Torex GOLD Reports 2019 Year-End Mineral Reserves & Resources FOR El Limón Guajes Complex
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
TOREX GOLD REPORTS 2019 YEAR-END MINERAL RESERVES & RESOURCES FOR
EL LIMÓN GUAJES COMPLEX
TORONTO, Ontario, April 28, 2020 – Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX: TXG) reports that in 2019,
for the Company’s El Limón Guajes (ELG) Complex, total gold reserves declined 9% (approximately 0.22 million ounces). Open
pit gold reserves declined 19% year -over-year, primarily due to depletion. Exploration success resulted in underground gold
reserves increasing 140%, net of depletion. The gold price used to estimate the 2019 year-end gold reserves is unchanged at
US$1,200 per ounce. The Company also announces that it is continuing to rely on an exemption provided under Ontario
securities law and plans to file the annual information form (the “AIF”) on or around May 6, 2020.
Fred Stanford, President & CEO of Torex, stated:
“By the beginning of 2024, the open pit portion of ELG will be mined out and Torex expects to be mining exclusively from
underground resources, primarily from Media Luna. Between now and 2024, we have lots of time to continue the process of
upgrading underground resources to reserves. In 2019 we completed the first infill drill program at Media Luna and upgraded
2.24 million gold equivalent ounces to the Indicated resource category. These ounces will be considered for conversion to
reserves in a feasibility study, which is underway and is expected to be complete in H1 2021. Media Luna also contains a large
Inferred resource of 4.56 million gold equivalent ounces. Some of these ounces will be targeted for upgrade to the Indicated
resource category in a 2020 infill drill program. The timing of the infill drill program is such that the resulting upgraded ounces
are also expected to be considered for conversion to reserves in the 2021 feasibility study. The Media Luna magnetic anomaly
that hosts these Indicated and Inferred gold equivalent ounces is only 1/3rd explored and offers significant opportunity for future
exploration to extend the Media Luna mine life.
“The ELG deposits also show significant down dip potential, some of which is currently being mined at Sub-Sill. The 2019 ELG
underground exploration program resulted in a 140% increase in reserves, net of depletion. In 2020, the exploration program
will continue under the El Limon pit at both Sub -Sill and E LD, and even broaden out to determine whether mineralization
continues below the Guajes pit. We are preparing for the transition to underground mining, well in advance, and look forward to
capitalizing on the potential of these underground resources and of our proprietary Muckahi Mining System.”
Table 1: Year-over-year comparison of mineral reserves & resources for the El Limón Guajes Complex
Notes:
1) The reader is cautioned not to misconstrue this tabulation as a mineral resource statement. Listed grades and tonnes are shown for comparison purposes only.
2) 2019 mineral resources estimate excludes the impact of mineral resources related to the ELD underground, for which a maiden mineral resource and reserve was published in June 2019.
Impact on open pit Measured & Indicated mineral resources at year-end 2019 was 3.0 Mt of ore and 0.31 Moz of gold that was depleted due to mining. Impact on open pit Inferred mineral
resources at year-end 2019 was 0.8 Mt of ore and 0.08 Moz of gold that was depleted due to mining.
3) For additional information on mineral reserves and resources, please refer to the notes following Table 2 and 3 at the end of this press release.
4) Year-end mineral reserves and resources as well as year-over-year variance subject to rounding.
December 31, 2019 December 31, 2018 Variance
Tonnes Au Au Tonnes Au Au Tonnes Au Au
(Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)
Proven & Probable Reserves
Open Pit (including stockpiles) 21.40 2.76 1.90 24.82 2.92 2.33 (14%) (6%) (19%)
Underground 1.72 6.51 0.36 0.66 6.94 0.15 161% (6%) 140%
Total 23.12 3.04 2.26 25.48 3.02 2.48 (9%) 0% (9%)
Measured & Indicated Resources
Open Pit 24.85 2.97 2.37 35.78 2.77 3.19 (31%) 7% (26%)
Underground 2.87 7.07 0.65 1.17 7.04 0.26 146% 0% 151%
Total 27.73 3.39 3.03 36.95 2.91 3.45 (25%) 17% (12%)
Inferred Resources
Open Pit 2.42 1.88 0.15 3.52 1.89 0.21 (31%) (1%) (30%)
Underground 2.44 5.69 0.45 1.28 5.91 0.24 91% (4%) 86%
Total 4.86 3.79 0.59 4.80 2.96 0.45 1% 28% 32%
Torex Gold Resources Inc. Page 2
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Mineral resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and Mineral
Reserves and the 2019 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (collectively, the
“CIM Standards”).
ELG Mineral Reserves
Proven and Probable gold reserves declined 0.22 million ounces year-over-year assuming a gold price of US$1,200 per ounce,
in line with the gold price used by the Company to estimate gold mineral reserves at the end of 2018 and in the Technical Report,
as defined below (Table 2). The primary driver of the decline was mine depletion of 0.56 million ounces, including 0.51 million
ounces processed with the remainder stockpiled. Success within the step-out and infill exploration programs at the Sub-Sill and
ELD underground deposits helped offset depletion, with underground reserves (contained gold) increasing 0.21 million ounces,
net of depletion of 0.10 million ounces. Beyond model adjustments, the key change to reserves reflects the use of a lower cut-off
grade within the El Limón and Guajes open pits relative to the cut-off grade used at the end of 2018 (1.0 g/t gold versus 1.1 g/t).
ELG Mineral Resources
Measured and Indicated gold resources decreased 0. 42 million ounces relative to the end of 2018, with ong oing exploration
success within the underground deposits partially offsetting depletion (Table 3). I nferred gold resources increased
0.14 million ounces year-over-year primarily reflecting underground exploration success.
The gold price used to estimate open pit and underground mineral resources was US$1,550 per ounce, an increase over the
US$1,380 per ounce gold price used to estimate resources at the end of 2018 and in the Technical Report. The application of
a higher gold price to estimate resources at ELG is consistent with the gold price used to estimate resources at the Company’s
Media Luna project. Open pit resources are estimated using a cut -off grade of 0.8 g/t gold versus the prior cut -off grade of
0.7 g/t, reflecting assumption of higher operating costs within the model.
Resources for the El Limón open pit have been adjusted to remove resources associated with the ELD underground deposit.
Given a maiden resource for ELD was released during 2019, the same adjustment was not included i n the 2018 year -end
resource categories for the El Limón open pit (see notes for Table 1).
QA/QC and Qualified Persons
Torex maintains an industry -standard analytical quality assurance/quality control ( QA/QC) and data verification program to
monitor laboratory performance and to ensure high quality assay results. Results from this program confirm reliability of the
assay results. All sampling is conducted by Torex Gold with analytical work for exploration prog rams at El Limón Guajes
performed by SGS de Mexico S.A. de C.V. (“SGS”) in Durango, and by SGS in Nuevo Balsas, Mexico (each lab is independent
of the Company). Gold analyses comprise fire assays with atomic absorption or gravimetric finish.
External check assays for QA/QC purposes are performed by ALS Chemex de Mexico S.A. de C.V. (independent of the
Company). The analytical QA/QC program at El Limón Guajes is currently overseen by Carlo Nasi, Chief Mine Geologist for
Minera Media Luna, S.A. de C.V.
The scientific and technical data contained in this news release pertaining to mineral resources have been reviewed and
approved by Lars Weiershäuser, PhD, PGeo. Dr. Weiershäuser is a “Qualified Person” as defined by NI 43 -101, and he is a
member of the Association of Professional Geoscientists of Ontario (APGO#1504), has experience relevant to the style of
mineralization under consideration, and is an employee of Torex. Dr. Weiershäuser has verified the data disclosed, including
sampling, analytical, and test data underlying the drill results, and he consents to the inclusion in this release of said data in the
form and context in which they appear.
The scientific and technical data contained in this news release pertaining to mineral reserves has been reviewed and approved
by Mr. Clifford Lafleur, P.Eng who is a Qualified Person as defined by NI 43-101 and an employee of the Company. Mr. Lafleur
is a registered member of the Professional Engineers of Ontario, has worked the majority of his career in underground hard rock
mining in Canada and Mexico in progressively senior engineering roles with relevant experience in mine design and planning,
mining economic viability assessments, and mining studies.
Torex Gold Resources Inc. Page 3
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Additional information on the ELD deposit, including but not limited to, sampling and analyses, analytical labs, and methods
used for data verification is available in the Company’s most recent annual information form and the technical report entitled
“Morelos Property, NI 43-101 Technical Report, ELG Mine Complex, Life of Mine Plan and Media Luna Preliminary Economic
Assessment, Guerrero State, Mexico ” with an effective date of March 31, 2018 (filing date September 4, 2018) (the “Technical
Report”) filed on SEDAR at www.sedar.com and the Company’s website at www.torexgold.com.
Filing of Annual Information Form
Further to its press release on March 30, 2020, the Company is conti nuing to rely on an exemption provided under Ontario
securities law regarding the filing of its AIF for the year ended December 31, 2019, and expects to file its AIF on or around May
6, 2020. The Company confirms that its directors, officers and other employees are subject to the Company’s Insider Trading
Policy and such policy reflects the principles in section 9 of National Policy 11-207. The Company also confirms that all material
business developments since the March 30 th news release have been press released and material change reports filed on
SEDAR at www.sedar.com.
About Torex Gold Resources Inc.
Torex is an intermediate gold producer based in Canada, engaged in the exploration, development , and operation of its 100%
owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometres
southwest of Mexico City. The Company’s principal assets are the El Limón Guajes mining complex (“ELG” or the “ELG Mine
Complex”), comprising the El Limón, Guajes , and El Limón Sur open pits, the El Limón Guajes underground mine including
zones referred t o as Sub -Sill and ELD, and the processing plant and related infrastructure, which commenced commercial
production as of April 1, 2016, and the Media Luna deposit, which is an early stage development project, and for which the
Company issued an updated prel iminary economic assessment in September 2018 (the “Technical Report”). The property
remains 75% unexplored.
For further information, please contact:
TOREX GOLD RESOURCES INC.
Fred Stanford
President and CEO
Direct: (647) 260-1502
Email: [email protected]
Dan Rollins
Vice President, Corporate Development & Investor Relations
Direct: (647) 260-1503
Email: [email protected]
CAUTIONARY NOTES
Muckahi Mining System
The Technical Report includes information on Muckahi. It is important to note that Muckahi is experimental in nature and has not been tested
in an operating mine. Many aspects of the system are conceptual, and proof of concept has not been demonstrated. Drill and blast
fundamentals, standards and best practices for underground hard rock mining are applied in the Muckahi, where applicable. The proposed
application of a monorail system for underground transportation for mine development and production mining is unique to underground hard
rock mining. There are existing underground hard rock mines that use a monorail system for transportation of materials and eq uipment,
however not in the capacity de scribed in the Technical Report. Aspects of Muckahi mining equipment are currently in the design and test
stage. The mine design, equipment performance and cost estimations are conceptual in nature, and do not demonstrate technical or
economic viability. The Company has completed the development and the first phase of testing the concept for the mine development and
production activities and will move to optimization in 2020 to further verify the viability of Muckahi.
Forward Looking Statements
This press release contains "forward -looking statements" and "forward -looking information" within the meaning of applicable Canadian
securities legislation. Notwithstanding the Company's efforts, there can be no guarantee that the Company will not face unf oreseen delays
or disruptions of its operations including without limitation, delays caused by the COVID-19 pandemic or blockades limiting access to the
ELG Mine Complex and the Media Luna Project or by blockades or trespassers impacting the Company’s abil ity to operate, or delays and
disruptions in the in the preparation and filing of its Q1 2020 financial and operational results and AIF . Forward-looking information also
includes, but is not limited to, statements that the Company will continue mining, dev elopment and exploration success, regarding the
advancement of Media Luna towards construction; and future gold prices; by the beginning of 2024, the open pit portion of ELG will be mined
out and the Company expects to be mining exclusively from undergroun d resources, primarily from Media Luna ; between now and 2024,
Torex Gold Resources Inc. Page 4
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Company will have lots of time to continue the process of upgrading underground mineral resources to reserves; the Media Luna Indicated
mineral resources will be considered for conversion to mineral reserves in a feasibility study, which is underway and is expected to be
complete in H1 2021; some of the Media Luna Inferred resource will be targeted for upgrade to the Indicated confidence category in a 2020
infill drill program ; the timing of the infill drill program is such that the resulting upgraded ounces are also expected to be considered for
conversion to reserves in the 2021 feasibility study; the Media Luna magnetic anomaly that hosts these Indicated and Inferred gold equivalent
ounces is only 1/3rd explored and offers significant opportunity for future exploration to extend the Media Luna mine life ; the ELG deposits
also show significant down dip potential; in 2020, the exploration program will continue under the El Limon pit at both Sub-Sill and ELD, and
even broaden out to determine whether mineralization continues below the Guajes pit ; the Company is preparing for the transition to
underground mining, well in advance, and the Company looks forward to capitalizing on the potential of these underground resources and
of the proprietary Muckahi Mining System. Generally, forward-looking information can be identified by the use of forward-looking terminology
such as "plans", "expects", "believes", “future”, “strive” or variations of such words and phrases or state that certain actions, events or results
“can”, "may", "could", "would", "might", "be achieved", “appears” or “focus on”. Forward-looking information is subject to known and unknown
risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be
materially different from those expressed or implied by such forward -looking information, including, without limitation, uncertainty involving
the inability of the Company’s mining and exploration operations to operate as intended due t o shortage of skilled employees, shortages in
supply chains, inability of employees to access sufficient healthcare, significant social upheavals, government or regulatory actions or
inactions, decreased demand or the inability to sell precious metals or d eclines in the price of precious metals, capital market volatility, or
other unknown but potentially significant impacts, and uncertainty involving skarns deposits and the management of soluble copper and iron
and those risk factors identified in the Techn ical Report and the Company’s annual information form and management’s discussion and
analysis. Notwithstanding the Company's efforts, there can be no guarantee that the Company does not have employees who have the
COVID-19 infection or that the Company’s measures to protect employees and surrounding communities from COVID -19 during this period
will be effective and those risk factors identified in the Technical Report and the Company’s annual information form and management’s
discussion and analysis. Forw ard-looking information is based on the assumptions discussed in the Technical Report and such other
reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and perception of tren ds, current
conditions and exp ected developments, and other factors that management believes are relevant and reasonable in the circumstances at
the date such statements are made. Although the Company has attempted to identify important factors that could cause actual r esults to
differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated.
There can be no assurance that such information will prove to be accurate, as actual results and future events coul d differ materially from
those anticipated in such information. Accordingly, readers should not place undue reliance on forward -looking information. The Company
does not undertake to update any forward -looking information, whether as a result of new inform ation or future events or otherwise, except
as may be required by applicable securities laws.
Torex Gold Resources Inc. Page 5
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Table 2: Mineral Reserve Estimate – El Limón Guajes Mining Complex
Notes to accompany mineral reserve table:
1) Mineral reserves are founded on Guajes, El Limón and El Limón Sur measured and indicated mineral resources with an effective date of December 31, 2019.
2) Mineral reserves are based on open pit mining within designed pits and underground cut and fill mining where appropriate and include estimates of dilution and mining losses.
3) El Limón and Guajes Open Pit mineral reserves are reported above a diluted cut -off grade of 1.0 g/t Au and 1.1 g/t Au for El Limón Sur within designed pits. El Limón and Guajes Low Grade
mineral reserves are reported above a diluted cut-off grade of 0.9 g/t Au.
4) El Limón Underground mineral reserves are reported above a diluted cut -off grade of 3.7g/t Au and 1.0 g/t Au for incremental material within designed mechanized cut and fill stope shapes.
5) Cut-off grades, designed pits, and mining shapes are considered appropriate for a metal price of US$1,200/oz Au and metal recoveries of 88% Au.
6) Mineral reserves were developed in accordance with CIM guidelines.
7) Rounding may result in apparent summation differences between tonnes, grad e, and contained metal content.
8) The qualified person for the mineral reserve estimate is Clifford Lafleur P.Eng the Director of Mineral Resources and Mine En gineering for the Corporation.
As of December 31, 2019 Tonnes Au Ag Au Ag
(Mt) (g/t) (g/t) (koz) (koz)
Reserves - Open Pit
El Limón (including El Limón Sur)
Proven 3.13 3.53 3.9 356 397
Probable 8.18 3.08 4.0 811 1,039
Proven & Probable 11.31 3.21 4.0 1,167 1,436
Guajes
Proven 2.41 3.44 3.1 266 243
Probable 2.74 3.16 2.7 278 236
Proven & Probable 5.15 3.29 2.9 545 479
Mined Stockpiles
Proven 2.39 1.42 4.3 110 332
El Limón Guajes Low Grade
Proven 0.62 0.94 1.9 19 37
Probable 1.92 0.94 2.2 58 136
Proven & Probable 2.54 0.94 2.1 77 173
Total Open Pit
Proven 8.56 2.73 3.7 751 1,009
Probable 12.84 2.78 3.4 1,147 1,411
Proven & Probable 21.40 2.76 3.5 1,898 2,420
Reserves - El Limón Guajes Underground
Sub-Sill
Proven 0.33 7.67 10.4 82 111
Probable 0.50 6.52 8.3 104 132
Proven & Probable 0.83 6.98 9.1 186 243
ELD
Proven - - - - -
Probable 0.89 6.07 5.8 174 166
Proven & Probable 0.89 6.07 5.8 174 166
Total El Limón Guajes Underground
Proven 0.33 7.67 10.4 82 111
Probable 1.39 6.23 6.7 278 297
Proven & Probable 1.72 6.51 7.4 360 409
Reserves - Open Pit & Underground
El Limón Guajes Complex
Proven 8.89 2.91 3.9 833 1,120
Probable 14.22 3.12 3.7 1,425 1,709
Proven & Probable 23.12 3.04 3.8 2,258 2,829
Torex Gold Resources Inc. Page 6
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Table 3: Mineral Resource Estimate – El Limón Guajes Mining Complex
Notes to accompany mineral resource table:
1) The effective date of the estimate is December 31, 2019.
2) The estimate was prepared by Dr. Lars Weiershäuser, P.Geo., an employee of the Company, who is a “Qualified Person” under NI 43-101.
3) Mineral resources are reported inclusive mineral reserves; mineral resources that are not mineral reserves do not have demonstrated e conomic viability.
4) Mineral resources amenable for open pit extraction:
a) Resources have been reported below a topography with mining progress as of December 1, 2019. Stockpiled material is not considered in the mineral resource tabulation .
b) Resources are reported above a cut-off grade of 0.8 g/t gold and are constraint within a conceptual open pit shell.
c) Assumed pit slopes range from 3 to 49 degrees.
d) The assumed open pit mining costs are US$2.18/tonne, processing costs US$25.00/tonne, general and administrative costs of US$ 8.19/tonne processed.
5) Mineral resources amenable for underground extraction:
a) Resources are reported above a 2.5 g/t Au cut-off grade
b) Resources have been reported considering mining progress as of December 1, 2019.
c) Mineral resources for El Limon Deep have been reported below the reserve pit of the El Limón deposit
6) El Limon Open pit mineral resources have been reduced betw een the final reserve pit and the resource pit to account for mineral resources reported under El Limon Deep including a
conceptual crown pillar
7) Mineral resources are reported using a long-term metal prices of US$1,550/oz gold and US$21/oz silver.
8) Metallurgical recoveries are assumed to be 88% for gold and 32% for silver .
9) Mineral resources are classified in accordance with the CIM Standards.
10) Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade, and metal content.
As of December 31, 2019 Tonnes Au Ag Au Ag
(Mt) (g/t) (g/t) (koz) (koz)
Resources - Open Pit
El Limón (including El Limón Sur)
Measured 3.68 3.60 4.6 430 550
Indicated 13.11 2.80 5.0 1,180 2,120
Measured & Indicated 16.79 2.97 4.9 1,610 2,670
Inferred 1.96 1.87 5.4 120 340
Guajes
Measured 2.95 3.30 3.1 310 290
Indicated 5.11 2.76 2.2 450 350
Measured & Indicated 8.06 2.96 2.5 770 650
Inferred 0.46 1.93 2.7 30 40
Total Open Pit
Measured 6.63 3.47 3.9 740 840
Indicated 18.22 2.79 4.2 1,630 2,470
Measured & Indicated 24.85 2.97 4.1 2,370 3,310
Inferred 2.42 1.88 4.9 150 380
Resources - El Limón Guajes Underground
Sub-Sill
Measured 0.56 9.02 12.1 160 220
Indicated 0.98 7.05 8.6 220 270
Measured & Indicated 1.55 7.77 9.9 390 490
Inferred 0.91 6.17 4.7 180 140
ELD
Measured - - - - -
Indicated 1.33 6.26 6.6 270 280
Measured & Indicated 1.33 6.26 6.6 270 280
Inferred 1.54 5.40 7.4 270 370
Total El Limón Guajes Underground
Measured 0.56 9.02 12.1 160 220
Indicated 2.31 6.59 7.5 490 550
Measured & Indicated 2.87 7.07 8.4 650 770
Inferred 2.44 5.69 6.4 450 500
Resources - Open Pit & Underground
El Limón Guajes Complex
Measured 7.20 3.90 4.6 900 1,060
Indicated 20.53 3.21 4.6 2,120 3,030
Measured & Indicated 27.73 3.39 4.6 3,030 4,090
Inferred 4.86 3.79 5.6 590 880
Torex Gold Resources Inc. Page 7
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260-1500 Fax (416) 304-4000
www.torexgold.com
Table 4: Mineral Resource Estimate – Media Luna
Notes to accompany resource table:
1) The effective date of the estimate is December 31, 2019
2) Mineral resources are reported above a 2 g/t gold equivalent (AuEq) cut-off grade; AuEq = Au (g/t) + Cu % *(77.16/49.83) + Ag (g/t) * (0.64/49.83)
3) The assumed mining method is from underground
4) Mineral resources are reported using a long-term gold price of US$1,550/oz, silver price of US$20.00/oz, and copper price of US$3.50/lb
5) Costs per tonne of mineralized material (including mining, milling, and general and administrative ) used is US$75/t. Metallurgical recoveries average 85% for gold , 75% for silver and 89% for
copper
6) Mineral resources that are not mineral reserves do not have demonstrated economic viability
7) Mineral resources are classified in accordance with applicable CIM Standards
8) Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade, and containe d metal content
9) Mineral resources are reported as undiluted; grades are contained grades
10) The estimate was prepared by Dr. Lars Weiershäuser, P.Geo., an employee of the Company, who is a “Qualified Person” under NI 43-101
As of December 31, 2019 Tonnes AuEq AuEq Au Au Ag Ag Cu Cu
(Mt) (g/t) (Moz) (g/t) (Moz) (g/t) (Moz) (%) (Mlb)
Media Luna
Indicated 12.6 5.55 2.24 3.27 1.32 37.7 15.3 1.16 322
Inferred 33.5 4.23 4.56 2.49 2.68 23.6 25.5 0.93 686