Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TWR.V ·

Tower Resources to Drill on the Nechako Property

Exploration Programs

Tower Resources to Drill on the Nechako Property 

Vancouver, B.C. – June 18, 2019 ‐ Tower Resources Ltd. (“Tower” or the “Company”) (TSXV: TWR; OTCQB: 

T W R F F )  T o w e r  R e s o u r c e s  i s  p l e a s e d  t o  r e p o r t  t h a t  t h e  r e c e n t l y  announced  (see  April  29,  2019  press 

release) Phase III reverse cir culation (RC) drilling program on  the Company’s Nechako property south of 

Vanderhoof, BC was completed successfully and achieved its obje ctive of narrowing the location of the 

mineralized April Trend in preparation for an initial diamond drill test. 

The mineralized April Trend, which was first recognized in the  Phase II RC drilling program, is inferred to 

be the bedrock source of the major, 1.5 km wide x 3 km long Au‐ Ag‐As‐Zn‐Pb glacial dispersal train (Fig. 

1) that was outlined in the Phase I and II programs (see February 14, 2019 press release). It is stratabound 

(Fig. 2), occurring at or near the contact between a tuff‐siltstone‐mudstone‐limestone horizon to the west 

and  structurally  overlying  basalts  to  the  east  (Fig.  3).  Both  the  stratigrapic  setting  and  Au‐Ag‐As‐Zn‐Pb 

association are suggestive of a volcanogenic, Eskay Creek‐type deposit model. 

Joe Dhami, CEO of Tower, commented:  “We have identified a type of mineralization that is new to the  

Nechako property and is evidently of a significant scale of but  only through the drill bit will we learn its 

potential. Having spent the last two years methodically trackin g the Nechako gold dispersal train 3 km to 

its bedrock source, we are eager to begin diamond drilling.”  

Program Summary 

The Phase III RC holes were drilled along the northernmost 500  m of the 1500 m long mineralized trend. 

Eleven  holes,  Nos.  NRC19‐52  to  62  (Figs.  1,  2),  were  completed  in  the  three  budgeted  drill  shifts, 

significantly exceeding the expected six to eight holes. The ho les were sited 100‐200 m apart and drilled 

vertically.  Both  the  Upper  and  Lower  (where  preserved)  Till  hor izons  and  underlying  bedrock  were 

sampled continuously over 1.5‐2 m intervals (Fig. 3).    

Till Results 

Holes 52 and 60 intersected a key extension (Fig. 1) of the wes ternmost of the two preserved segments 

of the Lower Till horizon that host remnants of the once‐contin uous, east‐northeast trending dispersal 

train. The Au‐Ag‐As‐Zn‐Pb analyses obtained from the heavy mine ral concentrates (HMCs) of the Lower 

Till samples from these holes and from nearby Phase II Hole 45 are the highest encountered to date. The 

average HMC Au values for all of samples collected from the Lower Till section (up to 8 samples per hole) 

rise progressively westward – i.e. glacially up‐ice – from 1‐1.5 g/t 2‐3 km down‐ice in the Phase I drill area 

to 2.1‐2.4 g/t in Holes 45 and 60 (Fig. 3, Table 1). They peak at 4 g/t in Hole 52 immediately down‐ice from 

the April Trend and then drop precipitously to less than 0.5 g/ t 150 m further up‐ice in Hole 42 (Fig. 3), 

providing a sharp cut‐off to the dispersal train.  

Bedrock Geology 

The bedrock intercepts from the  new drill holes confirm that th e source of the Nechako dispersal train 

lies within the mixed tuff‐siltstone‐mudstone‐limestone unit on the west side of the April Trend but show 

that the Trend has a slightly more easterly strike (Fig. 2) than that previously projected (see April 29, 2019 

press  release).  The  tuff,  siltstone  and  mudstone  are  extensively  fractured  to  brecciated,  have  been 

recrystallized  by  thermal  metamorphism,  are  sulphidized  and  contain  abundant  biotite  indicating  that 

they have undergone pervasive potassic alteration. The limeston e member, which was intersected only 

in  Hole  62,  has  been  recrystallized  and  its  contact  with  the  siltstone  is  a  skarn  comprised  of  epidote, 

grossular garnet and calcic feldspar. In contrast, both the basalt along the east side of the April Trend and 

an ignimbrite horizon further east are unmetamorphosed, undeformed and unaltered. 

The  diamond  drill  holes  will  be  collared  over  the  basalt  and  drilled  to  the  southwest  across  the  tuff‐

sediment unit as depicted in Figure 3.  

Significant Mineralization 

While the Nechako dispersal train is clearly derived from the metamorphosed and hydrothermally altered 

tuff‐siltstone‐mudstone‐limestone  horizon,  the  only  sulphides  encountered  in  the  new  drill  holes  that 

intersected  this  horizon  are  py rrhotite  and  pyrite,  mainly  in  H oles  53  and  62  where  they  reach  a 

concentration  of  10‐15%  with  pyrrhotite  dominant.  Arsenopyrite,   sphalerite  and  galena  –  the 

c h a r a c t e r i s t i c  m i n e r a l s  o f  t h e  N e c h a k o d i s p e r s a l  t r a i n  –  a r e  c onspicuously  absent  from  the  bedrock  in 

these holes, suggesting that the thickness of the targeted Au‐A g‐As‐Zn‐Pb zone is considerably less than 

the 100‐200 m distance between holes. However, given the consid erable thickness of the dispersal train 

(Fig. 3), its high metal content and its persistence for 3 km d own‐ice, the grade x thickness value of the 

source mineralization is inferred to be significant. 

National Instrument 43‐101 Disclosure  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Mr.  Stuart  Averill, 

Chairman of ODM, a Director of the Company and a Qualified Pers on as defined by National Instrument 

43‐101. 

About Tower Resources 

Tower is a Canadian based mineral exploration company focused o n the discovery and advancement of 

economic mineral projects in the Americas. The Company’s key ex ploration assets are the Rabbit North 

copper‐gold  porphyry  project  located  between  the  New  Afton  and Highland  Valley  Copper  mines,  the 

Nechako gold project near New Gold’s Blackwater project and the More Creek and Voigtberg gold projects 

in the Golden Triangle area of Northern British Columbia. 

On behalf of the Board of Directors 

Tower Resources Ltd. 

Joe Dhami, President and CEO 

(604) 558‐2565 

www.towerresources.ca 

Reader Advisory 

This  news  release  may  contain  statements  which  constitute  “forward‐looking  information”,  including 

statements regarding the plans, intentions, beliefs and current expectations of the Company, its directors, 

or its officers with respect to the future business activities  of the Company. The words “may”, “would”, 

“could”, “will”, “intend”, “plan” , “anticipate”, “believe”, “es timate”, “expect” and similar expressions, as 

they relate to the Company, or its management, are intended to identify such forward‐looking statements. 

Investors are cautioned that any such forward‐looking statement s are not guarantees of future business 

activities and involve risks and uncertainties, and that the Company’s future business activities may differ 

materially from those in the forward‐looking statements as a re sult of various factors, including, but not 

limited to, fluctuations in market prices, successes of the operations of the Company, continued availability 

of capital and financing and general economic, market or business conditions. There can be no assurances 

that  such  information  will  prove  accurate  and,  therefore,  reade rs  are  advised  to  rely  on  their  own 

evaluation of such uncertainties. The Company does not assume a ny obligation to update any forward‐

looking information except as required under the applicable securities laws. 

Neither TSX Venture Exchange nor i ts Regulation Services Provid er (as that term is defined in policies of 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.