TOREX ANNOUNCES MAIDEN SUB-SILL MINERAL RESERVES AND MINE PLAN
AND UPDATES MINERAL RESERVES AND RESOURCES FOR
THE ELG MINE COMPLEX
TORONTO, Ontario, January 16, 2018 – Torex Gold Resources Inc. (the “Company” or “Torex”) (TSX:TXG)
announces an updated mineral resource estimate and mineral reserves estimate for its ELG Mine Complex ("ELG"),
located in southwest Mexico. The announcement includes a maiden high grade, mineral reserve and mine plan for
the Sub -Sill. The estimates were prepared in accordance with National Instrument 43 -101 (“NI 43 -101”) and CIM
Definition Standards.
Sub-Sill Mine Plan From The Maiden Mineral Reserve:
The mineral resource remains open in three directions.
The In-fill drill program had a 100% success rate in upgrading Inferred mineral resource tonnes to Indicated
mineral resource tonnes.
The mineral reserve includes 71% of the Indicated mineral resource ounces at a 4.6 g/t cut-off-grade. Inferred
ounces are not included.
Estimated $86 million of before tax, free cash flow.
Estimated 29 months of production, delivers 480,000 tonnes at 11.65 g/t, containing 180,000 Au ounces:
o 8 months to get to the steady state production rate of 850 tonnes per day. 76,000 tonnes at 15.30
g/t Au while main ventilation and electrical infrastructure are being established.
o 11 months at 850 tpd producing 283,000 tonnes at 11.40 g/t Au.
o For the remaining 10 months, the current mineral reserve supports the mining of 120,000 tonnes,
at 9.93 g/t Au.
o Additional drilling is planned with the objective of upgrading inferred mineral resources, identifying
additional mineral resources, and extending the mine life.
Recoveries average 84.4% over the mine plan , 88.30% when Cu grade is less than 0.1%. 85.8% when Cu
grade is between 0.1%, and 1% and 80.1% when Cu grade is greater than 1%. The average expected Ag
recovery is 26.2% for the mine plan.
Total Cash Cost(1) of $479/Au Oz and All In Sustaining Cost (AISC)(1) of $512/Au Oz.
o Mining costs average $110/tonne over the mine plan. Processing and G&A are the same as for
the ELG open pits.
Total capital required is $23M, of which, $22M will be spent in the first year.
There are 6 mining areas in the Sub-Sill mine plan, that range in size from 40 – 100m length on strike, 40 –
200m on plunge, and 3.5 to 25m thick dipping at an average of 24°.
o The mining method is post pillar, cut and fill.
Fred Stanford, President and CEO of Torex stated : “This End-Of-Year (EOY) 2017, update of mineral reserves and
resources for the ELG Mine Complex is really all about the underground discoveries at the Sub -Sill. (The mineral
reserves and resources for the open pits remain largely unchanged except for depletion.) As anticipated, the Sub-Sill
provides excellent near-term cash flow, and is open in at least three directions, which provides for the potential to
extend that cash flow into the medium/long term.” He added: “The engineers have done an excellent job in designing
a projected low CAPEX operation to manage the complexities of the ore -body geometry. We look forward to
continuing the drill program as soon as possible , with the objective of adding and upg rading mineral resources, and
ultimately, to profitably extend the mine life.”
(1) This is a non-GAAP measure with no standard meaning under IFRS. Refer to “Non-IFRS Performance Measures” section
in the MD&A for 3rd Quarter 2017.
Torex Gold Resources Inc. Page 2
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
ELG Open Pits (ELG OP)
The mineral reserves and resources for the open pits remain largely unchanged except for depletion.
Mineral Resource Statement, End of Year 2017, El Limón and Guajes
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Contained
Au
(Moz)
Contained
Ag
(Moz)
El Limón (including El Limón Sur)
Measured 7.99 2.86 5.02 0.73 1.29
Indicated 20.77 2.87 5.07 1.92 3.38
Subtotal Measured and Indicated 28.76 2.87 5.05 2.65 4.67
Inferred 3.27 1.71 4.05 0.18 0.43
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Contained
Au
(Moz)
Contained
Ag
(Moz)
Guajes
Measured 2.19 2.53 2.28 0.18 0.16
Indicated 9.10 2.82 2.79 0.82 0.82
Subtotal Measured and Indicated 11.29 2.76 2.69 1.00 0.98
Inferred 0.45 1.49 2.60 0.02 0.04
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Contained
Au
(Moz)
Contained
Ag
(Moz)
El Limón and Guajes
Measured 10.18 2.78 4.43 0.91 1.45
Indicated 29.87 2.86 4.37 2.74 4.20
Total Measured and Indicated 40.05 2.84 4.39 3.65 5.65
Inferred 3.72 1.68 3.87 0.20 0.46
Notes to accompany El Limón and Guajes Mineral Resource Table:
1. The qualified person for the Guajes estimate is Mark Hertel, RM SME, an MPH employee. The estimate has an
effective date of December 31, 2017.
2. The qualified person for the El Limon estimate is Mark Hertel, RM SME, an MPH employee. The estimate has an
effective date of December 31, 2017. El Limon B Pit, where additional diamond drill information was available, was
estimated and has an effective date of December 31, 2017.
3. The qualified person for the El Limón Sur area within El Limón estimate is Mark Hertel, RM SME, an MPH employee.
The El Limón Sur area has an effective date of December 31, 2017.
4. Mineral Resources are reported above a 0.7 g/t Au cut-off grade.
5. Mineral Resources are reported as undiluted; grades are contained grades.
6. Mineral Resources are reported within a conceptual open pit shell.
7. Mineral Resources are reported using a long-term gold price of US$1380/oz, silver price of US$21.00/oz.
8. The metal prices used for the Mineral Resources estimates are based on long-term consensus prices. The assumed
mining method is open pit, mining costs used are US$2.18/tonne, processing costs US$19.09/tonne, general and
administrative US$8.80/tonne processed.
9. Recoveries gold 87% and silver 32%.
10. Assumed pit slopes range from 33 to 49 degrees.
11. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade,
and contained metal content.
12. Mineral Resources are reported using topography with mining progress as of December 31, 2017. Mining progress
applies to both El Limon and Guajes Mineral Resources. Stockpiled material is not included within the resource table
above.
13. El Limon Sub Sill Underground Mineral Resource has been excluded from the Open Pit Mineral Resource.
14. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Torex Gold Resources Inc. Page 3
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
ELG Open Pit - End of Year Reserves 2017
Reserve Category Tonnes Au Grade Ag Grade Contained Au Contained Ag
(Mt) (g/t) (g/t) (Moz) (Moz)
El Limon (including El
Limon Sur)
Proven 7.42 2.66 4.28 0.64 1.02
Probable 16.97 2.72 4.12 1.48 2.25
Sub-total Proven and
Probable 24.40 2.70 4.17 2.12 3.27
Guajes
Proven 2.24 2.24 1.82 0.16 0.13
Probable 9.25 2.54 2.43 0.76 0.72
Sub-total Proven and
Probable 11.49 2.48 2.31 0.92 0.85
Mined stockpiles
Proven 0.76 2.04 7.61 0.05 0.19
Total El Limon
Guajes
Proven 10.42 2.53 3.99 0.85 1.34
Probable 26.22 2.65 3.53 2.24 2.97
Total Proven and Probable 36.64 2.62 3.66 3.08 4.31
Notes to accompany Mineral Reserve table:
1. Mineral reserves are reported based on open pit mining within designed pits above in situ cut-off grades that are 0.80 g/t Au for
all ore types. Mineral reserves incorporate and estimate for dilution and mining losses. The cut-off grades and pit designs are
considered for the metal price of US$1,200/Oz and US$17/oz silver.
2. Mineral reserves are founded on, and include within, El Limon and Guajes Mineral resource. Effective dates of mineral
reserves is December 31, 2017 for the Guajes and El Limon deposits. For the El Limon Sur deposit the effective date is
December 31, 2017. Stockpiles were as of December 31, 2017.
3. The depletion that occurred during 2017 comes from mining carried out in Guajes and El Limon.
4. Mineral Reserves were developed in accordance with CIM (2014) guidelines.
5. Rounding may result in apparent summation differences between tonnes, grade, and contained metal content.
6. The qualified person for the mineral reserve estimate is Victor A. Barua, AusIMM member and a Torex employee.
Torex Gold Resources Inc. Page 4
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
ELG UG – Sub-Sill
High Grade Reserves Add to High Margin Production in the Short Term
Mineral Resource Statement, Sub-Sill Underground
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Cu Grade
(%)
Contained
Au
(oz)
Contained
Ag
(oz)
Sub Sill
Indicated 1.29 8.09 10.22 0.50 336,085 424,492
Inferred 0.65 9.09 10.79 0.60 191,087 226,919
Notes to accompany Sub Sill Underground Mineral Resource table:
1. The estimate was prepared by Mark. P. Hertel, RM SME, an employee of MPH Consulting, who is a “Qualified Person”
under NI 43-101.
2. The estimate has an effective date of December 31, 2017.
3. Mineral Resources are classified in accordance with the 2014 CIM Definition Standards for Mineral Resources and
Mineral Reserves and the 2003 CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.
4. Mineral Resources are reported above a 2.5 g/t Au cut-off grade.
5. Mineral Resources are reported as undiluted; grades are contained grades.
6. Sub Sill Resources contained within the conceptual pit shell have been removed from the El Limón Open Pit Resources.
7. Mineral Resources are reported using a long-term gold price of US$1380/oz, and silver price of US$21.00/oz.
8. The assumed mining method is from underground.
9. Recoveries gold 87% and silver 32%.
10. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade, and
contained metal content.
11. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Set out below is the table indicating the sensitivity to cut-off grade that was used for the Sub -Sill
Indicated Mineral Resource, with the base case highlighted.
Cutoff Au
(g/t)
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Cu Grade
(%)
Contained
Au
(oz)
Contained
Ag
(oz)
2.00 1.58 7.03 9.34 0.45 356,746 473,405
2.50 1.29 8.09 10.22 0.50 336,085 424,492
5.00 0.47 16.16 15.21 0.75 245,590 231,144
10.00 0.31 21.07 18.66 0.92 211,867 187,628
Notes to accompany the table:
1. The mineral resource estimates set out above have been prepared by Mr. Mark P. Hertel, who is a "Qualified Person" under NI 43-101.
Torex Gold Resources Inc. Page 5
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
Mineral Reserve Statement, Sub-Sill Underground
Tonnes
(Mt)
Au Grade
(g/t)
Ag Grade
(g/t)
Cu Grade
(%)
Contained
Au
(oz)
Contained
Ag
(oz)
Sub Sill
Proven - - - - - -
Probable 0.48 11.65 11.65 0.60 180,000 180,000
Notes to accompany Sub Sill Underground Mineral Reserve table:
1. Mineral reserves are based on mechanized cut and fill mining within designed cut shapes above in-situ cut-off
grades that vary from 4.37g/t Au to 4.84g/t Au accounting for the affect of copper content on process plant
recoveries.
2. Mineral reserves incorporate estimates for dilution and mining losses.
3. Process plant recoveries for the Sub-Sill range from 80.1% to 88.3% for Au and 14.1% to 67.3% for Ag.
4. The Mine plan was developed using metal prices of US$1,200/oz. Au and US$17/oz. Ag.
5. Mineral reserves are founded on and include within, Sub-Sill measured and indicated resource. Effective date of
resources is October 13, 2017.
6. Mineral reserves have an effective date of December 31, 2017.
7. Mineral reserves were developed in accordance with CIM (2014) guidelines.
8. Rounding may result in apparent summation differences between tonnes, grades and contained metal content.
9. The qualified person for the mineral reserves estimate is Clifford Lafleur, Professional Engineer of Ontario, Canada
and a Torex employee.
ELG U/G Sub-Sill Mine Plan
A post pillar mechanized cut and fill mine plan has been designed using the updated Mineral Resource Estimation
and geological model resulting in a high grade, Probable Mineral Reserve, of 0.48 million tonnes at 11. 65 g/t Au
for 180,000 gold ounces at an average in situ cut-off grade 4.60 g/t Au cut-off grade.
Three Cut-Off Grades were calculated to account for the affect of Cu grades on recoveries and used to guide the
design of cut and fill production shapes . There are 6 mining zones in the mine plan which range in size from 40 –
100m length on strike, 40 – 200m on plunge and 3.5 to 25m thick dipping at an average 24°. The mine plan converts
71% of Indicated Mineral Resource Au ounces to Probable Mineral Reserve Au ounces.
Development and infrastructure construction were designed to provide access to the production areas, main
ventilation via a second portal and to service the mining operations. The production, development and infrastructure
construction were costed and scheduled in a financial model.
The mine plan is expected to deliver 480,000 tonnes of high grade (11.65 gpt Au) ore containing 180,000 Au ounces
to the ELG Processing Plant over a 29 -month period. The Mine is expected to ramp up over an 8-month period with
estimated production of 76,000 tonnes at 15.30 g/t Au while main ventilation and electrical infrastructure are being
established. Steady state production is expected to continue for 11 months with estimated production of 283,000
tonnes (850 tpd) at 11.40 g/t Au, the main constraint being backfilling rate. For the remaining 10 months , the mine
plan is expected to deliver 120,000 tonnes (400 tpd) at 9.93 g/t Au.
Sub-Sill ore is expected to perform well in the existing Plant with expected Au recoveries ranging from 88.30% when
Cu grade is less than 0.1%, 85.8% when Cu grade is between 0.1% and 1% and 80.1% when Cu grade is greater
than 1%. The average expected reco very is 84.4% for the mine plan. The expected recoveries for Ag range from
67.3% when Cu grade is less than 0.1%, 37.1% when Cu grade is between 0.1% and 1% and 14.1% when Cu
grades are greater than 1%. The average expected Ag recovery is 26.2% for the mine plan.
During steady state production (approximately 850 tpd), expected operating costs average $108.35/tonne, including
$79.97/tonne mining cost, $ 19.33/tonne processing and $9.05/tonne in general administration (G&A). Over the 29 -
month mine plan, operating costs are expected to average $140.86 /tonne.
Torex Gold Resources Inc. Page 6
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
Total capital required to execute the mine plan is estimated to be $23M, of which, $22M will be spent in the first year.
Of the total capital spend, $9.5M is needed for lateral development.
Assuming the production, costs and plant recoveries listed above, the mine plan is expected to generate $86M in free
cash flow (before tax) with a Cash Cost of $479/Au Oz and All In Sustaining Cost (AISC) of $512/Au Oz.
Sub-Sill Geology
The Sub -Sill deposit occurs at the south end of the El Limon deposit in the Mesozoic carbonate -rich Morelos
Platform, which has been intruded by Paleocene granodiorite stocks, sills and dikes. Skarn-hosted gold
mineralization is developed along the contacts of the intr usive rocks and the enclosing carbonate -rich sedimentary
rocks of the Cuautla and Morelos formations . Gold mineralization at El Limon open pit is hosted in skarn developed
immediately above a larg e granodiorite sill. At the Sub -Sill area, multiple skarn zo nes have been recognized
underneath the El Limon Sill, developed along the contacts between marbles of the Morelos formation and multiple
granodiorite sills that are interpreted as late stage porphyritic intrusions that emanate from the main body of
granodiorite. The best developed skarn zones at the Sub-Sill area, strike NE-SW and dip between 35° and 45° to the
northwest. They host multiple horizons with high grade gold mineralization that vary in strike length from
approximately 50 meters up to 200 meters, with apparent widths varying from 2 meters to 36 meters. The trend of the
overall skarn body in the Sub -Sill area is N-S to NE-SW and appears to connect to previously recognized skarn and
gold mineralization at the Limon Sur deposit 200 meters to the SW.
Mineralization at the Sub-Sill deposit is primarily gold, strongly associated with bismuth and variable contents of silver
and copper. Gold occurs in variably sulfidized pyrrhotite enriched skarn, while silver and copper mineralization is
primarily de termined by the degree of sulfidation of th e host skarn. Mineralization is associated with retrograde
alteration characterized by amphibole, calcite and quartz, with lessor amounts of chlorite ± epidote, affecting
pyroxene-garnet exoskarn and granodiorite -related endoskarn. Locally mineralization occurs in narrow lenses of
massive sulfides.
Mineral Resource Estimate Methodology
Within the Sub -Sill project 85 drill holes ( 16,826 meters) support the mineral resource estimate. Assays were
composited into 2.5 meter lengths for estimation into 2.5 meter cubic blocks. MineSight® a commercially -available
geologic modeling and mine planning software package, was used to produce a three -dimensional block model.
Specific gravity (SG) was assigned by rock type from 107 wax immersion density determinations. Gold, silver an d
copper grades, within the Sub -Sill resource model, were estimated using grade domains, defined from Probability
Assigned Constrained Kriging (PACK) and lithologic codes. Ordinary kriging was used to interpolate grade. Mineral
Resources take into account geologic, mining, and processing constraints. Mineral Resources are classified in
accordance with the 2014 CIM Definit ion Standards for Mineral Resources and Mineral Reserves and the 2003 CIM
Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines.
Mineral Reserve Estimate Methodology
The estimated underground Sub-Sill Mineral Reserves have been based on a mine design including the development
and infrastructure construction required to extract the Indicated portion of the M ineral Resource Estimate using the
Mechanized Cut and Fill (MCAF) mining method. The three -dimensional block model created for the Mineral
Resource Estimate was taken into Deswik® software suite , a commercially -available mine planning software
package, and used as the base of an MCAF mine plan. A cost model was built to determine 3 Break Even Cut -Off
Grades (BECOG) for varying m ill recoveries dependent on Cu content . The BECOG averages 4.60 g/t Au. The
mine plan physicals such as SG, Gold, Silver and copper grades were estimated by applying the mine design shapes
against the block model, unplanned dilution and mine recovery wer e also applied. Mineral Reserves take into
account geologic, mining and processing constraints. Mineral Reserves are classified in accordance with the 2014
CIM Definition Standards for Mineral Resources and Mineral Reserves and the 2003 CIM Estimation of Mineral
Resources and Mineral Reserves Best Practice Guidelines.
Torex Gold Resources Inc. Page 7
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
2017 In-Fill and Step-Out Drill Program Update
The in-fill and step out drill program started in Q2/17 is complete. This program has succeeded in upgrading inferred
resources, testing the extents and prospect areas to the north, south, west, east and at depth of the known
resources.
The in -fill program has completed 4 5 of 47 holes (9 6%) of the diamond drill holes that were planned with the
objective of upgrading 1 million Inferred t onnes to the Indicated confidence category. The 4 5 holes upgraded
950,000 Inferred tonnes to the Indicated category, or 95% of the target, with 9 6% of the planned holes. This
represents a 100% conversion ratio for Inferred tonnes to the Indicated confide nce category, and delivered a 269%
increase in the number of Indicated tonnes.
The step-out program has completed 39 of 47 holes achieving 11, 896 meters of 13,105m planned o n a 70m x 70m
drill spacing. The purpose of this program is to test the prospective areas to the north, south, west and east of t he
known resource.
QA/QC and Qualified Persons
At the Morelos Gold P roject, all of the El Limon Sub -Sill target analytical work is performed by SGS de Mexico S.A.
de C.V. (“SGS”) in Durango, Mexico and at SGS Mineral Services in Vancouver, British Columbia, Canada and ALS
Chemex de Mexico S.A. de C.V.
Sample preparation is done at SGS sample preparation laboratory in Durango, Mexico. The gold analyses (fire assay
with an atomic absorption or gravimetric finish) are completed at SGS analytical laboratory in Durango, Mexico and
multi-element geochemical analyses are Copper Sequential Leaching are completed at their analytical facilities in
Vancouver, British Columbia, Canada. Check assays samples are analyzed at ALS Chemex Vancouver, BC,
Canada. SGS and ALS Chemex are independent of the Company.
The Company has a Quality Assurance/Quality Control (“QA/QC”) program in place that includes 5% of each of the
certified reference materials, blanks and field duplicates. 10% of pulp samples are analyzed at a second laboratory
as part of the QA/QC program to ensure the batch to batch relative bias remains constant and that absolute accuracy
at anomalous to near cut -off grades is measured and acceptable. The QA/QC program as designed has been
approved by Bureau Veritas and is currently overseen by Carlo Nasi, Chief Mine Geologist for the Morelos Gold
Project.
The scientific and technical data contained in this news release pertaining to the Morelos Project has been reviewed
and approved by Mr. Mark P. Hertel, RM SME, who is a Qualified Person under NI 43-101. Mr. Hertel is a Registered
Member of the Society for Min ing, Metallurgy & Exploration , has experience relevant to the style of mineralization
under consideration and is an independent consultant, employed by MPH Consulting. Mr. Hertel has verified the data
disclosed, including sampling, analytical, and test dat a underlying the drill results and he consents to the inclusion in
this release of said data in the form and context in which it appears.
The scientific and technical data contained in this news release pertaining to the Sub -Sill Deposit Mineral Reserves
has been reviewed and approved by Mr. Clifford Lafleur, P.Eng who is a Qualified Person under NI 43 -101. Mr.
Lafleur is a Registered Member of the Professional Engineers of Ontario, has worked the majority of his career in
underground hard rock mining in Canada and Mexico in progressively senior engin eering roles with relevant
experience in mine design and planning, mining economic viability assessment and mining studies.
The scientific and technical data contained in this news release pertaining to the ELG OP Mineral Reserves has been
reviewed and approved by Mr. Dawson Proudfoot, P.Eng who is the Vice President of Engineering at the Company
and who is a Qualified Person under NI 43-101.
Torex Gold Resources Inc. Page 8
Corporate Office: 130 King St. West, Suite 740, Toronto, ON M5X 2A2, Canada – Tel. (647) 260 1500 Fax (416) 304 4000
www.torexgold.com
Naming Convention:
ELG Open Pits (ELG OP) refers to:
o El Limon Pit,
o Guajes Pit, and
o El Limon Sur Pit.
ELG Underground (ELG UG) refers to the underground mining zones in proximity to ELG OP, including:
o Sub-Sill,
o El Limon Deep (ELD).
ELG Mine Complex (ELG) refer s to all of ELG OP, ELG UG, and the associated process ing facilities &
infrastructure.
Media Luna Project (Not considered as part of the ELG Mine Complex).
Morelos Property refers to all of the above.
About Torex
Torex is an emerging intermediate gold producer based in Canada, engaged in the exploration, development and
operation of its 100% owned Morelos Gold Property, an area of 29,000 hectares in the highly prospective Guerrero
Gold Belt located 180 kilometers southwest of Mexico City. Within this property, Torex has the El Limón Guajes Mine,
which announced commerc ial production in March of 2016; the Sub -Sill Underground Project currently under
development; and the Media Luna Project, which is in an early stage of development and for which the Company
issued a preliminary economic assessment (PEA) in 2015. The property remains 75% unexplored.
Additional information on the El Limon deposit and analytical labs is available in the Company’s most recent annual
information form filed on SEDAR at www.sedar.com and the Company’s website at www.torexgold.com.
For further information, please contact:
TOREX GOLD RESOURCES INC.
Fred Stanford Gabriela Sanchez
President and CEO Vice President Investor Relations
Tel. (647) 260-1502 Tel. (647) 260-1503
Email: [email protected] Email: [email protected]
CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS
This press release contains “forward-looking statements” and “forward-looking information” within the meaning of app licable
Canadian securities legislation. Notwithstanding the Company’s efforts, there can be no guarantee that the Company will not
face delays or disruptions , including delays and disruption s connected to blockaders illegally blocking access to the ELG Mi ne
Complex. Forward-looking information includes, without limitation, information with respect to mineral resource and mineral
reserve estimates, mine design, the estimated increase in the mineral resource of the Sub -Sill deposit, the ability to realize t he
estimated mineral resources and mineral reserves, the parameters and assumptions underlying the mineral resource and
mineral reserve estimates and the financial analysis, expected ramp up and steady state production, the expectation of
continuing the dr ill program, with the objective s of adding and upgrading resource and profitably extending the mine life .
Generally, forward -looking information can be identified by the use of terminology such as “plans”, “expects”, “estimates”,
“intends”, “anticipates”, “believes” or variations of such words, or statements that certain actions, events or results “may”, “could”,
“would”, “might”, “will be taken”, “occur” or “be achieved”. Forward -looking information is subject to known and unknown risks,