TOREX GOLD REPORTS Q3 2023 PRODUCTION RESULTS On track to deliver on full year guidance with Q4 expected to be the strongest quarter of the year

Production Results

For Immediate Release

TOREX GOLD REPORTS Q3 2023 PRODUCTION RESULTS

On track to deliver on full year guidance with Q4 expected to be the strongest quarter of the year

TORONTO, Ontario, October 11, 2023 – Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX: TXG)

reports Q3 2023 gold production of 85,360 ounces (“oz”) and gold sold of 81,752 oz. With year-to-date gold

production of 315,785 oz and the fourth quarter expected to be the highest production quarter of the year, the

Company remains on track to achieve annual production guidance of 440,000 to 470,000 oz.

TABLE 1: PRELIMINARY THIRD QUARTER 2023 OPERATIONAL RESULTS

Q3 2023

Mining

ELG Open Pits - Ore tonnes mined tpd 11,153

ELG Open Pits - Waste tonnes mined tpd 110,122

ELG Open Pits - Strip ratio waste:ore 9.9

ELG Underground - Ore tonnes mined tpd 2,321

Processing

Total tonnes processed tpd 13,107

Average gold recovery % 88.7

Average gold grade of ore processed gpt 2.47

Gold produced oz 85,360

Gold sold oz 81,752

Operational results are preliminary in nature and subject to final reconciliation. Financial and operational results

for Q3 2023 will be released after market close on Tuesday , November 14, 2023. A conference call hosted by

senior management will be held the following day at 9:00 AM ET.

Jody Kuzenko, President & CEO of Torex, stated:

“The third quarter was challenging as the team pushed through the final months of the high strip, low grade

phase of the open pit mine plan , which continued to require the processing of lower -grade and stockpiled

material to top up the mill. As a result, quarterly gold production was 85,360 oz, which is lower than what was

planned.

“Notwithstanding the short-term challenges associated with strip and grade, the operations continue to deliver

with excellence. ELG Underground set another record with an average mining rate of 2,321 tonnes per day

(“tpd”) during the quarter, surpassing the 1,913 tpd record achieved in the prior quarter and affirming our

expectations for underground mining rates to consistently achieve 2,000 tpd. Plant performance was also solid,

with throughput exceeding 13,000 tpd and recoveries steady despite the lower processed grades.

“Safety performance was also remarkable. Despite the substantial increase in activity at our site with the

construction of the Media Luna Project, there were no lost-time injuries in the quarter.

“With mining of the higher -grade benches started in late September, a period of heavy waste stripping behind

us, and ELG Underground continuing to exceed expectations, we fully expect to achieve full year production

guidance in 2023 as we continue to deliver the safe and reliable production our shareholders have come to

expect from us.”

Page 2

Torex Gold Resources Inc.

THIRD QUARTER 2023 CONFERENCE CALL AND WEBCAST DETAILS

Torex plans to release its third quarter financial and operational results after market close on Tuesday,

November 14, 2023. A conference call and webcast hosted by senior management will be held on November

15, 2023, at 9:00 AM ET.

Telephone Access

Please join the conference call approximately ten minutes prior to the scheduled start time. Dial -in details for

the conference call are as follows:

• Toronto local or International: 1-416-915-3239

• Toll-Free (North America): 1-800-319-4610

Webcast Access

A webcast will be available on the Company’s website at www.torexgold.com/investors/upcoming- events/. The

webcast will be archived on the Company’s website at www.torexgold.com/investors/financial-reports/.

ABOUT TOREX GOLD RESOURCES INC.

Torex is an intermediate gold producer based in Canada, engaged in the exploration, development, and

operation of its 100% owned Morelos Property, an area of 29,000 hectares in the highly prospective Guerrero

Gold Belt located 180 kilometres southwest of Mexico City. The Company’s principal asset is the Morelos

Complex, which includes the El Limón Guajes (“ELG”) Mine Complex, the Media Luna Project, a processing

plant, and related infrastructure. Commercial production from the Morelos Complex commenced on A pril 1,

2016 and an updated Technical Report for the Morelos Complex was released in March 2022. Torex’s key

strategic objectives are to optimize and extend production from the ELG Mine Complex, de-risk and advance

Media Luna to commercial production, build on ESG excellence, and to grow through ongoing exploration

across the entire Morelos Property.

FOR FURTHER INFORMATION, PLEASE CONTACT:

TOREX GOLD RESOURCES INC.

Jody Kuzenko Dan Rollins

President and CEO Senior Vice President, Corporate Development & Investor Relations

Direct: (647) 725-9982 Direct: (647) 260-1503

[email protected] [email protected]

CAUTIONARY NOTES ON FORWARD LOOKING STATEMENTS

This press release contains "forward- looking statements" and "forward -looking information" within the meaning of applicable Canadian

securities legislation. Forward-looking information includes, but is not limited to, statements that: the Company remains on track to deliver

on full year guidance with Q4 expected to be the strongest quarter of the year; the Company remains on track to achieve annual production

guidance of 440,000 to 470,000 oz.; and Torex’s key strategic objectives are to optimize and extend production from the ELG Mine Complex,

de-risk and advance Media Luna to commercial production, build on ESG excellence, and to grow through ongoing exploration across the

entire Morelos Property . Generally, forward- looking information can be identified by the use of forward- looking terminology such as

“guidance”, "expects", “planned”, or variations of such words and phrases or statements that certain actions, events or results are “on track

to” or “will”, or “is expected to" occur. Forward- looking information is subject to known and unknown risks, uncertainties and other factors

that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those

expressed or implied by such forward-looking information, including, without limitation, risks and uncertainties identified in the Company’s

technical report (the “Technical Report”) released on March 31, 2022, entitled “NI 43-101 Technical Report ELG Mine Complex Life of Mine

Plan and Media Luna Feasibility Study”, which has an effective date of March 16, 2022, Company’s annual information form (“AIF”) and

management’s discussion and analysis (“MD&A”) or other unknown but potentially significant impacts. Forward-looking information is based

on the reasonable assumptions, estimates, analyses and opinions of management made in light of its experience and perception of trends,

Page 3

Torex Gold Resources Inc.

current conditions and expected developments, and other factors that management bel ieves are relevant and reasonable in the

circumstances at the date such statements are made. Although the Company has attempted to identify important factors that could cause

actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not

to be as anticipated. There can be no assurance that such information will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such inform ation. Accordingly, readers should not place undue reliance on forward- looking

information. The Company does not undertake to update any forward-looking information, whether as a result of new information or future

events or otherwise, except as may be required by applicable securities laws. The Technical Report, AIF and MD&A are available under

the Company’s profile on SEDAR at www.sedar.com and on the Company’s website at www.torexgold.com.