated and targeted production rates and 

results for gold, silver and other metals, the expected prices of gold, silver and other metals, as well as the 

related  costs,  expenses  and  capital  expenditures;  production  from  the  Galena  Complex,  including  the 

expected production levels and potential additional mineral resources thereat;  the expected timing and 

completion of the Galena Hoist project and the expected operational and production results therefrom, 

including the anticipated improvements to the cash costs per silver ounce and all‐in sustaining costs per 

silver ounce at the Galena Complex following completion; mining and processing operations at  the Cosalá 

Operations  continuing,  including  expected  production  levels  and  the  continuity  of  legal  access  for 

employees  and  contractors;  and  the  expected  timing  and  results  of  the  MSHA  investigation  into  the 

incident resulting in the fatality of the mining employee at the Galena Complex .   Guidance and outlook 

references contained in this press release were prepared based on current mine plan assumptions with 

respect to production, development, costs and capital expenditures, the metal price assumptions disclosed 

herein, and assumes no adverse impacts to operations from the COVID 19 pandemic, no further adverse 

impacts to the Cosalá Operations from blockades or work stoppages, and completion of the Galena Hoist 

project on its expected schedule and budget, and the realization of the anticipated benefits therefrom,  

and  is  subject  to  the  risks  and  uncertainties  outlined  below.   The  ability  to  maintain  cash  flow  positive 

production  at  the  Cosalá  Operations  through  meeting  production  targets  and  at  the  Galena  Complex 

through  implementing  the  Galena  Recapitalization  Plan,  including  the  completion  of  the  Galena  Hoist 

project on its expected schedule and budget, allowing the Company to generate sufficient operating cash 

flows  while  facing  market  fluctuations  in  commodity  prices  and  inflationary  pressures,  are  significant 

judgments in the consolidated financial statements with respect to the Company’s liquidity.   Should the 

Company  experience  negative  operating  cash  flows  in  future  periods,  the  Company  may  need  to  raise 

additional funds through the issuance of equity or debt securities.  Often, but not always, forward‐looking 

information can be identified by forward‐looking words such as “anticipate”, “believe”, “expect”, “goal”, 

“plan”, “intend”, “potential’, “estimate”, “may”, “assume” and “will” or similar words suggesting future 

outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions, or statements about 

future events or  performance.   Forward‐looking information is based on the  opinions and estimates of 

Americas  as  of  the  date  such  information  is  provided  and  is  subject  to  known  and  unknown  risks, 

uncertainties,  and  other  factors  that  may  cause  the  actual  results,  level  of  activity,  performance,  or 

achievements of Americas to be materially different from those expressed or implied by such forward‐

looking information.  With respect to the business of Americas , these risks and uncertainties include risks 

relating to widespread epidemics or pandemic outbreak including the COVID‐19 pandemic, including the 

emergence of new strains and/or the resurgence of COVID‐19, actions that have been and may be taken 

4 

by  governmental  authorities  to  contain  the  COVID‐19  pandemic  or  to  treat  its  impact  and/or  the 

availability, effectiveness and use of treatments and vaccines (including the effectiveness of boosters); the 

impact  of  COVID‐19  on  our  workforce,  suppliers  and  other  essential  resources  and  what  effect  those 

impacts, if they occur, would have on our business, including our ability to access goods and supplies, the 

ability to transport our products and impacts on employee productivity, the risks in connection with the 

operations,  cash  flow  and  results  of  the  Company  relating  to  the  unknown  duration  and  impact  of  the 

COVID‐19 pandemic; interpretations or reinterpretations of geologic information; unfavorable exploration 

results; inability  to obtain  permits required for future exploration, development or production;  general 

economic  conditions  and  conditions  affecting  the  industries  in  which  the  Company  operates;  the 

uncertainty  of  regulatory  requirements  and  approvals;  potential  litigation;  fluctuating  mineral  and 

commodity prices; the ability to obtain necessary future financing on acceptable terms or at all; the ability 

to operate the Company’s projects; and risks associated with the mining industry such as economic factors 

(including  future  commodity  prices,  currency  fluctuations  and  energy  prices),  ground  conditions,  illegal 

blockades  and  other  factors  limiting  mine  access  or  regular  operations  without  interruption,  failure  of 

plant, equipment, processes and transportation services to operate as anticipated, environmental risks, 

government regulation, actual results of current exploration and production activities, possible variations 

in ore grade or recovery rates, permitting timelines, capital and construction expenditures, reclamation 

activities, labor relations or disruptions, social and political developments, risks associated with generally 

elevated  inflation  and  inflationary  pressures,  risks  related  to  changing  global  economic  conditions,  and 

market volatility, risks relating to geopolitical instability, political unrest, war, and other global conflicts 

may result in adverse effects on macroeconomic conditions including volatility in financial markets, adverse 

changes in trade policies, inflation, supply chain disruptions and other risks of the mining industry.   The 

potential  effects  of  the  COVID‐19  pandemic  on  our  business  and  operations  are  unknown  at  this  time, 

including  the  Company’s  ability  to  manage  challenges  and  restrictions  arising  from  COVID‐19  in  the 

communities in which the Company operates and our ability to continue to safely operate and to safely 

return our business to normal operations.   The impact of COVID‐19 on the Company is dependent on a 

number of factors outside of its control and knowledge, including the effectiveness of the measures taken 

by  public  health  and  governmental  authorities  to  combat  the  spread  of  the  disease,  global  economic 

uncertainties and outlook due to the disease, and the evolving restrictions relating to mining activities and 

to travel in certain jurisdictions in which it operates.   Although the Company has attempted to identify 

important  factors  that  could  cause  actual  results  to  differ  materially  from  those  contained  in  forward‐

looking information, there may be other factors that cause results not to be as anticipated, estimated, or 

intended.  Readers are cautioned not to place undue reliance on such information.  Additional information 

regarding  the  factors  that  may  cause  actual  results  to  differ  materially  from  this  forward‐looking 

information is available in Americas filings with the Canadian Securities Administrators on SEDAR and with 

the SEC.  Americas does not undertake any obligation to update publicly or otherwise revise any forward‐

looking  information  whether  as  a  result  of  new  information,  future  events  or  other  such  factors  which 

affect this information, except as required by law.  Americas does not give any assurance (1) that Americas 

will achieve its expectations, or (2) concerning the result or timing thereof.  All subsequent written and oral 

forward‐looking information concerning Americas are expressly qualified in their entirety by the cautionary 

statements above. 

1 Silver equivalent ounces for the 2023 guidance references were calculated based on $22.00/oz silver, 

$1.00/lb lead and $1.45/lb zinc throughout this press release.  Silver equivalent ounces for production in 

Q1‐2023 and Q1‐2022 were calculated based on silver, zinc and lead realized prices during the period 

throughout this press release.