Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

URE.TO ·

Ur-Energy Releases 2022 Q1 Results

Financials

News Release

10758 W. Centennial Rd. Suite 200

Littleton, CO 80127

Phone: 720.981.4588

www.ur-energy.com

Ur-Energy Releases 2022 Q1 Results

Littleton, Colorado (ACCESSWIRE – May 2, 2022) Ur-Energy Inc. (NYSE American:URG) (TSX:URE) (the “Company”

or “Ur-Energy”) has filed the Company’s Form 10-Q for the quarter ended March 31, 2022, with the U.S. Securities

and Exchange Commission at www.sec.gov/edgar.shtml and with Canadian securities authorities at

www.sedar.com.

Ur-Energy CEO, John Cash said, “The first quarter of 2022 has been an exciting time for our industry with the long-

term and spot uranium prices climbing dramatically in response to a growing recognition of nuclear energy’s role

in decarbonization, as evidenced by an increasing presence in the industry by financial players. Additionally,

threats to the supply of uranium due to geopolitical uncertainty are beginning to overshadow the market. In

response to rising uranium prices, and possible supply chain disruptions, we have continued and expanded our

drilling and construction program to better position us to quickly ramp up low -cost production from our fully

permitted Lost Creek Project when the market improves.

“We are also excited about our advanced R&D projects that have the potential to lower production costs, while

at the same time further reduc e our already small environmental footprint. Our near-term goals include signing

term contracts with domestic utilities at advantageous prices, further shortening our ramp-up time by continuing

to build out the next production area at Lost Creek and advancing R&D projects to further reduce our already low

production costs.”

Financial Results

As of March 31, 2022, we had cash resources consisting of cash and cash equivalents of $46.3 million, an increase

of $0.1 million from the December 31, 2021, balance of $46.2 million. In addition to our cash position, our finished,

ready-to-sell, conversion facility inventory value is immediately realizable, if necessary. We do not anticipate

selling our existing finished-product inventory in the next 12 months unless it is advantageous to do so.

Lost Creek Operations

Lost Creek continues to operate at reduced production levels, which have allowed us to sustain operating cost

reductions at Lost Creek, while continuing to conduct preventative maintenance and optimize processes in

preparation for ramp up to full production rates.

In 2021 Q4, we initiated an advance development program at Lost Creek designed to significantly improve our

ability to quickly return to production when ramp -up occurs. Specifically, we commenced a drilling and

construction program to complete the development of the fourth header house in MU2 (HH 2 -4). The header

house, and its associated drilling and wellfield development, is expected to be complete in 2022 Q3, at which time

HH 2-4 will be ready for production. Additionally, we have ordered all necessary equipment to construct the fifth

header house (HH 2 -5) and the long- lead items for the sixth header house in MU2. In conjunction with HH 2 -4

work, the 2022 delineation drill program will assist with subsequent wellfield design within MU2. Delineation

drilling for HH 2-5 is already complete, and when well work on HH 2-4 is complete, delineation drilling will resume

for HHs 2 -6, 2 -7 and 2 -8. Together with our optimization of plant processes, these wellfield programs will

significantly advance our readiness and shorten the time frame to production when ramp-up occurs.

- 2 -

Initial Assessment Technical Summary Reports

In Q1, we filed Initial Assessment Technical Summary Reports for each of Lost Creek and Shirley Basin. The Initial

Assessment Technical Report Summary on our Lost Creek Property, Sweetwater County, Wyoming, USA (the “Lost

Creek Report,” March 7, 2022), was prepared by Western Water Consultants, Inc., d/b/a WWC Engineering

(“WWC”). The Lost Creek Report provides the most recent resource update and provides analysis of the property’s

economics assuming a near immediate restart of wellfield development activities and the subsequent ramp-up to

a one million pound per year productio n rate. The mineral resource estimate for the Lost Creek Property is 11.9

million pounds eU 3O8 in the Measured and Indicated categories, and 6.6 million pounds eU 3O8 in the Inferred

category. Lost Creek has produced 2.7 million pounds U 3O8 as of December 3 1, 2021. The mineral resource

estimate was reduced to account for production to date.

Additionally, we filed an Initial Assessment Technical Report Summary on the Shirley Basin ISR Uranium Project,

Carbon County, Wyoming, USA (the “Shirley Basin Report,” March 7, 2022), which also was prepared by WWC.

Based upon data from the historical and confirmation drilling at the site, the Shirley Basin Report confirms the

project’s mineral resource estimate of 8.8 million pounds eU 3O8 in the Measured and Indicated categories, of

which approximately 6.4 million pounds are expected to be recovered. Due to the very high drilling density at the

project, all resources within the three proposed mine units are classified as Measured or Indicated. There are no

resources in the Inferred category. Additionally, the Shirley Basin Report reaffirms the economic analysis on the

Shirley Basin Project from a prior NI 43-101 Preliminary Economic Assessment.

Advancing R&D and Construction of the Casper Operations Headquarters

We have engaged in several research and development (“R&D”) projects with the overall objective to introduce

new methods of cost-effective technology to our Lost Creek Project, and to Shirley Basin when it is constructed.

The technologic advances are at varying stages of development, although if analyses continue to be successful, it

is anticipated that one or more may be implemented in 2022. The development projects include a new material

for injection wells and related well installation process, for which a provisional patent has been filed with the U.S.

Patent Office. Work continues, as well, on engineering of an advanced water treatment system. Beyond water

recycling gains already achieved with our industry-leading Class V circuit, the new system may allow an additional

90% reduction of disposed water. This project is entering advanced -stage analyses expected to be completed by

2022 Q4. (See also News Release, April 21, 2022.)

In late 2021, we purchased a new operations headquarters in Casper, Wyoming to serve our current and future

Wyoming operations and mineral exploration and development projects. In Q1, we selected a contractor who is

completing design work for a multipurpose building to allow for centralized construction activities as well as

housing our shared services chemistry laboratory. Building materials are on order with the manufacturer, and full

construction is expected to commence Q2 and be completed in 2022. Building, wiring and automating header

houses in Casper, as well as other construction activities, will provide numerous safety, environmental and

financial advantages to our operations.

2022 Guidance

The surge in interest by investors, policy - and lawmakers, and climate -change advocates in all things nuclear

continues in 2022. Global recognition of nuclear energy’s role in achieving net -zero carbon emissions continues

to be more widely accepted. Japan, several member nations of the European Union, and the United Kingdom have

all recently made announcements of action plans placing nuclear energy as an integral part of the climate change

solution. The U.S. has rejoined the Paris Climate Agreement, and the Biden Administration continues to voice

support for the nuclear industry. The DOE uranium reserve also appears to be moving forward: DOE Secretary

Granholm said in public testimony April 28, 2022, that DOE anticipates initial requests for proposal for the

purchase of domestically produced uranium will be issued in June 2022.

- 3 -

This support for nuclear energy has prompted financial funds and uranium ETFs to purchase uranium inventories

thereby supporting the uranium spot price. In 2021, the Sprott Physical Uranium Trust began its purchases of

uranium and has established the means in the equity markets to raise more than $3 billion for such purchases. A

more recent participant in the long-term investment in uranium is the physical uranium fund formed by

Kazakhstan. That physical fund announced plans to raise as much as $500 million for purchasing uranium. The

rally in uranium spot prices which began in 2021 continues in 2022, with prices through March and April

maintaining averages in the upper-$50s. Moreover, nuclear utilities and other purchasers are back in the market,

resulting in some strengthening of term pricing.

Our cash position as of April 28, 2022, is $45.8 million. In addition to our strong cash position, we have nearly

284,000 pounds of finished, U.S. produced U 3O8 inventory at the conversion facility, worth approximately $15. 1

million at recent spot prices. Our financial position p rovides us with adequate funds to maintain and enhance

operational readiness at Lost Creek, as well as allowing us to preserve our existing inventory to sell into higher

prices. To further heighten our readiness to return to production operations at Lost C reek, we are advancing

preparations in Lost Creek MU2 through a drilling and development program, which has recently been

supplemented by purchases of mid- and long-lead time items for MU2.

We continue to diligently work to optimize processes and refine production plans, supported by our experienced

Lost Creek operational staff, who stand ready to expand Lost Creek production to an annualized run rate of up to

1.2 million pounds upon a “go” decision for ramp up. A production ramp up will include further development work

in both of the first two mine units, followed by the ten additional mining areas as defined in the Lost Creek Report.

The Lost Creek facility now has the constructed and licensed capacity to process up to 2.2 million pounds of U3O8

per year and sufficient mineral resources to feed the processing plant for many years to come.

The ongoing MU2 advance development and construction work is designed to shorten the time to production,

with HH 2-4 anticipated to be ready for production in Q3 should a decision to proceed be made. When the advance

work is complete, Lost Creek operations can increase to full production rates in as little as six months following a

“go” decision, simply by continuing the development work within the fully permitted MU2. W e are prepared to

ramp up and to deliver future Lost Creek production into new sales contracts and the national uranium reserve.

We will continue to closely monitor the uranium market, the implementation of the uranium reserve program,

and other developments in the markets or from Congress, which may positively impact the uranium production

industry. Until market conditions signal a decision for the return to production operations, we will focus on

maintaining safe and compliant operations while continuing to enhance and leverage our operational readiness.

***

NOTE: Qualified Persons at WWC have reviewed and approved the technical disclosure contained in this news

release. The Initial Assessment Technical Report Summaries for each of the Lost Creek Property and Shirley Basin

may be accessed on the Company’s website at www.ur-energy.com.

Cautionary statement: The Technical Report Summaries reported are preliminary in nature and, in the case of

the Lost Creek Report, includes inferred mineral resources that are considered too speculative geologically to

have the economic considerations applied to them that would enable them to be categorized as mineral

reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The

estimated mineral recovery used in these reports is based on recovery data from wellfield operations to date at

Lost Creek in the case of the Lost Creek Report, and Company personnel and industry experience at similar

- 4 -

facilities in the case of the Shirley Basin Report . There can be no assurance that recovery at this level will be

achieved.

About Ur-Energy

Ur-Energy is a uranium mining company operating the Lost Creek in-situ recovery uranium facility in south-central

Wyoming. We have produced, packaged, and shipped approximately 2.6 million pounds U 3O8 from Lost Creek

since the commencement of operations. Ur -Energy now has all major permits and authorizations to begin

construction at Shirley Basin, the Company’s second in situ recovery uranium facility in Wyoming and is in the

process of obtaining remaining amendments to Lost Creek authorizations for expansion of Lost Creek. Ur-Energy

is engaged in uranium recovery and processing activities, including the acquisition, exploration, development, and

operation of uranium mineral properties in the United States. The primary trading market for Ur-Energy’s common

shares is on the NYSE American under the symbol “URG.” Ur-Energy’s common shares also trade on the Toronto

Stock Exchange under the symbol “URE.” Ur -Energy’s corporate office is located in Littleton, Colorado and its

registered office is located in Ottawa, Ontario.

FOR FURTHER INFORMATION, PLEASE CONTACT

John W. Cash, CEO

866-981-4588, ext. 303

[email protected]

Cautionary Note Regarding Forward-Looking Information

This release may contain “forward-looking statements” within the meaning of applicable securities laws regarding

events or conditions that may occur in the future (e.g., our ability to control production operations at lower levels

at Lost Creek in a safe and compliant manner; ability and timing to receive all remaining permits and authorizations

related to LC East; the timing to determine future development and construction priorities, including the

progression and completion of our advanced development program at Lost Creek , including the impact the

program will have on timing for ramp-up; the ability to readily and cost-effectively ramp-up production operations

when market and other conditions warrant; the life of mine, costs and production results for Lost Creek and Shirley

Basin, including as s et forth in the Initial Assessment and preliminary economic assessment for each of the

projects; the viability of any of the ongoing R&D efforts described, including the timing and cost to implement and

operate one or more of them; the timing, origin and type of additional positive developments in the market that

are anticipated; whether the recent events in the uranium markets, including the Sprott Physical Uranium Trust’s

role in the market, are fundamental changes and whether the impacts seen recently will continue; whether global

support for nuclear energy will continue and grow as currently appears will be the case; the timing and program

details for establishment of the new national uranium reserve and what our role will be in the program ; and

whether our financing activities and cost -savings measures which we have implemented will be sufficient to

support our operations and for what period of time, including whether and when we will choose to sell our current

inventory) and are based on current expectations that, while considered reasonable by management at this time,

inherently involve a number of significant business, economic and competitive risks, uncertainties and

contingencies. Generally, forward-looking statements can be identified by the use of forward-looking terminology

such as "plans," "expects," "does not expect," "is expected," "is likely," "estimates," "intends," "anticipates," "does

not anticipate," or "believes," or variations of the foregoing, or statements that certain actions, events or results

"may," "could," "might" or "will be taken," "occur," "be achieved" or "have the potential to." All statements, other

than statements of historical fact, are considered to be forward-looking statements. Forward-looking statements

involve known and unknown risks, uncertainties and other factors which may cause the actual results,

performance or achievements of the Company to be materially different from any future results, performance or

achievements express or implied by the forward-looking statements. Factors that could cause actual results to

differ materially from any forward- looking statements include, but are not limi ted to, capital and other costs

- 5 -

varying significantly from estimates; failure to establish estimated resources and reserves; the grade and recovery

of ore which is mined varying from estimates; production rates, methods and amounts varying from estimates;

delays in obtaining or failures to obtain required governmental, environmental or other project approvals;

inflation; changes in exchange rates; fluctuations in commodity prices; delays in development and other factors

described in the public filings made by the Company at www.sedar.com and www.sec.gov. Readers should not

place undue reliance on forward-looking statements. The forward-looking statements contained herein are based

on the beliefs, expectations and opinions of management as of the date hereof and Ur-Energy disclaims any intent

or obligation to update them or revise them to reflect any change in circumstances or in management’s beliefs,

expectations or opinions that occur in the future.