Torex Reports High-Grade Intercepts from Sub-Sill Step Out Holes
Corporate Office: 130 King St. West, Suite 1502, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000
www.torexgold.com
TOREX REPORTS HIGH-GRADE INTERCEPTS FROM SUB-SILL STEP OUT HOLES
TORONTO, Ontario, February 13, 2017 – Torex Gold Resources In c. (the “Company” or “Torex”) (TSX:TXG) is pleased to announce
the results of the first round of its step out drilling program for its Sub-Sill target. Highlighted intercepts from this prog ram include 112.7
g/t Au over 3.9m and 23.9 g/t Au over 5.8m in borehole SST-15, 33.7 g/t Au over 2.9m in borehole SST-06, 23.0 g/t Au over 7.4m
and 19.4 g/t Au over 16.0m in borehole ST-07, and 23.2 g/t Au over 4.1m in borehole SST-09.
Fred Stanford, President & CEO of Torex stated: “These encourag ing high grade results indicate that the Sub-Sill mineralization is
open to the north, south, and east, and is also open at depth. A resource estimate that includes today’s results is expected t o be
completed in Q2/17. Another step out drill program is being planned and drilling is expected to commence this quarter. This p rogram
will also seek to probe the extension of mineralization at greater depths, and to identify the source of the magnetism that pas t studies
have indicated is present.” He added: “The 600 meter ramp to access the Sub-Sill has now advanced more than 250 meters and
remains on schedule for completion by mid-year. The ramp will also continue to advance toward the El Limon Deep target that is under
the El Limon pit, and above the ‘’Sill’. Mine planning is underway, and it is expected that processing of Sub-Sill material will commence
before the end of the year.”
Highlights from the step-out exploration drilling at the El Limon Sub-Sill
BH ID Interval (m) Interval
Length (m) Au (g/t) Ag (g/t) Cu (%) Lithology From To
SST-06 68.15 71.06 2.9 33.7 12.1 0.3 Skarn
SST-07 140.78 148.13 7.4 23.0 31.9 1.2 Skarn
SST-07 256.76 272.80 16.0 19.4 28.2 1.0 Skarn
SST-09 118.39 122.50 4.1 23.2 25.6 1.2 Skarn
SST-10 64.50 80.00 15.5 14.9 2.4 0.0 Skarn
SST-15 114.65 120.45 5.8 23.9 4.2 0.1 Skarn
SST-15 134.58 138.49 3.9 112.7 39.2 1.3 Skarn
SST-36 274.53 285.12 10.6 9.1 36.2 3.4 Skarn
Note:
True thickness of the mineralized zone is unknown and is reported as drill hole length
Please refer to Table 1 for a complete list and expanded description of the borehole intercepts reported in this press release. Refer to
Figure 1 for general borehole location.
These are the final 11 holes of an initial 34 hole, 7,727 meter, diamond drill program to explore the high-grade mineralized ar ea located
between the El Limon and El Limon Sur ore deposits and under the El Limon Sill. This 34 hole program tested an area of
approximately 350 meters by 150 meters. The positive results of the later holes of the initial drill program, confirm the cont inuity of the
mineralization and the strength of the system as reported in the previous 23 holes. This new in formation indicates that the sys tem
remains open along strike, down-dip to the northwest and up-dip to the southeast. It also confirms the existence of high-grade
mineralized skarns at greater depths. The mineralized areas are located between 30 and 285 meters below surface.
The El Limon Sill area occurs in the Mesozoic carbonate-rich Morelos Platform, which has been intruded by Paleocene granodiorit e
stocks, sills and dikes. Skarn-hosted gold mineralization is developed along the contacts of the intrusive rocks and the enclosing
carbonate-rich sedimentary rocks. Structurally , the El Limon Sill target area as well as El Limon and El Limon Sur ore deposits are
hosted in a graben bounded by La Flaca fault to the west and the Antena fault to the east, and both are considered to be potent ial
feeders for the mineralization. At the El Limon Sill area, several skarn zones have been identified along the contacts of the c arbonate
rich sediments and marbles of the Cuautla and Morelos formations and sills fingering out from the main granodiorite stock. Indi vidual
Torex Gold Resources Inc. Page 2
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000
www.torexgold.com
high grade ore zones have been intercepted in all the different skarn horizons. Within the skarn zones individual ore shoots va ry in
strike length from approximately 50 meters up to 200 meters, with apparent widths varying from 2 meters to 27 meters.
Mineralization at the El Limon Sill area is primarily gold, associ ated with variable contents of silver and copper. Gold occurs in low and
high sulfidized pyrrhotite rich skarns, while silver and copper mineralization is primarily determined by the degree of sulfida tion of the
host skarn. Mineralization is strongly associated with a late stage retrograde alteration characterized by amphiboles, chlorite , calcite ±
quartz ± epidote, affecting pyroxene-garnet marble related exoskarn and granodiorite porphyry related endoskarn. Locally
mineralization occurs in narrow lenses of massive sulfides.
QA/QC and Qualified Person
At the Morelos Gold Project, all of the El Limon Sill target analytical work is performed by SGS de Mexico S.A. de C.V. ("SGS") in
Durango, Mexico and at SGS Mineral Services in Vancouver, British Columbia, Canada and ALS Chemex de Mexico S.A. de C.V.
Sample preparation is done at SGS sample preparation laboratory in Durango, Mexico. The gold analyses (fire assay with an atomi c
absorption or gravimetric finish) are completed at SGS analytical laboratory in Durango, Mexico and multi-element geochemical
analyses are Copper Sequential Leaching are completed at their analytical facilities in Vancouver, British Columbia, Canada. Ch eck
assays samples are analyzed at ALS Chemex Vancouver, BC, Canada. SGS and ALS Chemex are independent of the Company.
The Company has a Quality Assurance/Quality Control (“QA/QC”) program in place that includes 5% of each of the certified refere nce
materials, blanks and field duplicates. 10% of pulp samples are analyzed at a second laboratory as part of the QA/QC program to
ensure the batch to batch relative bias remains constant and t hat absolute accuracy at anomalous to near cut-off grades is meas ured
and acceptable. The QA/QC program as designed has been approved by Bureau Veritas and is currently overseen by Carlo Nasi,
Chief Mine Geologist for the Morelos Gold Project.
The scientific and technical data contained in this news release pertaining to the Morelos Project has been reviewed and approv ed by
Mr. Mark P. Hertel as a Qualified Person under NI 43-101. Mr. Hertel is a Registered Member of the Society for Mining, Metallurgy &
Exploration, has experience relevant to the style of mineralization under consideration and is an independent consultant. Mr. Hertel has
verified the data disclosed, including sampling, analytical, an d test data underlying the drill results and he consents to the inclusion in
this release of said data in the form and context in which it appears.
Additional information on the El Limon deposit and analytical labs is available in the Company’s most recent annual information form
filed on SEDAR at www.sedar.com and the Company’s website at www.torexgold.com.
Torex is an emerging intermediate gold producer based in Canada, engaged in the exploration, development and operation of its 1 00%
owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometers
southwest of Mexico City. Within this property, Torex has the El Limón Guajes Mine, which announced commercial production in Ma rch
of 2016 and the Media Luna Project, which is in an advanced stage of exploration, and for which the Company issued a preliminar y
economic assessment (PEA) in 2015. The property remains 75% unexplored.
For further information, please contact:
TOREX GOLD RESOURCES INC.
Fred Stanford Gabriela Sanchez
President and CEO Vice President Investor Relations
Tel. (647) 260-1502 Tel. (647) 260-1503
Email: [email protected] E m a i l : [email protected]
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
This press release contains “forward-looking statements” and “for ward-looking information” within the meaning of applicable Can adian securities
legislation. Forward-looking information includes, but is not li mited to, information with respect to the drill program for the El Limon Sub-Sill area and
the results of the drill program contained herein, plans for an additional step out drilling program, future exploration and de velopment plans of the
Company, completion of the ramp access to the targets as descr ibed herein, the potential for mining the El Limon Sub-Sill area, and the timing of an
updated mineral resource estimate. Generally, forward-looking in formation can be identified by the use of forward-looking term inology such as
Torex Gold Resources Inc. Page 3
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304-4000
www.torexgold.com
“plans”, “expects”, “estimates”, “intends”, “anticipates” or “believes” or variations of such words and phrases or state that c ertain actions, events or
results “may”, “could”, “would”, “might”, or “will be taken”, “occur”, or “be achieved”. Forward-looking information is subjec t to known and unknown
risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be
materially different from those expressed or implied by such forward-looking information, including, without limitation, the ri sk associated with the
variability of skarn deposits, the risk that actual results of current exploration and development activities will not achieve expectations and other risk
factors identified in the Company’s annual information form and management’s discussion and analysis. Forward-looking information is based on the
reasonable assumptions, estimates, analysis and opinions of managem ent made in light of its experience and its perception of tr ends, current
conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the
date that such statements are made, but which may prove to be incorrect. Although the Company believes that the assumptions and expectations
reflected in such forward-looking information are reasonable, undue reliance should not be placed on forward-looking informatio n because the
Company can give no assurance that such ex pectations will prove to be correct. There can be no assurance that such information will prove to be
accurate, as actual results and future events could differ material ly from those anticipated in such information. The Company d oes not undertake to
update any forward-looking information, except in accordance with applicable securities laws.
From To
(m) (m) (m) g/t g/t %
SST-06 Sub-Sill 422510.92 1989858.05 1158.38 90 -72 150.00 68.15 71.06 2.9 33.7 12.1 0.3 Skarn
140.78 148.13 7.4 23.0 31.9 1.2 Skarn
256.76 272.80 16.0 19.4 28.2 1.0 Skarn
67.22 71.35 4.1 10.3 50.5 2.3 Skarn
83.05 92.45 9.4 5.5 30.0 1.1 Skarn
140.89 143.36 2.5 18.9 33.6 1.2 Skarn
91.71 97.80 6.1 14.7 3.7 0.2 Skarn
118.39 122.50 4.1 23.2 25.6 1.2 Skarn
139.90 146.67 6.7 6.7 14.4 0.6 Skarn
64.50 80.00 15.5 14.9 2.4 0.0 Skarn
93.25 96.22 3.0 11.1 3.7 0.1 Skarn
SST-11 Sub-Sill 422517.59 1989840.11 1150.91 95 -65 101.20 98.38 99.91 1.5 3.5 8.8 0.2 Skarn
114.65 120.45 5.8 23.9 4.2 0.1 Skarn
134.58 138.49 3.9 112.7 39.2 1.3 Skarn
SST-16 Sub-Sill 422348.54 1989829.52 1193.58 275 -85 314.60
SST-17 Sub-Sill 422555.27 1989831.73 1154.92 95 -60 101.50 80.04 81.36 1.3 16.3 27.2 0.9 Skarn
SST-31 Sub-Sill 422331.27 1989725.14 1128.79 130 -70 300.00 134.03 136.32 2.3 9.4 8.6 0.3 Skarn
SST-36 Sub-Sill 422395.47 1989863.16 1185.09 0 -90 302.50 274.53 285.12 10.6 9.1 36.2 3.4 Skarn
Notes:
True thickness of the mineralized zone is unknown and is reported as drill hole length
The gold values used to calculate the intercept compoasite are uncapped
-71 150.00
No Intercepts
SST-15 Sub-Sill 422399.22 1989845.46 1175.20 95
-68 120.00SST-10 Sub-Sill 422406.57 1989800.12 1143.41 90
-90 221.70
SST-09 Sub-Sill 422385.11 1989765.80 1138.58 80 -81 200.50
SST-08 Sub-Sill 422509.53 1989858.06 1158.42 0
SST-07 Sub-Sill 422453.12 1989886.99 1173.58 0 -90 317.80
Cu LithologyDip (°)
Total
Length
(m)
Intersection Core
Length Au AgAzimuth
(°)Drill-Hole Target
Area UTM-E (m) UTM-N (m) Elevation
(m)
And
2.4m - 230.7 g/t Au
2.4m - 84.1 g/t Au
SST-19
8.1m - 16.0 g/t Au
5.2m - 14.8 g/t Au
And
SST-13
7.0m - 14.9 g/t Au
6.7m - 6.7 g/t Au
3.3m - 17.3 g/t Au
4.1m - 23.2 g/t Au
9.5m - 9.6 g/t Au
1.0m - 103.2 g/t Au
6.1m - 14.7 g/t Au
And
And
And
And
And
SST-29
SST-09
And
And
9.4m - 5.5 g/t Au
4.1m - 10.3 g/t Au
2.5m - 18.9 g/t Au
SST-08
8.7m - 13.6 g/t Au
SST-30
7.5m - 14.3 g/t Au
TMP-1408
3.5m - 8.7 g/t Au
2.9m - 33.7 g/t Au
3.9m - 112.7 g/t Au
5.8m - 23.9 g/t Au
4.9m - 8.6 g/t Au
1.5m - 50.4 g/t Au
1.8m - 6.2 g/t Au
4.3m - 83.3 g/t Au
5.6m - 25.5 g/t Au
6.4m - 7.0 g/t Au
8.0m - 12.5 g/t Au
1.8m - 11.2 g/t Au
2.2m - 1.4 g/t Au
10.6m - 9.1 g/t Au
And
And
And
And
And
And
And
2.3m - 20.1 g/t Au
3.4m - 317.8 g/t Au
3.8m - 7.4 g/t Au
8.6m - 8.0 g/t Au
SST-23
SST-16
2.4m - 10.9 g/t Au
1.9m - 8.9 g/t Au
SST-12
SST-04
SST-36
SST-01
SST-28
SST-32
SST-35
SST-34
SST-14
SST-33
SST-22
SST-15
SST-06
no intercepts
no intercepts
2.1m - 125.8 g/t Au
13.3m - 22.6 g/t Au
And
SST-27
3.2m - 3.9 g/t Au
SST-24
2.5m - 17.5 g/t Au
5.5m - 19.3 g/t AuAnd
TMP-1409
1.9m - 42.8 g/t Au
SST-26
3.4m - 23.9 g/t Au
SST-05
2.3m - 9.4 g/t Au
SST-31
9.6m - 19.6 g/t Au
SST-25
2.8m - 6.8 g/t Au
SST-03
6.5m - 7.2 g/t Au
3.0m - 11.1 g/t Au
3.4m - 12.1 g/t Au
15.5m - 14.9 g/t Au
And
And
SST-02
SST-10
1.3m - 10.6 g/t Au
TMP-1423
1.5m - 3.5 g/t Au
1.3m - 16.3 g/t Au
SST-11
SST-17
0.7m - 12.9 g/t Au
7.4m - 23.0 g/t Au
TMP-1425
SST-07
1.6m - 1.3 g/t Au
SST-21
16.0m - 19.4 g/t Au
And
Legend
Previously Released
Intercepts
New Intercepts
El Limón pit limit
Proposed Tunnel
Limón Sur pit limit
0 25 50 100m
422.400
422.400
422.200
422.200
1.990.000
1.990.000
1.989.800
1.989.800
1.989.600
1.989.600
422.600
422.600