Ur‐Energy Provides 2019 Q1 Operational Results

Production Results

10758 W. Centennial Rd. Suite 200

Littleton, CO 80127

Phone: 720.981.4588

Fax: 720.981.5643

www.ur-energy.com

News Release

Ur‐Energy Provides 2019 Q1 Operational Results  

Littleton, Colorado (PR Newswire – April 11, 2019) Ur‐Energy Inc. (NYSE American:URG)(TSX:URE) (the 

“Company” or “Ur‐Energy”) is pleased to provide the following operational results for first quarter 2019. 

Highlights 

Lost Creek Operations 

  Units  2019 Q1    2018 Q4 

U3O8 Captured  (‘000 lbs)  22.6    48.4 

U3O8 Dried & Drummed  (‘000 lbs)  21.0    53.7 

U3O8 Sold (from produced lbs)  (‘000 lbs)  48.8    0 

U3O8 Sold (from purchased lbs)  (‘000 lbs)  48.8    0 

Average Flow Rate  (gpm)  1,469    2,019 

U3O8 Head Grade  (mg/l)  15    23 

Lost Creek Uranium Production and Sales 

For the quarter, 22,551 pounds of U3O8 were captured within the Lost Creek plant, and 21,015 pounds of 

U3O8 were packaged in drums at the Lost Creek processing plant. No shipments of product were made to 

the  conversion  facility  during  the  quarter.  At  March  31,  2019,  inventory  at  the  conversion  facility  was 

approximately 375,803 pounds U3O8. 

In Q1 2019, sales totaled $4.8 million from 97,500 pounds sold. Our price per pound sold averaged $49.35. 

Half of these pounds were from Lost Creek production, produced at a cost of approximately $37.74 per 

pound, and half were pounds purchased for delivery, with an average purchase price of $27.51 per pound. 

Gross  profits  from  contractual  sales  were  $1.6 million,  which  represents  a  gross  profit  margin  of 

approximately 34%. On a cash basis (excluding non‐cash costs and extraction taxes), gross profits from 

contractual  sales  generated  $2.3  million  in  cash,  which  represents  a  cash‐basis  gross  profit  margin  of 

approximately 48%. 

Lost Creek Operations 

Production rates at Lost Creek during the quarter were in line with guidance for the year despite more 

difficult  than  normal  winter  weather  conditions  in  Wyoming.  Heavy  snows  and  high  winds  impeded 

routine flow and production maintenance and hindered normal production activities. Notwithstanding the 

2 

weather and site conditions, our staff remained safe, with our continuing safety record at Lost Creek intact, 

which now stands at over 600 days without a lost‐time accident. 

Section 232 Trade Action  

The Department of Commerce (“DOC”) continues its investigation into the impact of uranium imports on 

national  security,  and  is  nearing  the  statutory  deadline  to  submit  its  report  to  the  White  House.  It  is 

anticipated  that  DOC  will  submit  its  report  to  the  President,  containing  the  Secretary’s  findings  and 

recommendations of a proposed remedy, if any, very shortly. Following receipt of the report, the President 

has up to 90 days to act on the Secretary’s report. 

Guidance for 2019 

In calendar year 2019, we expect to produce between 75,000 and 100,000 pounds at Lost Creek and deliver 

a total of 500,000 pounds into our term contracts at an average price of approximately $49 per pound. We 

have purchase contracts in place for 500,000 pounds at an average cost of $26 per pound.  In total, 451,250 

pounds  of  purchased  product  and  48,750  pounds  of  produced  product  will  be  delivered  into  the  term 

contracts. Gross profits are expected to be approximately $11.0 million, which represents a gross profit 

margin of approximately 45%. On a cash basis (excluding non‐cash costs and extraction taxes), gross profits 

from contractual sales are expected to generate $11.7 million in cash, which represents a cash‐basis gross 

profit margin of approximately 47%.   As discussed above, 97,500 pounds, including the 48,750 pounds 

from production, were sold in Q1 2019. We do not anticipate selling any additional produced pounds in 

2019.   By quarter, our remaining 2019 contractual sales are as follows: 100,000 pounds in Q2; 122,500 

pounds in Q3; and 180,000 pounds in Q4. 

Should uranium pricing continue to improve, or following a successful outcome of the ongoing Section 232 

uranium investigation, we stand ready to ramp up production to full capacity at Lost Creek and initiate 

development activities at Shirley Basin. We remain operationally ready to increase production through the 

further development of our fully‐permitted mine unit two (“MU2”) at Lost Creek. Lost Creek operations 

could increase production rates in as little as six months following a “go” decision simply by developing 

additional header houses within MU2. Development expenses during this time are estimated to be less 

than $14 million and are almost entirely related to MU2 drilling and header house construction costs. Lost 

Creek does not require any significant capital expenditures in order to increase production, but we will 

continue to optimize site operations through engineering design enhancements and modifications. The 

Lost Creek plant has been well maintained and is ready to receive additional flows for increased production 

when warranted. 

We will provide further guidance in our Form 10‐Q, which is currently anticipated to be filed on Friday, 

May 3, 2019, and throughout the year as matters progress. 

About Ur‐Energy 

Ur‐Energy is a uranium mining company operating the Lost Creek in‐situ recovery uranium facility in south‐

central Wyoming. We have produced, packaged and shipped approximately 2.5 million pounds from Lost Creek 

since the commencement of operations. Applications are under review by various agencies to incorporate our 

LC East project area into the Lost Creek permits, and to construct and operate at our Shirley Basin Project. Ur‐

Energy is engaged in uranium mining, recovery and processing activities, including the acquisition, exploration, 

3 

development and operation of uranium mineral properties in the United States.  Shares of Ur‐Energy trade on 

NYSE  American  under  the  symbol  “URG”  and  on the  Toronto  Stock  Exchange  under  the  symbol  “URE.”  Ur‐

Energy’s corporate office is in Littleton, Colorado; its registered office is in Ottawa, Ontario. Ur‐Energy’s website 

is www.ur‐energy.com. 

FOR FURTHER INFORMATION, PLEASE CONTACT 

Jeffrey Klenda, Chair and CEO

+1 720‐981‐4588

Jeff.Klenda@ur‐energy.com

Cautionary Note Regarding Forward‐Looking Information 

This  release  may  contain  “forward‐looking  statements”  within  the  meaning  of  applicable  securities  laws 

regarding events or conditions that may occur in the future (e.g., continuing results of Lost Creek operations 

and the timing and ability to ramp up operations; timing and outcome for resolution of the Section 232 trade 

action or other changes to the uranium market; timing and outcome for all permitting and licensure of the 

Shirley Basin project and for the subsequent buildout of the project; projected sales and costs of sales; and 

whether adjustments of production rates at Lost Creek will be necessary or appropriate during 2019) and are 

based  on  current  expectations  that,  while  considered  reasonable  by  management  at  this  time,  inherently 

involve  a  number  of  significant  business,  economic  and  competitive  risks,  uncertainties  and  contingencies. 

Factors that could cause actual results to differ materially from any forward‐looking statements include, but 

are not limited to, fluctuations in commodity prices; capital and other costs varying significantly from estimates; 

failure to establish estimated resources and reserves; the grade and recovery of uranium which is mined varying 

from estimates; production rates, methods and amounts varying from estimates; delays in obtaining or failures 

to obtain required governmental, environmental or other project approvals; inflation; delays in development 

and other factors described in the public filings made by the Company at www.sedar.com and www.sec.gov. 

Readers  should  not  place  undue  reliance  on  forward‐looking  statements.  The  forward‐looking  statements 

contained herein are based on the beliefs, expectations and opinions of management as of the date hereof and 

Ur‐Energy  disclaims  any  intent  or  obligation  to  update  them  or  revise  them  to  reflect  any  change  in 

circumstances or in management’s beliefs, expectations or opinions that occur in the future.