Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TWR.V ·

Tower Resources Reports Nechako Drill Results

Drill Results

Tower Resources Reports Nechako Drill Results 

Vancouver, B.C. – August 23, 2018 ‐  Tower Resources Ltd. (“ Tower” or the “ Company”) (TSXV: 

TWR; OTCQB: TWRFF) is pleased to provide an update at the Compa ny’s Nechako gold project in 

British Columbia.  The Nechako gold project is is located appro ximately 30 kilometres northeast 

of New Gold’s Blackwater development project in the Nechako Pla teau Region of central British 

Columbia.  The  project  is  road  accessible  and  comprises  10  miner al  tenures  totaling  2,975 

hectares. Exploration work at the project has identified a number of targets including epithermal 

gold and silver minerlaization and also porphyry copper and gold mineralization.   

The Company recently completed an initial diamond drill program at Nechako comprising 5 holes 

for a total of 751 metres to fo llow up on strong gold in till a nomalies identified in the 2017 RC 

program  (Press  Release  May  15, 2018).    Results  from  this  program  are  highlighted  in  Table  1 

below.  The  intense  alteration  encountered  in  Tower’s  2018  diamond  dril ling  program 

demonstrates that the Nechako property continues to show potential for discovery of large scale 

gold and  copper  mineralization.   A second round of RC drilling and  till sampling is planned fo r 

Nechko prior to initiating a the next  round of diamond drilling.    

Table 1: Assay Results: 

DDH  From (m)  To (m)  Width* (m)  Cu (%)  Au (g/t) 

NDH‐18‐004  72  82  10.0  0.22  0.12 

and  156  170  14.0  0.15  0.11 

Including  166  168  2.0  0.32  0.36 

NDH‐18‐001  No Significant Assays 

NDH‐18‐002  No Significant Assays 

NDH‐18‐003  No Significant Assays 

NDH‐18‐005  Drill Hole Did Not Reach Target 

*Width refers to drill hole intercept and may not represent the true width of the mineralization. 

NDH‐18‐004 was drilled further up‐ice (1300 metres) from the strongest gold in till anomaly seen 

in RC drilling. This hole is characterized by strong to intense ly altered dacitic volcanic rocks with 

up to 5% pyrite with trace associated basemetal sulphides (chalcopyrite, galena and sphalerite). 

NDH‐18‐001,  NDH‐18‐002  and  NDH‐18‐003  drilled  approximately  500   metres  ‘up‐ice’  of  the 

strongest  gold  in  till  anomaly  identified  in  RC  drilling.  These  drill  holes  intersected  relatively 

unaltered sequences of dacitic flows and interbedded fine sedim entary horizons. No significant 

mineralization was encountered in these drill holes.  

NDH‐18‐005  was  drilled  approximately  100  metres  from  NDH‐17‐004 b u t  f a i l e d  t o  p e n e t r a t e  

strongly silicified and fractured rock encountered immediately below casing.  

Methods and Qualified Person 

Drill  core  samples  (generally  2‐metre  sample  length)  were  prepared  at  Tower’s  core  logging 

facility located on site at the Nechako project and shipped to Activation Laboratories Ltd. (Actlabs) 

ISO 17025 accredited geochemistry lab in Kamloops, BC. Samples  were analyzed for gold by fire 

assay  and  ICP‐OES  and  for  37  further  elements,  including  copper,  using  a  four‐acid,  near‐total 

digestion.  QA/QC  samples  including  blanks,  standards  and  duplic ate  samples  were  inserted 

regularly into the sample sequence at a ratio of approximately 1:15.  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Darrell  Hyde, 

P.Geo.,  Exploration  Manager  for  the  Company  and  Qualified  Perso n  a s  d e f i n e d  b y  N a t i o n a l  

Instrument 43‐101. 

About Tower Resources 

Tower  is  a  Canadian  based  mineral  exploration  company  focused  o n  the  discovery  and 

a d v a n c e m e n t  o f  e c o n o m i c  m i n e r a l  p r o j e c t s  i n  t h e  A m e r i c a s .   T h e  Company’s  key  exploration 

assets are the Rabbit North copper‐gold porphyry project locate d between the New Afton and 

Highland Valley Copper mines, the Nechako gold project near New Gold’s Blackwater project and 

the  More  Creek  and  Voigtberg  gold  projects  in  the  Golden  Triangle  area  of  Northern  British 

Columbia. 

On behalf of the Board of Directors,  

Tower Resources Ltd. 

Garett Macdonald, President, CEO & Director 

(604) 558‐2565  

[email protected]  

www.towerresources.ca  

Reader Advisory 

This  news  release  may  contain  statements  which  constitute  “forw ard‐looking  information”,  including 

statements regarding the plans, intentions, beliefs and current  expectations of the Company, its directors, 

o r  i t s  o f f i c e r s  w i t h  r e s p e c t  t o  t h e  f u t u r e  b u s i n e s s  a c t i v i t i e s  of  the  Company.  The  words  “may”,  “would”, 

“could”,  “will”,  “intend”,  “plan”,  “anticipate”,  “believe”,  “est i m a t e ” ,  “ e x p e c t ”  a n d  s i m i l a r  e x p r e s s i o n s ,  a s  

they relate to the Company, or its management, are intended to identify such forward‐looking statements. 

Investors are cautioned that any such forward‐looking statement s are not guarantees of future business 

activities and involve risks an d uncertainties, and that the Co mpany’s future business activities may differ 

materially from those in the forward‐looking statements as a re sult of various factors, including, but not 

limited to, fluctuations in market prices, successes of the operations of the Company, continued availability 

of capital and financing and general economic, market or busine ss conditions. There can be no assurances 

that such information will prove accurate and, therefore, readers are advised to rely on their own evaluation 

of  such  uncertainties.  The  Company  does  not  assume  any  obligati on  to  update  any  forward‐looking 

information except as required under the applicable securities laws. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the 

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.