Ur‐Energy Completes Preliminary Economic Assessment on Shirley Basin Project 

Littleton, Colorado (PR Newswire – January 27, 2015) Ur‐Energy Inc. (TSX:URE, NYSE MKT:URG) (“Ur‐ Energy” or the “Company”) announces the completion of a Preliminary Economic Assessment (“PEA”)

for  its  Shirley  Basin  Project  (“Project”)  in  Carbon  County,  Wyoming.  This  PEA  analyzes  the  planned development  of  a  commercial  satellite  uranium  in  situ  recovery  (ISR)  operation  at  the  Project, combined  with  existing  processing  operations  at  the  Company’s  Lost  Creek  Mine  in  Sweetwater County, Wyoming.

Western  Water  Consultants,  Inc.,  d/b/a  WWC  Engineering,  was  retained  by  the  Company  and  its subsidiary, Pathfinder Mines Corporation (PMC), to oversee and supervise preparation of this PEA, in accordance with Canadian National Instrument 43‐101 “Standards of Disclosure for Mineral Projects”

(NI  43‐101).  Mr.  Benjamin  J.  Schiffer,  P.G.  and  Mr.  Ray  Moores,  P.E.  of  WWC  Engineering,  are  the independent Qualified Persons for the PEA.

The  PEA  demonstrates  the  potential  viability  of  satellite  ISR  operations  at  the  Project.  The  Project currently has a Source and Byproduct Material License from the U.S. Nuclear Regulatory Commission and a Permit to Mine from the Wyoming Department of Environmental Quality – Land Quality Division.

The Company has begun the process of amending this license and permit for ISR operations.  The PEA is  based  on  an  assumption  of  construction  activities  starting  in  January  2017,  with  production commencing October 2017.  It is estimated that a total of 6.3 million pounds of U3O8 will be produced from the Project.

The economic analysis estimates the Project will generate net cash flow over its life, before income tax, of US$215.9 million.  It is estimated that the Project has a calculated before‐tax Internal Rate of Return (IRR)  of  117.0%  and  a  before‐tax  Net  Present  Value  (NPV)  of  US$146.0  million  applying  an  eight percent discount rate starting in year 2017.  The estimated operating cost for the project is US$14.54 per pound of uranium produced, while the total cost of uranium production including severance taxes and operational and capital spending is estimated at US$31.26 per pound.

Steve Hatten, Vice President Operations of the Company commented “We are very pleased to confirm the solid prospects for the Shirley Basin Project through the PEA.  Production from our latest project will not only enable Ur‐Energy to produce from a second low cost resource base, but will allow us to fully utilize the Lost Creek processing facility at its designed capacity.”

Cautionary Statement:

This Preliminary Economic Assessment is preliminary in nature and includes mineral resources. Mineral  resources that are not mineral reserves do not have demonstrated economic viability. The estimated  mineral  recovery  used  in  this  Preliminary  Economic  Assessment  is  based  on  site‐specific  laboratory  recovery data as well as URE personnel and industry experience at similar facilities. There can be no  assurance that recovery of mineral resources at this level will be achieved. There is no certainty that the  preliminary economic assessment will be realized.

The  full  report,  titled  “Preliminary  Economic  Assessment,  Shirley  Basin  Uranium  Project,  Carbon County,  Wyoming,  USA,”  January  27,  2015  is  available  on  the  Company’s  profile  on  SEDAR (www.sedar.com).  The  PEA  is  also  available  on  the  Company’s  website  at  www.ur‐ energy.com.  Benjamin J. Schiffer, P.G. and Ray Moores, P.E. of WWC Engineering, have reviewed and approved the technical disclosure contained in this news release.

About Ur‐Energy 

Ur‐Energy  is  a  junior  uranium  mining  company  operating  the  Lost  Creek  in‐situ  recovery  uranium  facility  in south‐central Wyoming.  The Lost Creek processing facility has a two million pounds per year nameplate design capacity.    Ur‐Energy  engages  in  the  identification,  acquisition,  exploration,  development,  and  operation  of uranium projects in the United States and Canada.  Shares of Ur‐Energy trade on the Toronto Stock Exchange under  the  symbol  “URE”  and  on  the  NYSE  MKT  under  the  symbol  “URG”.  All  currency  figures  in  this announcement are in US dollars unless otherwise stated. Ur‐Energy’s corporate office is located in Littleton, Colorado; its registered office is in Ottawa, Ontario.  Ur‐Energy’s website is www.ur‐energy.com.

FOR FURTHER INFORMATION, PLEASE CONTACT 

Rich Boberg, Senior Director IR/PR  Wayne Heili, President and CEO 303‐269‐7707     307‐265‐2373 866‐981‐4588  866‐981‐4588 rich.boberg@ur‐energy.com  wayne.heili@ur‐energy.com

Cautionary Note Regarding Forward‐Looking Information 

This release may contain “forward‐looking statements” within the meaning of applicable securities laws regarding events or conditions that may occur in the future (e.g., the technical and economic viability of the Shirley Basin project, and the other projections and mineral resource  estimates  contained  in  the  PEA;  timing  and  ability  to  advance  all  regulatory  authorizations  for  Shirley  Basin  project,  and subsequent  time  of  construction,  development  and  commissioning)  and  are  based  on  current  expectations  that,  while  considered reasonable  by  management  at  this  time,  inherently  involve  a  number  of  significant  business,  economic  and  competitive  risks, uncertainties and contingencies. Factors that could cause actual results to differ materially from any forward‐looking statements include, but are not limited to, capital and other costs varying significantly from estimates; failure to establish estimated resources and reserves; the grade and recovery of ore which is mined varying from estimates; production rates, methods and amounts varying from estimates; delays  in  obtaining  or  failures  to  obtain  required  governmental,  environmental  or  other  project  approvals;  inflation;  fluctuations  in commodity prices; delays in development and other factors described in the public filings made by the Company at www.sedar.com and www.sec.gov. Readers should not place undue reliance on forward‐looking statements. The forward‐looking statements contained herein are  based  on  the  beliefs,  expectations  and  opinions  of  management  as  of  the  date  hereof  and  Ur‐Energy  disclaims  any  intent  or obligation to update them or revise them to reflect any change in circumstances or in management’s beliefs, expectations or opinions that occur in the future.

Cautionary Note to U.S. Investors:  The terms “mineral resource,” “measured mineral resource,” and “indicated mineral resource,” as used in this news release are Canadian mining terms that are defined in accordance with National Instrument 43‐101 – Standards of Disclosure for Mineral Projects (“NI 43‐101”). These Canadian terms are not defined terms under United States Securities and Exchange

  • 2 -

Commission (“SEC”) Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC by U.S. registered companies.  The SEC permits U.S. companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Accordingly, note that information contained in this news release describing the  Company’s  “mineral  resources”  is  not  directly  comparable  to  information  made  public  by  U.S.  companies  subject  to  reporting requirements under U.S. securities laws.  U.S. investors are cautioned not to assume that any part or all of the mineral resources in  these categories will ever be converted into Mineral Reserves.  U.S. investors are urged to consider closely the disclosure in our Form 10‐K which may be secured from us, or online at http://www.sec.gov/edgar.shtml.

  • 3 -