Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TXG.TO ·

Torex Sub-Sill Infill Drilling Demonstrates the Continuity of High Grade GOLD Mineralization

Drill Results

Corporate Office: 130 King St. West, Suite 1502, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000

www.torexgold.com

TOREX SUB-SILL INFILL DRILLING DEMONSTRATES THE

CONTINUITY OF HIGH GRADE GOLD MINERALIZATION

TORONTO, Ontario, June 19, 2017 – Torex Gold Resources Inc. (t he “Company” or “Torex”) (TSX:TXG) is pleased to announce high

grade intercepts for the first 25 holes of its infill drilling program at the Sub-Sill deposit, associated with its El Limon-Gu ajes Mine (ELG)

in Southwest Mexico. Highlighted intercepts from this program include 39.1 g/t Au over 9.7m, including 114.1 g/t Au over 2.9m, in

borehole SST-49; 107.3 g/t Au over 3.1m in borehole SST-50; 32.1 g/t Au over 13.0m, including 68.9 g/t Au over 4.0m in borehole

SST-54; and 27.3 g/t Au over 14.8m, including 62.1 g/t Au over 4.9m in borehole SST-47.

Fred Stanford, President & CEO of Torex stated: “The purpose of this infill diamond drill program is to upgrade a million tonne s of

Inferred Sub-Sill resource to the Measured and Indicated categories, to facilitate mine planning and the determination of a mai den

mineral reserve. Of the 50 planned infill diamond drill holes, 41 have been completed to date, and assays have been received for 25

of those holes. To date, the ‘hit ratio’ has been 96%, with 24 holes intercepting high grade gold mineralization. This except ional

demonstration of the continuity of the gold mineralization has he ld true across the current resource area, including at the per iphery.

This bodes well for the mine planning efforts and indicates the potential for resource expansion with step-out drilling. The t iming is

excellent as the access ramp is now through the sill and progressed 40 meters into the less prospective endoskarn, and is less than 10

meters from intersecting the highly prospective exoskarn.” He added, - “The step-out diamond drill program is getting underway as the

infill program is completed. The step-out program comprises approximately 7,500 meters in 31 holes that test the area adjacent to the

current resource and then out to the periphery of the prospective area for Sub-Sill expansion. This drill program is expected to be

completed through the second half of the year and we look forward to sharing those results.”

Highlights from the infill drilling at the El Limon Sub-Sill

BH ID Interval (m) Interval

Length (m) Au (g/t) Ag (g/t) Cu (%) Lithology From To

SST-47 91.91 94.25 2.3 11.8 16.9 0.5 Skarn

97.89 102.05 4.2 8.2 1.5 0.0 Skarn

105.26 120.09 14.8 27.3 19.0 0.9 Skarn

Including 111.87 116.78 4.9 62.1 50.4 2.2 Skarn

133.52 135.54 2.0 21.2 10.2 0.3 Skarn

SST-49 79.63 89.32 9.7 39.1 8.2 0.1 Skarn

Including 82.93 85.78 2.9 114.4 14.6 0.1 Skarn

153.00 159.17 6.2 16.1 49.3 2.1 Skarn

SST-50 142.33 154.87 12.5 3.7 1.9 0.0 Skarn

171.88 174.97 3.1 107.3 53.5 2.1 Skarn

SST-54 54.50 62.92 8.4 13.3 48.7 3.6 Skarn

72.00 83.85 11.9 9.2 76.8 3.1 Skarn

100.40 113.40 13.0 32.1 25.7 0.4 Skarn

Including 106.40 110.40 4.0 68.9 19.4 0.5 Skarn

SST-59 105.92 117.27 11.4 23.2 7.0 0.2 Skarn

Including 105.92 108.76 2.8 43.9 7.0 0.1 Skarn

139.17 140.77 1.6 32.4 36.0 2.5 Skarn

Note:

True thickness of the mineralized zone is unknown and is reported as drill hole length

Please refer to Table 1 for a complete list and expanded description of the borehole intercepts reported in this press release. Refer to

Figure 1 for general borehole location.

Torex Gold Resources Inc. Page 2

Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000

www.torexgold.com

The Company’s Sub-Sill in-fill diamond drilling program comprises a total of 50 holes (7455m). The purpose of the program, at a

17.5m x 17.5m drill pattern, is to upgrade 1,000,000 tonnes, over an area of 250m x 150m, to the Indicated category, which will support

the development of a mine plan. The positive results to date co nfirm the geological continuity of the skarn zones as well as t he

continuity and the strength of the mineralization system. The drill ing program also demonstrates the existence and continuity o f other

mantos underneath the main ore zone explored that were not included in the resource estimate due to the insufficient drilling a t the

time.

The Sub-Sill area is located between the El Limon and El Limon Sur ore deposits and under the El Limon Sill. The El Limon Sill area

occurs in the Mesozoic carbonate-rich Morelos Platform, which ha s been intruded by Paleocene granodiorite stocks, sills and dik es.

Skarn-hosted gold mineralization is developed along the contacts of the intrus ive rocks and the enclosing carbonate-rich sedime ntary

rocks. Structurally, the El Limon Sill target area as well as El Limon and El Limon Sur ore deposits are hosted in a graben bou nded by

La Flaca fault to the west and the Antena fault to the east, and both are considered to be potential feeders for the mineraliza tion. At the

El Limon Sill area, several skarn zones have been identified along the contacts of the carbonate rich sediments and marbles of the

Cuautla and Morelos formations and sills fingering out from the main granodiorite stock. High grade gold mineralization have be en

intercepted in all the different skarn horizons. Within the skarn zones individual ore shoots vary in strike length from approx imately 50

meters up to 200 meters, with apparent widths varying from 2 meters to 27 meters.

Mineralization at the El Limon Sill area is primarily gold, associ ated with variable contents of silver and copper. Gold occurs in low and

high sulfidized pyrrhotite rich skarns, while silver and copper mineralization is primarily determined by the degree of sulfida tion of the

host skarn. Mineralization is strongly associated with a late stage retrograde alteration characterized by amphiboles, chlorite , calcite ±

quartz ± epidote, affecting pyroxene-garnet marble related exoskarn and granodiorite porphyry related endoskarn. Locally

mineralization occurs in narrow lenses of massive sulfides.

QA/QC and Qualified Person

At the Morelos Gold Project, all of the El Limon Sill target analytical work is performed by SGS de Mexico S.A. de C.V. ("SGS") in

Durango, Mexico and at SGS Mineral Services in Vancouver, British Columbia, Canada and ALS Chemex de Mexico S.A. de C.V.

Sample preparation is done at SGS sample preparation laboratory in Durango, Mexico. The gold analyses (fire assay with an atomi c

absorption or gravimetric finish) are completed at SGS analytical laboratory in Durango, Mexico and multi-element geochemical

analyses are Copper Sequential Leaching are completed at their analytical facilities in Vancouver, British Columbia, Canada. Ch eck

assays samples are analyzed at ALS Chemex Vancouver, BC, Canada. SGS and ALS Chemex are independent of the Company. 

The Company has a Quality Assurance/Quality Control (“QA/QC”) program in place that includes 5% of each of the certified refere nce

materials, blanks and field duplicates. 10% of pulp samples are analyzed at a second laboratory as part of the QA/QC program to

ensure the batch to batch relative bias remains constant and t hat absolute accuracy at anomalous to near cut-off grades is meas ured

and acceptable. The QA/QC program as designed has been approved by Bureau Veritas and is currently overseen by Carlo Nasi,

Chief Mine Geologist for the Morelos Gold Project.

The scientific and technical data contained in this news release pertaining to the Morelos Project has been reviewed and approv ed by

Mr. Mark P. Hertel as a Qualified Person under NI 43-101. Mr. Hertel is a Registered Member of the Society for Mining, Metallurgy &

Exploration, has experience relevant to the style of mineralization under consideration and is an independent consultant. Mr. Hertel has

verified the data disclosed, including sampling, analytical, an d test data underlying the drill results and he consents to the inclusion in

this release of said data in the form and context in which it appears.

Additional information on the El Limon deposit, the mineral resource estimate for the Sub-Sill deposit and analytical labs is a vailable in

the Company’s most recent annual information form filed on SEDAR at www.sedar.com and the Company’s website at

www.torexgold.com.

Torex is an emerging intermediate gold producer based in Canada, engaged in the exploration, development and operation of its 1 00%

owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometers

southwest of Mexico City. Within this property, Torex has the El Limón Guajes Mine, which announced commercial production in Ma rch

of 2016 and the Media Luna Project, which is in an advanced stage of exploration, and for which the Company issued a preliminar y

economic assessment (PEA) in 2015. The property remains 75% unexplored.

Torex Gold Resources Inc. Page 3

Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000

www.torexgold.com

For further information, please contact:

TOREX GOLD RESOURCES INC.

Fred Stanford Gabriela Sanchez

President and CEO Vice President Investor Relations

Tel. (647) 260-1502 Tel. (647) 260-1503

Email: [email protected] E m a i l : [email protected]

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

This press release contains “forward-looking statements” and “for ward-looking information” within the meaning of applicable Can adian securities

legislation. Notwithstanding the Company’s efforts, there c an be no guarantee that the Company will not face unforeseen delays or disruptions.

Forward-looking information includes, but is not limited to, info rmation with respect to the drill program for the El Limon Sub -Sill area and the results

of the drill program contained herein, including the continuity of the high grade gold mineralization, the expectation of upgrading the El Limon Sub-Sill

mineral resource, plans for mine planning, determining a miner al reserve and an additional step out drilling program, the poten tial for expanding the

Sub-Sill resource area, future exploration and development plans of the Company, completion of the ramp access to the targets as described herein,

and the potential for mining the El Limon Sub-Sill area. Generally , forward-looking information can be identified by the use o f forward-looking

terminology such as “plans”, “indicates”, “expects”, “estimates”, “intends”, “anticipates” or “believes” or variations of such words and phrases or state

that certain actions, events or results “may”, “could”, “would”, “might”, or “will be taken”, “occur”, or “be achieved”. Forward-looking information is

subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements

of the Company to be materially different from those expressed or implied by such forward-looking information, including, witho ut limitation, the risk

associated with the variability of skarn deposits, the risk that actual results of current exploration and development activiti es will not achieve

expectations and other risk factors identified in the Company’s annual information form and management’s discussion and analysis. Forward-looking

information is based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experie nce and its

perception of trends, current conditions and expected developments, as well as other factors that management believes to be rel evant and

reasonable in the circumstances at the date that such statement s are made, but which may prove to be incorrect. Although the Co mpany believes

that the assumptions and expectations reflected in such forw ard-looking information are reasonable, undue reliance should not b e placed on

forward-looking information because the Company can give no assur ance that such expectations will prove to be correct. There c an be no

assurance that such information will prove to be accurate, as actual results and future events could differ materially from tho se anticipated in such

information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.  

From To

(m) (m) (m) g/t g/t %

SST-37 Sub-Sill 422504.93 1989887.58 1160.68 90 -81 195.50 118.78 121.61 2.8 29.6 38.7 0.7 Skarn

70.62 72.70 2.1 42.5 9.5 0.1 Skarn

83.06 88.50 5.4 7.9 1.0 0.0 Skarn

96.50 101.28 4.8 8.9 2.0 0.0 Skarn

101.60 107.95 6.4 3.7 5.8 0.2 Skarn

152.50 154.40 1.9 7.5 26.0 1.0 Skarn

SST-41 Sub-Sill 422365.73 1989759.91 1136.06 90 -83 179.80 120.16 130.96 10.8 10.3 13.0 0.5 Skarn

93.07 97.65 4.6 3.9 21.4 0.4 Skarn

128.24 136.28 8.0 3.4 5.6 1.1 Skarn

172.24 176.80 4.6 7.2 26.9 0.6 Skarn

SST-44A Sub-Sill 422424.30 1989811.61 1146.56 0 -90 120.00 89.35 104.26 14.9 14.5 5.2 0.1 Skarn

94.00 104.50 10.5 8.4 2.0 0.0 Skarn

134.10 146.56 12.5 6.1 11.9 0.3 Skarn

91.91 94.25 2.3 11.8 16.9 0.5 Skarn

97.89 102.05 4.2 8.2 1.5 0.0 Skarn

105.26 120.09 14.8 27.3 19.0 0.9 Skarn

Including 111.87 116.78 4.9 62.1 50.4 2.2 Skarn

133.52 135.54 2.0 21.2 10.2 0.3 Skarn

SST-48 Sub-Sill 422398.61 1989846.46 1175.41 270 -80 189.30 116.52 119.30 2.8 39.8 4.8 0.0 Skarn

79.63 89.32 9.7 39.1 8.2 0.1 Skarn

Including 82.93 85.78 2.9 114.4 14.6 0.1 Skarn

153.00 159.17 6.2 16.1 49.3 2.1 Skarn

142.33 154.87 12.5 3.7 1.9 0.0 Skarn

171.88 174.97 3.1 107.3 53.5 2.1 Skarn

58.01 72.94 14.9 5.4 2.4 0.0 Skarn

102.90 112.80 9.9 9.1 20.1 0.6 Skarn

73.88 76.22 2.3 7.9 10.2 0.2 Skarn

97.44 114.40 17.0 10.1 6.8 0.2 Skarn

63.17 65.60 2.4 45.6 5.4 0.0 Skarn

77.06 81.87 4.8 23.4 4.5 0.1 Skarn

95.00 108.91 13.9 8.7 7.0 0.3 Skarn

54.50 62.92 8.4 13.3 48.7 3.6 Skarn

72.00 83.85 11.9 9.2 76.8 3.1 Skarn

100.40 113.40 13.0 32.1 25.7 0.4 Skarn

Including 106.40 110.40 4.0 68.9 19.4 0.5 Skarn

75.57 87.09 11.5 12.7 22.5 0.1 Skarn

Including 75.57 77.73 2.2 45.8 77.5 0.3 Skarn

64.87 69.31 4.4 20.5 54.4 3.4 Skarn

77.34 94.67 17.3 5.1 29.0 0.9 Skarn

109.66 112.88 3.2 8.1 12.7 0.3 Skarn

119.70 125.97 6.3 4.1 12.2 0.4 Skarn

147.56 154.92 7.4 7.8 10.6 0.4 Skarn

Cu Lithology

SST-38 Sub-Sill 422432.5 1989826.94 1148.29 0 -90 132.00

Dip (°)

Total

Length

(m)

Intersection Core

Length Au AgDrill-Hole Target

Area UTM-E (m) UTM-N (m) Elevation

(m)

Azimuth

(°)

-90 190.50

SST-43 Sub-Sill 422399.14 1989845.44 1175.23 90 -79 182.50

SST-39 Sub-Sill 422480.3 1989865.16 1157.00 0

-84 208.00

SST-47 Sub-Sill 422382.35 1989777.07 1138.9 0 -90 140.50

SST-45A Sub-Sill 422398.72 1989845.89 1175.25 100

-90 200.65

SST-50 Sub-Sill 422337.36 1989795.04 1183.54 90 -83 240.00

SST-49 Sub-Sill 422466.05 1989865.01 1155.42 0

-82 134.60

SST-52 Sub-Sill 422411.05 1989812.04 1145.50 0 -90 176.40

SST-51 Sub-Sill 422431.69 1989830.03 1148.25 270

-87 257.60

SST-54 Sub-Sill 422523.82 1989864.96 1159.82 0 -90 161.40

SST-53 Sub-Sill 422397.77 1989776.89 1141.22 270

-90 122.80

SST-56 Sub-Sill 422525.96 1989847.00 1153.24 0 -90 119.40

SST-55 Sub-Sill 422508.03 1989847.34 1149.43 0

-90 272.70SST-57 Sub-Sill 422478.30 1989881.86 1159.29 0

167.32 179.38 12.1 14.0 13.5 0.5 Skarn

Including 176.10 179.38 3.3 35.3 19.7 0.8 Skarn

76.68 84.00 7.3 5.4 1.1 0.0 Skarn

134.13 146.01 11.9 22.8 12.9 0.4 Skarn

Including 141.00 144.42 3.4 48.2 14.9 0.3 Skarn

105.92 117.27 11.4 23.2 7.0 0.2 Skarn

Including 105.92 108.76 2.8 43.9 7.0 0.1 Skarn

139.17 140.77 1.6 32.4 36.0 2.5 Skarn

75.00 88.50 13.5 5.0 0.7 0.0 Skarn

95.00 115.17 20.2 9.0 11.7 0.4 Skarn

Including 104.69 112.41 7.7 17.5 24.4 1.0 Skarn

SST-62 Sub-Sill 422471.05 1989846.97 1154.50 0 -90 112.80 52.17 65.00 12.8 8.9 2.8 0.1 Skarn

83.79 87.94 4.15 17.2 66.3 2.3 Skarn

94.40 104.41 10.0 18.3 19.8 0.6 Skarn

Including 96.26 99.13 2.9 53.4 34.7 1.1 Skarn

131.27 135.34 4.1 21.1 46.2 2.3 Skarn

60.23 69.66 9.4 5.4 0.7 0.0 Skarn

79.89 106.05 26.2 5.9 3.2 0.1 Skarn

Including 94.50 98.60 4.1 13.4 10.1 0.4 Skarn

SST-65 Sub-Sill 422426.03 1989882.26 1183.97 90 -88 167.00 142.24 143.33 1.1 1.1 11.0 0.4 Skarn

Notes:

True thickness of the mineralized zone is unknown and is reported as drill hole length

The gold values used to calculate the intercept compoasite are uncapped

SST-58 Sub-Sill 422432.09 1989829.78 1148.64 270 -71 160.75

-83 157.40

SST-60 Sub-Sill 422399.744 1989794.96 1142.36 270 -84 149.6

SST-59 Sub-Sill 422,411.03 1989812.01 1145.58 270

SST-64 Sub-Sill 422381.19 1989759.84 1137.64 90 -74 227.55

-90 180.7SST-63 Sub-Sill 422496.47 1989865.24 1158.79 0