AMERICAS GOLD AND SILVER ANNOUNCES SIGNIFICANT INCREASE TO GALENA COMPLEX RESOURCE  

TORONTO,  ONTARIO—September   14,  2020—Americas   Gold  and  Silver  Corporation  (TSX:  USA)  (NYSE 

American: USAS) (“Americas” or the “Company”), a growing North American precious metals producer, 

provides an update to its Mineral Reserve and Resource statement as at June 30, 2020. 

On a consolidated and attributable basis, estimated contained metal in the proven and probable mineral 

reserve categories totalled 610,000 ounces of gold, 30.6 million ounces of silver, 134 million pounds of zinc, 

129 million pounds of lead and 28 million pounds of copper.  Please refer to the Company’s website for a 

full breakdown of its Mineral Reserve and Mineral Resource statement by asset. 

2020 Mineral Reserve and Mineral Resource Update Highlights 

● Since the June 2019 Mineral Reserve and Resource statement, exploration drilling was focused solely 

at the Galena Complex as the Company constructed and commissioned Relief Canyon. 

● Drilling to date at the Galena Complex includes approximately 33% of planned exploration drilling 

based on the Galena Complex Recapitalization Plan (“Recapitalization Plan”). 

● Based  on  this  initial  drilling  at  the  Galena  Complex,  measured  and  indicated  (“M&I”)  silver 

resources on a 100% basis (60% USA/40% Eric Sprott) increased from 27.4 million ounces to 37.3 

million  ounces  and  inferred  silver  resources  increased  from  39.0  million  ounces  to  78.6  million 

ounces.  This represents a 36% and 101% increase, respectively, from previous reported estimates.   

“I  am  pleased  to  see  the  initial  exploration  efforts  at  the  Galena  Complex  translating  into  meaningful 

increases to silver resources in such a short time,” stated Americas President and CEO Darren Blasutti.  “A 

significant amount of drilling remains planned for deeper levels of the Galena Complex.   I am confident 

that with this drilling we will see continued increases to silver resources and eventually convert these silver 

resources to silver reserves.  As Relief Canyon ramps up to commercial production and we continue efforts 

to re‐start the Cosalá Operations, we expect a renewed focus on exploration efforts at these operations in 

the future.” 

Mineral Reserve and Mineral Resource Statement – June 30, 20201 

Proven and Probable Mineral Reserves – 100% basis for all assets except the Galena Complex at 60% 

Gold and Silver Mineral Reserves 

  Proven  Probable  Proven and Probable 

  Tonnes  Grade  Ounces  Tonnes  Grade  Ounces  Tonnes  Grade  Ounces 

  (kt)  (g/t)  (koz)  (kt)  (g/t)  (koz)  (kt)  (g/t)  (koz) 

Total Gold  13,272  0.85  361  11,542  0.67  249  24,814  0.77  610 

Total Silver  14,255  17  7,663  15,950  45  22,932  30,205  32  30,596 

Zinc, Lead and Copper Mineral Reserves 

  Proven  Probable  Proven and Probable 

  Tonnes  Grade  Pounds  Tonnes  Grade  Pounds  Tonnes  Grade  Pounds 

  (kt)  (%)  (Mlbs)  (kt)  (%)  (Mlbs)  (kt)  (%)  (Mlbs) 

Total Zinc  758  3.34  55.8  1,095  3.25  78.5  1,853  3.29  134.2 

Total Lead  894  2.32  45.7  1,438  2.63  83.3  2,332  2.51  129.0 

Total Copper  89  0.50  1.0  2,970  0.42  27.4  3,059  0.42  28.3 

2 

The primary focus for the Company over the last year was the construction of the Relief Canyon mine in 

Nevada.    As  a  result,  a  limited  amount  of  capital  was  allocated  to  drilling  to  expand  or  delineate  gold 

reserves or resources.  With limited drilling conducted at Relief Canyon and the Cosalá Operations, coupled 

with mined depletion, gold reserves decreased by 7% while silver reserves decreased by 5%.  At the Galena 

Complex, reserves were relatively flat with increases to reserves offsetting depletion.  The current focus of 

the Recapitalization Plan is on silver resource expansion ahead of reserve development.   

As Relief Canyon continues to ramp up towards commercial production and the Company seeks to achieve 

the restart of mining activities at the Cosalá Operations, the Company expects to generate meaningful cash 

flow from its operations and expand the exploration drilling budgets at these two operations, in addition 

to the continued drilling at the Galena Complex pursuant to the Recapitalization Plan. 

Measured & Indicated Mineral Resources – 100% basis for all assets except the Galena Complex at 60% 

Gold and Silver Mineral Resources – Exclusive of Mineral Reserves 

  Measured  Indicated  Measured and Indicated 

  Tonnes  Grade  Ounces  Tonnes  Grade  Ounces  Tonnes  Grade  Ounces 

  (kt)  (g/t)  (koz)  (kt)  (g/t)  (koz)  (kt)  (g/t)  (koz) 

Total Gold  613  0.76  15  1,579  0.56  29  2,192  0.62  44 

Total Silver  2,435  162  12,668  12,299  100  39,513  14,735  110  52,181 

Zinc, Lead and Copper Mineral Resources – Exclusive of Mineral Reserves 

  Measured  Indicated  Measured and Indicated 

  Tonnes  Grade  Pounds  Tonnes  Grade  Pounds  Tonnes  Grade  Pounds 

  (kt)  (%)  (Mlbs)  (kt)  (%)  (Mlbs)  (kt)  (%)  (Mlbs) 

Total Zinc  1,383  2.42  73.9  8,133  3.98  713.3  9,515  3.75  787.2 

Total Lead  1,587  1.83  64.1  8,966  2.29  453.0  10,553  2.22  517.1 

Total Copper  492  0.43  4.7  3,634  0.29  22.9  4,126  0.30  27.6 

As part of the joint venture with Eric Sprott at the Galena Complex, the Company began an exploration 

drilling  campaign  funded  through  the  Recapitalization  Plan.   With  initial  drilling  success  at  Galena,  the 

Company increased its total M&I silver resource from 47.8 million ounces to 52.2 million ounces.   

At the Galena Complex, the Company’s share of M&I silver resources increased from 16.4 million ounces 

to 22.4 million ounces, a 36% increase compared to last year.  M&I lead resources increased by over 55% 

year over year to 158 million pounds.   This growth reflects results from just 33% of the drilling included 

under the Recapitalization Plan.   The Company has recently started drilling deeper extensions of known 

mineralization  at  the  Galena  Complex  including  further  drilling  of  the  72  Vein,  which  was  a  major 

contributor of ore during its peak silver production years of 2000‐2004.   In addition to targeting the 72 

Vein, exploration will focus on what has been described as the “triple point”, where the high‐grade 175, 

185 and Silver Veins are projected to converge.  This area has never been explored and is projected to be 

below historical workings.   Follow‐up drilling on the 291 and 360 Vein systems is also planned from the 

5500 level and is designed to extend these zones down‐dip.   The Company expects further increases to 

M&I resources as the current exploration program continues through the start of 2021. 

3 

Inferred Mineral Resources – 100% basis for all assets except the Galena Complex at 60% 

Gold and Silver Mineral Resources 

  Inferred 

  Tonnes  Grade  Ounces 

  (kt)  (g/t)  (koz) 

Total Gold  3,087  0.27  27 

Total Silver  11,164  167  59,996 

Zinc, Lead and Copper Mineral Resources  

  Inferred 

  Tonnes  Grade  Pounds 

  (kt)  (%)  (Mlbs) 

Total Zinc  4,386  2.54  245.7 

Total Lead  7,024  3.85  595.5 

Total Copper  3,063  0.35  23.5 

Silver inferred resources benefitted significantly from the initial drilling at the Galena Complex pursuant to 

the Recapitalization Plan.  Total inferred silver ounces for the Company increased from 36.2 million ounces 

to 60.0 million ounces.    

The Company’s share of the inferred silver resources at the Galena Complex increased from 23.4 million 

ounces  to  47.1  million  ounces,  representing  more  than  a  100%  increase  from  the  previously  reported 

estimate.  The Company’s share of inferred lead resources at the Galena Complex increased by 77% to 476 

million pounds from the previously reported estimate.  With the remaining drilling considered under the 

Recapitalization  Plan,  the  Company  is  confident  that  inferred  resources  will  increase,  offset  by  any 

upgrades in resource classification in next year’s Mineral Resource estimate. 

About Americas Gold and Silver Corporation 

Americas  Gold  and  Silver  Corporation  is  a  high‐growth,  precious  metals  mining  company  with  multiple 

assets in North America.  The Company’s Relief Canyon mine in Nevada, USA, has poured first gold and is 

expected to ramp up to full production over the course of 2020.  The Company also owns and operates the 

Cosalá Operations in Sinaloa, Mexico and manages the 60%‐owned Galena Complex in Idaho, USA.   The 

Company has completed the outstanding option acquisition agreement for the San Felipe development 

project  in  Sonora,  Mexico,  subject  to  closing  conditions.   For  further  information,  please  see  SEDAR  or 

www.americas‐gold.com. 

For more information: 

Stefan Axell        Darren Blasutti 

VP, Corporate Development & Communications   President and CEO 

Americas Gold and Silver Corporation     Americas Gold and Silver Corporation 

416‐874‐1708        416‐848‐9503 

Qualified Persons  

Shawn Wilson, VP Technical Services, who is an employee of the Company and a “qualified person” under 

National Instrument 43‐101, has approved the applicable contents of this news release.   See “Notes for 

Mineral  Reserve  and  Mineral  Resource  Estimates”  below  regarding  matters  relating  to  review  and 

verification  of  sampling,  analytical  and  test  data  underlying  the  information  contained  in  the  written 

disclosure.  

4 

Cautionary Statement on Forward‐Looking Information: 

This news release contains “forward‐looking information” within the meaning of applicable securities laws.  

Forward‐looking  information  includes,  but  is  not  limited  to,  Americas  Gold  and  Silver’s  expectations, 

intentions, plans, assumptions and beliefs with respect to, among other things, estimated production rates 

and results for gold, silver and other precious metals, as well as the related costs, expenses and capital 

expenditures, the Company’s construction, production, development plans and performance expectations 

at  the  Relief  Canyon  Mine,  its  ability  to  finance,  develop  and  operate  Relief  Canyon,  including  the 

anticipated timing of commercial production at Relief Canyon, the resumption of mining and processing 

operations  at  the  Company’s  Cosalá  Operations  following  the  end  of  the  illegal  blockade  and  expected 

silver production levels at the Cosalá Operations, the Company’s plans with respect to the EC120 zone and 

the  completion  of  the  Company’s  purchase  of  the  remaining  interest  in  the  San  Felipe  Project  from 

Hochschild.  Often, but not always, forward‐looking information can be identified by forward‐looking words 

such as “anticipate”, “believe”, “expect”, “goal”, “plan”, “intend”, “potential’, “estimate”, “may”, “assume” 

and “will” or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, 

assumptions, intentions, or statements about future events or performance.  Forward‐looking information 

is  based  on  the  opinions  and  estimates  of  Americas  Gold  and  Silver  as  of  the  date  such  information  is 

provided and is subject to known and unknown risks, uncertainties, and other factors that may cause the 

actual results, level of activity, performance, or achievements of Americas Gold and Silver to be materially 

different  from  those  expressed  or  implied  by  such  forward‐looking  information.   With  respect  to  the 

business  of  Americas  Gold  and  Silver,  these  risks  and  uncertainties  include  risks  relating  to  widespread 

epidemics  or  pandemic  outbreak  including  the  COVID‐19  pandemic;  the  impact  of  COVID‐19  on  our 

workforce, suppliers and other essential resources and what effect those impacts, if they occur, would have 

on our business, including our ability to access goods and supplies, the ability to transport our products 

and impacts on employee productivity, the risks in connection with the operations, cash flow and results 

of the Company relating to the unknown duration and impact of the COVID‐19 pandemic; interpretations 

or reinterpretations of geologic information; unfavorable exploration results; inability to obtain permits 

required for future exploration, development or production; general economic conditions and conditions 

affecting the industries in which the Company operates; the uncertainty of regulatory requirements and 

approvals; fluctuating mineral and commodity prices; the ability to obtain necessary future financing on 

acceptable terms or at all; the ability to develop, complete construction, bring to production and operate 

the Relief Canyon Project; and risks associated with the mining industry such as economic factors (including 

future commodity prices, currency fluctuations and energy prices), ground conditions and other factors 

limiting  mine  access,  failure  of  plant,  equipment,  processes  and  transportation  services  to  operate  as 

anticipated,  environmental  risks,  government  regulation,  actual  results  of  current  exploration  and 

production activities, possible variations in ore grade or recovery rates, permitting timelines, capital and 

construction  expenditures,  reclamation  activities,  labor  relations  or  disruptions,  social  and  political 

developments and other risks of the mining industry.  The potential effects of the COVID‐19 pandemic on 

our  business  and  operations  are  unknown  at  this  time,  including  the  Company’s  ability  to  manage 

challenges and restrictions arising from COVID‐19 in the communities in which the Company operates and 

our ability to continue to safely operate and to safely return our business to normal operations.  The impact 

of COVID‐19 on the Company is dependent on a number of factors outside of its control and knowledge, 

including the effectiveness of the measures taken by public health and governmental authorities to combat 

the spread of the disease, global economic uncertainties and outlook due to the disease, and the evolving 

restrictions relating to mining activities and to travel in certain jurisdictions in which it operate.  Although 

the Company has attempted to identify important factors that could cause actual results to differ materially 

5 

from those contained in forward‐looking information, there may be other factors that cause results not to 

be  as  anticipated,  estimated,  or  intended.   Readers  are  cautioned  not  to  place  undue  reliance  on  such 

information.  Additional information regarding the factors that may cause actual results to differ materially 

from this forward‐looking information is available in Americas Gold and Silver’s filings with the Canadian 

Securities Administrators on SEDAR and with the SEC.  Americas Gold and Silver does not undertake any 

obligation to update publicly or otherwise revise any forward‐looking information whether as a result of 

new information, future events or other such factors which affect this information, except as required by 

law.  Americas Gold and Silver does not give any assurance (1) that Americas Gold and Silver will achieve 

its expectations, or (2) concerning the result or timing thereof.  All subsequent written and oral forward‐

looking information concerning Americas Gold and Silver are expressly qualified in their entirety by the 

cautionary statements above. 

Cautionary Note to U.S. Investors: 

The  terms  “mineral  resource”,  “measured  mineral  resource”,  “indicated  mineral  resource”,  “inferred 

mineral resource” used in the press release are Canadian mining terms used in accordance with National 

Instrument  43‐101 ‐   Standards  of  Disclosure  for  Mineral  Projects  under  the  guidelines  set  out  in  the 

Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum  Standards.   Mineral  resources  which  are  not 

mineral reserves do not have demonstrated economic viability.  

While  the  terms  “mineral  resource”,  “measured  mineral  resource”,  “indicated  mineral  resource”,  and 

“inferred mineral resource” are recognized and required by Canadian regulations, they are not defined 

terms  under  standards  in  the  United  States  and  normally  are  not  permitted  to  be  used  in  reports  and 

registration  statements  filed  with  the  Securities  &  Exchange  Commission  (“SEC”).  As  such,  information 

contained  in  the  Company's  disclosure  concerning  descriptions  of  mineralization  and  resources  under 

Canadian standards may not be comparable to similar information made public by U.S companies in SEC 

filings.   With  respect  to  “inferred  mineral  resource”  there  is  a  great  amount  of  uncertainty  as  to  their 

existence and a great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all 

or any part of an “inferred mineral resource” will ever be upgraded to a higher category.  Investors are 

cautioned  not  to  assume  that  any  part  or  all  of  the  mineral  deposits  in  these  categories  will  ever  be 

converted into reserves.  

1 Notes for Mineral Reserve and Mineral Resource Estimates: 

CIM (2014) Definition and Standards were followed for Mineral Reserve and Mineral Resource Estimates.  

Mineral Reserves are estimated at a net smelter return (“NSR”) cut‐off value of US$50/tonne at San Rafael, 

$45/tonne at El Cajón, $45/tonne at Zone 120 and $198/tonne at Galena.  Mineral Reserves are estimated 

at a 0.17g/tonne gold cut‐off grade constrained by an open pit design based on a $1,300 gold pseudoflow 

pit shell.   The NSR cut‐off is calculated using recent operating results for recoveries, off‐site concentrate 

costs,  and  on‐site  operating  costs.   Mineral  Reserves  are  estimated  using  metal  prices  of  US$1,300  per 

ounce of gold, $17.00 per ounce of silver, $2.50 per pound of copper, $0.90 per pound of lead and $0.90 per 

pound of zinc.  Numbers may not add or multiply accurately due to rounding.  

Mineral Resources are estimated at a NSR cut‐off value of US$34/tonne at San Rafael, $US45/tonne at El 

Cajón, $45/tonne at Zone 120 and $198/tonne at Galena.  Mineral Resources are estimated at a 90g/tonne 

silver  equivalent  cut‐off  grade  at  Nuestra  Señora.   Mineral  Resources  are  estimated  at  a  2.5%  zinc 

equivalent cut‐off grade at San Felipe.  Mineral Resources are estimated at a 0.17g/tonne gold cut‐off grade 

at Relief Canyon and are constrained by a $1,500 gold pseudoflow pit shell.  Inferred Mineral Resources at 

6 

Relief Canyon include existing low‐grade stockpiles.  Mineral Resources are estimated using metal prices of 

US$1,500 per ounce of gold, $20.00 per ounce of silver, $3.00 per pound of copper, $1.05 per pound of lead 

and $1.05 per pound of zinc.  Mineral Resources are reported exclusive of Mineral Reserves and as such the 

Mineral  Resources  do  not  have  demonstrated  economic  viability.   Numbers  may  not  add  or  multiply 

accurately due to rounding.  

Inferred mineral resources are considered too speculative geologically to have the economic considerations 

applied to them that would enable them to be categorized as mineral reserves, and there is therefore no  

certainty that the conclusions of the initial exploration drilling results will be realized.   Additionally, where 

the Company discusses exploration/expansion potential, any potential quantity and grade is conceptual in 

nature and there has been insufficient exploration to define a mineral resource and  it is uncertain if  further  

exploration will result in the target being delineated as a mineral resource. 

All  Mineral  Resource  estimates  were  prepared  internally  by,  or  under  the  supervision  of,  Niel  de  Bruin, 

P.Geo.,  a  Qualified  Person  for  the  purpose  of  NI  43‐101.   All  Mineral  Reserve  estimates  were  prepared 

internally by, or under the supervision of, Shawn Wilson, P.Eng., a Qualified Person for the purpose of NI 

43‐101.  These estimates reflect the company's 60% interest in the Galena Complex.  

Varying  cut‐off  grades  have  been  used  depending  on  the  mine,  methods  of  extraction  and  type  of  ore 

contained in the reserves.   Mineral resource metal grades and material densities have been estimated using 

industry‐standard  methods  appropriate  for  each  mineral  project  with  support  of  various  commercially 

available  mining  software  packages.   The  Company’s  normal  data  verification  procedures  have  been 

employed in connection with the calculations.   Verification procedures include industry standard quality 

control practices.  Sampling, analytical and test data underlying the stated mineral resources and reserves 

have been verified by employees of the Company under the supervision of Qualified Persons, for purposes 

of  43‐101  and/or  independent  Qualified  Persons.   The  Company  is  not  aware  of  any  environmental, 

permitting, legal, title, taxation, socio‐economic, marketing, political, or other relevant issues that would 

materially affect the Mineral Reserve and Mineral Resource Estimates.  Additional details regarding Mineral 

Reserve  and  Mineral  Resource  estimation,  classification,  reporting  parameters,  key  assumptions  and 

associated risks for each of the Company’s mineral  properties are provided in the respective NI   43‐101 

Technical Reports which are available at www.sedar.com and the Company’s website at www.americas‐