Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TXG.TO ·

TOREX GOLD REPORTS POSITIVE DRILLING RESULTS FROM ELG UNDERGROUND Impressive drill results demonstrate the potential for ongoing resource expansion and mine life extension at ELG Underground

Drill Results

For Immediate Release

TOREX GOLD REPORTS POSITIVE DRILLING RESULTS FROM ELG

UNDERGROUND

Impressive drill results demonstrate the potential for ongoing resource expansion and

mine life extension at ELG Underground

TORONTO, Ontario, July 11, 2023 – Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX: TXG)

announces assay results from the Company’s ongoing drilling program at the El Limón Guajes underground

mine, including zones referred to as El Limón Deep (“ELD”) , Sub-Sill, Sub-Sill South, El Limón Sur Deep, and

El Limón West (collectively “ELG Underground”).

Jody Kuzenko, President & CEO of Torex, stated:

“We are excited about the positive results from the ongoing drilling program at ELG Underground. The program

is a key facet of our strategy to optimize and extend the mine life at ELG Underground with a view to filling the

mill beyond 2027.

“Infill and s tep-out drilling to the south at El Limó n Sur Deep was successful in extending higher -grade

mineralization outside of the current resource block model. Several drill holes returned notable intersects over

favourable widths including 88.92 grams per tonne gold equivalent (“gpt AuEq”) over 14.5 metres (“m”) in

drill hole LS-220, 11.20 gpt AuEq over 29.4 m and 19.03 gpt AuEq over 13.3 m in LS-221, 6.86 gpt AuEq

over 16.6 m in LS-187, and 7.46 gpt AuEq over 11.6 m in LS-184. These drill results, which include several

higher-grade sub-intervals in addition to other impressive intersects, validate the high grade potential associated

with the area that runs from El Limón Sur Deep to the La Flaca fault (600 m), known as the El Limón Sur Trend,

with potential to extend deeper.

“Drilling at El Limón Sur Deep also encountered areas of economic copper mineralization which we expect to

mine after the flotation circuit, part of the Media Luna Project, is commissioned in late-2024. This will enable us

to maximize margins from this zone of the deposit and to compliment copper production from Media Luna.

“Additionally, step-out drilling looking for the north- south continuity of the feeders on the north side of the Z71

fault completed in late-2022 encountered the deepest recognized mineralization at the 400 m elevation within

the El Limón Sur Trend, with drill hole SST -299 intersecting 4.17 gpt AuEq over 3.7 m . This hole was drilled

within a cluster of holes which included an intersect of 9.56 gpt AuEq over 5.0 m in SST-278 and 6.23 gpt

AuEq over 8.9 m in SST-282. This set of drill holes demonstrates the continuity of mineralization at depth at

ELG Underground and supports previous information from exploratory drill holes that highlight the resource

potential at depth.

“Step-out and infill drilling continue to support our ability to expand and upgrade resources within the ELD, Sub-

Sill, and Sub-Sill South deposits. Drilling at a zone approximately 100 m to the west of El Limón Sur Deep,

referred to as El Limón West, continues to highlight the potential for another underground mining front below

the El Limón Sur open pit. Further work will be conducted in the near future on El Limón West to explore the

potential for a second, parallel corridor of mineralization to the El Limón Sur Trend.

“Overall, the positive results from the underground drilling program support ongoing resource expansion and

reserve growth within ELG Underground, which in turn supports our strategic focus on filling the mill with higher-

grade feed beyond 2027.”

Gold equivalent (“AuEq”) grades use the same metal prices ($1,550/oz gold (“Au”), $20/oz silver (“Ag”) , and

$3.50/lb copper (“Cu”)) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the year-end 2022

Mineral Resource estimate for the ELG Underground (AuEq (gpt) = Au (gp t) + Ag (gpt) * 0.0123 + Cu (%) *

1.6000).

ELG UNDERGROUND – 2023 DRILLING PROGRAM

Through the end of May, approximately 34,300 meters and 177 holes were drilled as part of the 2023 drilling

program at ELG Underground. This represents 60% of the planned meters in this area for 2023 (30,000 m under

the ELG Underground program and 27,000 m under the n ear-mine program), for which assays have been

received for 54% of the metres drilled. The level of infill drilling is expected to increase through the back half of

Page 2

Torex Gold Resources Inc.

the year, with a focus on upgrading I nferred mineral resources to the Indicated category. Step-out drilling from

south of the La Flaca fault to El Limón Sur Deep will focus on further expanding mineralization with the goal of

increasing Inferred mineral resources across the ELG Underground.

The excellent results from the 2022 drilling program and initial results from the 2023 drilling program, including

high grade intersects in several of the underground deposits, have been instrumental in exploring the extent of

the mineralization at depth. This is supported by an improved understanding of the structural controls of

mineralization, which suggest high grade feeders controlled by fault systems trending NNW/SSE and NE/SW,

in the intrusive and sedimentary sequence, within a regional North- South deep structural trend (Figure 1). The

improved interpretation of mineral controls will be incorporated into futur e drilling programs as the Company

looks to identify higher-margin feed to fill the mill beyond 2027.

Figure 1: Drilling program highlights at ELG Underground (Plan View)

Assay results reported in this press release include drill holes completed under the 2023 underground drilling

program as well as drill holes completed in late-2022, for which assays were received after the cut -off date for

inclusion in the year-end Mineral Resource estimate. Drill hole intersects are core lengths and not true widths.

Results from the ongoing underground drilling program are reported in Table 1 ( El Limón Sur Deep), Table 2

(Sub-Sill South), Table 3 (ELD), Table 4 (Sub-Sill), and Table 5 (El Limón West).

Page 3

Torex Gold Resources Inc.

El Limón Sur Trend

Drilling completed in late- 2022 that focused on the extension of the Sub-Sill and ELD deposits to the south

encountered mineralization down to an elevation of 400 m (drill hole SST-299), which is 125 m below the lowest

Inferred resource at Sub-Sill and 275 m below the lowest elevation of Inferred resources at ELD . This hole, as

well as drill holes SST-278 and SST -282 confirm the existence of deep mineralization that was previously

detected in exploratory holes . The mineralization appears to be related to the higher-grade feeders of the El

Limón Sur Trend (Figures 1, 2, and 3).

• SST-278

o 13.16 gpt AuEq over 16.64 m (11.79 gpt Au, 14.3 gpt Ag and 0.74% Cu)

 including 21.67 gpt AuEq over 5.39 m (19.73 gpt Au, 21.3 gpt Ag and 1.05% Cu)

o 9.56 gpt AuEq over 4.95 m (9.13 gpt Au, 6.2 gpt Ag and 0.22% Cu)

• SST-282

o 6.23 gpt AuEq over 8.93 m (5.63 gpt Au, 12.2 gpt Ag and 0.28% Cu)

• SST-299

o 4.17 gpt AuEq over 3.66 m (4.08 gpt Au, 1.0 gpt Ag and 0.05% Cu)

The resource categorization and expansion program at El Limón Sur Deep has yielded outstanding results,

particularly in extending mineralization outside of the current resource block model, both laterally and vertically

to the north and south. Drilling at El Limón Sur Deep returned several impressive intersects over fav ourable

widths, which confirm the high grade potential of the main feeders . Drill results from this area include strong

copper intersects which are expected to be mined after upgrades to the processing plant (including a copper

flotation circuit) are completed in late-2024 as part of the Media Luna Project (Figure 3).

• LS-220

o 88.92 gpt AuEq over 14.46 m (88.61 gpt Au, 20.6 gpt Ag and 0.04% Cu)

 including 75.97 gpt AuEq over 2.00 m (75.53 Au, 30.0 Ag and 0.04% Cu)

 including 759.47 gpt AuEq over 1.29 m (757.86 gpt Au, 126.1 gpt Ag and 0.04% Cu)

• LS-221

o 11.20 gpt AuEq over 29.38 m (9.86 gpt Au, 42.0 gpt Ag and 0.52% Cu)

 including 26.06 gpt AuEq over 4.55 m (25.31 gpt Au, 29.0 gpt Ag and 0.25% Cu)

 including 28.98 gpt AuEq over 3.38 m (25.61 gpt Au, 108.2 gpt Ag and 1.27% Cu)

o 19.03 gpt AuEq over 13.31 m (11.84 gpt Au, 73.7 gpt Ag and 3.93% Cu)

 including 28.29 gpt AuEq over 5.55 m (21.18 gpt Au, 94.5 gpt Ag and 3.72% Cu)

• LS-197

o 7.38 gpt AuEq over 17.06 m (5.78 gpt Au, 44.0 gpt Ag and 0.66% Cu)

 including 11.39 gpt AuEq over 3.84 m (8.88 gpt Au, 74.5 gpt Ag and 1.00% Cu)

o 10.39 gpt AuEq over 5.86 m (4.13 gpt Au, 125.9 gpt Ag and 2.94% Cu)

• LS-187

o 6.86 gpt AuEq over 16.63 m (4.61 gpt Au, 34.4 gpt Ag and 1.14% Cu)

 including 9.05 gpt AuEq over 3.89 m (3.60 gpt Au, 65.8 gpt Ag and 2.90% Cu)

• LS-183

o 17.85 gpt AuEq over 5.21 m (16.66 gpt Au, 20.6 gpt Ag and 0.58% Cu)

• LS-184

o 7.46 gpt AuEq over 11.62 m (6.00 gpt Au, 40.7 gpt Ag and 0.60% Cu)

• LS-203

o 9.95 gpt AuEq over 7.50 m (9.56 gpt Au, 10.1 gpt Ag and 0.17% Cu)

Page 4

Torex Gold Resources Inc.

Drilling at Sub-Sill South was also successful , with assay results highlighting the potential to upgrade Inferred

resources to the Indicated category and expand Inferred resources both laterally and vertically to the north and

south (Figure 3).

• SST-320

o 9.88 gpt AuEq over 9.62 m (9.41 gpt Au, 11.3 gpt Ag and 0.21% Cu)

• SST-321

o 5.77 gpt AuEq over 3.00 m (4.59 gpt Au, 23.3 gpt Ag and 0.56% Cu)

• SST-286

o 5.07 gpt AuEq over 7.76 m (4.16 gpt Au, 8.2 gpt Ag and 0.51% Cu)

ELD

At ELD, step -out drilling along the southwest extension of the deposit and infill drilling retur ned several

impressive intersects that indicate the potential to expand resources at depth while upgrading Inferred resources

to the Indicated category (Figure 2).

• LDUG-233

o 11.29 gpt AuEq over 34.89 m (9.48 gpt Au, 23.6 gpt Ag and 0.95% Cu)

 Including 21.13 gpt AuEq over 15.10 m (18.03 gpt Au, 45.5 gpt Ag and 1.59% Cu)

• LDUG-229

o 9.70 gpt AuEq over 18.17 m (9.20 gpt Au, 6.3 gpt Ag and 0.26% Cu)

o 8.68 gpt AuEq over 16.87 m (7.63 gpt Au, 25.5 gpt Ag and 0.46% Cu)

o 10.65 gpt AuEq over 4.00 m (9.47 gpt Au, 10.9 gpt Ag and 0.65% Cu)

o 8.82 gpt AuEq over 5.18 m (8.71 gpt Au, 2.8 gpt Ag and 0.05% Cu)

• LDUG-218

o 6.06 gpt AuEq over 4.75 m (5.80 gpt Au, 3.3 gpt Ag and 0.14% Cu)

o 7.24 gpt AuEq over 7.03 m (7.09 gpt Au, 2.9 gpt Ag and 0.07% Cu)

Sub-Sill

Step-out drilling to the north and south of the deeper extension of the Sub- Sill deposit and infill drilling around

the existing resource continue to support the potential to expand and upgrade resources at depth (Figure 4).

• SST-306

o 18.95 gpt AuEq over 4.08 m (18.83 gpt Au, 3.7 gpt Ag and 0.05% Cu)

• SST-303

o 5.17 gpt AuEq over 7.61 m (4.39 gpt Au, 7.8 gpt Ag and 0.43% Cu)

• SST-301

o 5.12 gpt AuEq over 6.11 m (5.04 gpt Au, 1.5 gpt Ag and 0.04% Cu)

El Limón West

Follow-up drilling at El Limón West, a zone of mineralization below the El Limón Sur pit and approximately 100

m west of the El Limón Sur Deep deposit, continues to highlight the potential for another new mining front within

ELG Underground (Figure 5). Mineralization at El Limón West is controlled and hosted by a phreatomagmatic

breccia pipe, which differs from the mineralization commonly associated with the El Lim ón Sur Trend. This

indicates the potential of a second structural corridor and other styles of mineralization across the broader

Morelos Property and will be explored further in the near future.

• LS-207

o 6.16 gpt AuEq over 16.01 m (4.92 gpt Au, 30.4 gpt Ag and 0.54% Cu)

• LS-218

o 8.83 gpt AuEq over 5.21 m (8.10 gpt Au, 25.1 gpt Ag and 0.26% Cu)

Page 5

Torex Gold Resources Inc.

• LS-169

o 7.52 gpt AuEq over 4.41 m (6.25 gpt Au, 30.3 gpt Ag and 0.56% Cu)

EL LIMÓN GUAJES MINE COMPLEX GEOLOGY

The ELG Mine Complex, located in the central part of the Guerrero Gold Belt in southwest Mexico, is hosted in

the Mesozoic carbonate-rich Morelos Platform, which has been intruded by Paleocene granodiorite stocks, sills,

and dikes. Skarn- hosted gold mineralization is developed along the contacts of the intrusive rocks and the

enclosing carbonate-rich sedimentary rocks of the Cuautla and Morelos formations as well as along the footwall

contact of the Mezcala Formation.

Gold mineralization at ELG occurs in association with a skarn body that was developed along a 2-kilometre-

long corridor following the northeast contact of the ELG granodiorite stock. The skarn zone that occurs at the

marble stratigraphic level of the Morelos Formation is in contact with hornfels developed in the Mezcala

Formation. At El Limón, skarn mineralization is also structurally controlled by NE-SW and WNW-ESE trending

faults and fracture zones. Skarn alteration and mineralization at ELG are fairly typical of calcic gold- skarn

systems. Zones of coarse, massive, garnet-dominant skarn appear within and along the stock margin, with fine-

grained pyroxene-dominant skarn more common at greater distances from the contact with the stock. Significant

gold mineralization at ELG is associated with the skarn, preferentially occurring in pyroxene- rich exoskarn but

also hosted in garnet-rich endoskarn that has been affected by retrograde alteration.

Pre- and post-mineralization dykes and sills are found to crosscut the hornfels and marble, along the structural

trends mentioned above, and are spatially associated with the skarn formation.

The style of mineralization at El Lim ón Sur Deep is like Sub- Sill and ELD, and is characterized by gold, with

locally high silver and copper grades. Gold occurs in variably sulfidized, pyrrhotite -rich skarn, while silver and

copper mineralization is controlled primarily by the degree of sulfidation of the host skarn. Mineralization is

mainly associated with retrograde alteration characterized by the occurrence of phlogopite, amphibole, chlorite,

calcite and lesser amounts of quartz and epidote, and local magnetite.

QA/QC AND QUALIFIED PERSON

Torex maintains an industry -standard analytical quality assurance and quality control (QA/QC) and data

verification program to monitor laboratory performance and ensure high- quality assays. Results from this

program confirm reliability of the assay results. All sampling and analytical work for the mine exploration program

is performed by SGS de Mexico S.A. de C.V. (“SGS”) in Durango, and by SGS at Minera Media Luna site

facilities in Mexico. Gold analyses comprise fire assays with atomic absorption or gravimetric finish. External

check assays for QA/QC purposes are performed at ALS Chemex de Mexico S.A. de C.V.

The analytical QA/QC program is currently overseen by Carlo Nasi, Chief Mine Geologist for Minera Media

Luna, S.A. de C.V.

Scientific and technical data contained in this news release has been reviewed and approved by Carolina Milla,

P.Eng. Ms. Milla is a member of the Association of Professional Engineers and Geoscientists of Alberta

(Member ID #168350), has experience relevant to the style of mineralization under consideration, is a qualified

person under NI 43-101, and is an employee of Torex. Ms. Milla has verified the data disclosed, including

sampling, analytical, and test data underlying the drill results; verification included visually reviewing the

drillholes in three dimensions, comparing the assay results to the original assay certificates, reviewing the drilling

database, and reviewing core photography consistent with standard practice. Ms. Milla consents to the inclusion

in this release of said data in the form and context in which they appear.

Additional information on the El Limón Sur deposit, sampling and analyses, analytical labs, and methods used

for data verification is available in the Company’s technical report entitled the “Morelos Property, NI 43- 101

Technical Report, ELG Mine Complex Life of Mine Plan and Media Luna Feasibility Study, Guerrero State,

Mexico”, dated effective March 16, 2022 filed on March 31, 2022 (the “2022 Technical Report”) and in the annual

information form ("AIF") dated March 30, 2023, each filed on SEDAR at www.sedar.com and the Company’s

website at www.torexgold.com.

Page 6

Torex Gold Resources Inc.

ABOUT TOREX GOLD RESOURCES INC.

Torex is an intermediate gold producer based in Canada, engaged in the exploration, development, and

operation of its 100% owned Morelos Property, an area of 29,000 hectares in the highly prospective Guerrero

Gold Belt located 180 kilometres southwest of Mex ico City. The Company’s principal asset is the Morelos

Complex, which includes the El Limón Guajes (“ELG”) Min e Complex, the Media Luna Project, a processing

plant and related infrastructure. Commercial production from the Morelos Complex commenced on April 1, 2016

and an updated Technical Report for the Morelos Complex was released in March 2022. Torex’s key strategic

objectives are to extend and optimize production from the ELG Mining Complex, de- risk and advance Media

Luna to commercial production, build on ESG excellence, and to grow through ongoing exploration across the

entire Morelos Property.

FOR FURTHER INFORMATION, PLEASE CONTACT:

TOREX GOLD RESOURCES INC.

Jody Kuzenko Dan Rollins

President and CEO Senior Vice President, Corporate Development & Investor Relations

Direct: (647) 725-9982 Direct: (647) 260-1503

[email protected] [email protected]

CAUTIONARY NOTES ON FORWARD LOOKING STATEMENTS

This press release contains "forward- looking statements" and "forward -looking information" within the meaning of applicable Canadian

securities legislation. Forward-looking information also includes, but is not limited to, statements about: impressive drill results demonstrate

the potential for ongoing resource expansion and mine life extension at ELG Underground; the Company’s strategy to optimize and extend

the mine life at ELG Underground with a view to filling the mill beyond 2027; the results of the infill and step-out drilling to the south at El

Limón Sur Deep validate the high grade potential associated with the area that runs from El Limón Sur Deep to the La Flaca fault (known

as the “El Limón Sur Trend”), with potential to extend deeper; the expectation that the Company will mine areas of copper mineralization

encountered at El Limón Sur Deep after the flotation circuit is commissioned in late 2024 as part of the Media Luna Project; the mining of

these areas of copper mineralization will enable the Company to maximize margins from this zone of the deposit and will compliment copper

production from Media Luna; the step- out drilling looking for the no rth-south continuity of the feeders on the north side of the Z71 fault

demonstrates the continuity of mineralization at depth in ELG Underground and supports previous information from exploratory drill holes

that highlights the resource potential at depth; the step-out and infill drilling continue to support the Company’s ability to expand and upgrade

resources within the ELD, Sub-Sill, and Sub-Sill South deposits; drilling at a zone approximately 100 m to the west of El Limón Sur Deep,

referred to as El Limón West, continues to highlight the potential for another underground mining front below the El Limón Sur open pit;

further work will be conducted in the near future on El Limón West to explore the potential for a second, parallel corridor of mineralization

to the El Limón Sur Trend; overall, the positive results from the drilling program support ongoing resource expansion and reserve growth

within ELG Underground, which in turn supports the Company’s strategic focus on filling the mill with higher-grade feed beyond 2027; the

level of infill drilling is expected to increase through the back half of the year, with a focus on upgrading Inferred mineral resourc es to the

Indicated category; step-out drilling from south of the La Flaca fault to El Limón Sur Deep will focus on further expanding mineralization with

the goal of increasing Inferred mineral resources across the ELG Underground; the assay results from drilling at Sub- Sill South highlight

the potential to upgrade Inferred resources to the Indicated category and expand Inferred resources both laterally and vertically to the north

and to the south; at ELD, step-out and infill drilling along the southwest extension of the deposit returned several impressive intersects that

indicate the potential to expand resources at depth while upgrading Inferred resources to the Indicated category; step- out drilling to the

north and south of the deeper extension of the Sub-Sill deposit and infill drilling around the existing resource continue to support the potential

to expand and upgrade resources at depth; the potential of a second structural corridor and other styles of mineralization across the broader

Morelos Property and will be explored further in the near future; follow-up drilling at El Limón West continues to highlight the potential for

another new mining front within ELG Underground; and the Company’s key strategic objectives to extend and optimize production from the

ELG Mining Complex, de-risk and advance Media Luna to commercial production, build on ESG excellence, and to grow through ongoing

exploration across the entire Morelos Property. Generally, forward- looking information can be identified by the use of forward- looking

terminology such as “strategy”, “demonstrate”, “potential” , “continue”, “ongoing” , “goal ” or variations of such words and phrases or

statements that certain actions, events or results “will”, or “is /are expected to" occur or “with a view to” . Forward-looking information is

subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or

achievements of the Company to be materially different from those expressed or implied by such forward- looking information, including,

without limitation, those risk factors identified in the 2022 Technical Report and the Company’s annual information form (“AIF”) and

management’s discussion and analysis (“MD&A”) or other unknown but potentially significant impacts. Forward-looking information is based

on the assumptions discussed in the 2022 Technical Report, the AIF and the MD&A and such other reasonable assumptions, estimates,

analysis and opinions of management made in light of its experience and perception of trends, current conditions and expected

developments, and other factors that management believes are relevant and reasonable in the circumstances at the date such statements

are made. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those

contained in the forward- looking information, there may be other factors that cause results not to be as anticipated. There can be no

assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated

in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake

to update any forward-looking information, whether as a result of new information or future events or otherwise, except as may be required

by applicable securities laws.

Page 7

Torex Gold Resources Inc.

Figure 2: Drilling program highlights at the ELG Underground (Long Section)

Page 8

Torex Gold Resources Inc.

Figure 3: Drilling along the El Limón Sur Trend highlights the potential for resource expansion at both the Sub-

Sill South and El Limón Sur Deep deposits