Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TWR.V ·

Tower Resources Receives Multi-Year Exploration Permit for Nechako Gold Project

Permits & Approvals

Septe

Vanc

annou

the B

Nech

Unde

to com

from

perm

kilom

skid-m

advan

The N

Nech

locate

devel

8.2 m

webs

epith

miner

kilom

press

The t

Chad

by Na

Abou

Towe

comp

ember 12, 2

Tow

couver, B. C

unce that it

B.C. governm

hako Gold Pr

er this new N

mplete rever

30 drill pa d

mission to com

meters of e x

mounted di

ncement of t

Nechako Go

hako Platea u

ed approxi m

lopment proj

million oun c

ite). The N

ermal gold

ralization.

metres wide w

release Janu

technical c o

dwick, P.Geo

ational Instru

ut Tower Re

er Resourc e

pany focuse

2017

wer Resour

C. - Tower R

has received

ment authoriz

roject. The C

Notice of W

rse circulatio

d locations c

mplete 10 ki

xploration t r

amond dril l

the property

old property

u R e g i o n of

mately 30

ject. Blackw

ces of gold w

Nechako G o

and silve r

A promine n

was defined

uary 18, 201

ontent of th i

o., Exploratio

ument 43-10

esources

es Ltd. (T W

d on the d

NEW

rces Receive

for Necha

Resources L

d a Multi-Ye

zing a multi

Company pl

ork Mines A

on drilling fr

covering all

ilometers of

rail constru c

ling. This n

through exte

comprises 1

f central Br i

kilometres

water contain

with 60.8 m

old propert y

r mineraliz

nt gold gra i

on the prop

7).

is news rel e

on Manager

01.

WR.V) is a

discovery a n

WS RELEAS

es Multi-Yea

ako Gold Pr

Ltd., (“Tow e

ear Area Bas

-disciplinary

ans to comm

Act permit T

from 100 dri

key target a

f upgrades to

ction for tr a

new permit

ensive explo

10 mineral te

itish Colum b

northeast

ns a proven a

million ounc

y i s d e e me

ation and

in anomaly

perty by syst

ease has be e

for the com

Vancouver

nd advance m

TWR: T

SE

ar Explorat

roject

er or the “ C

sed (MYAB

y five-year e

mence drillin

Tower has pe

ll pad locati

areas on the

o existing ac

ack-mounted

authorizatio

oration over

enures totall

bia. The ro a

of New G

and probabl

es of silver

ed prospect i

porphyry-re

at least 3.

ematic till sa

en reviewe d

mpany and qu

r based ju n

ment of ec o

TSX Ventur

tion Permit

Company”)

B) Mines Act

exploration p

ng in mid-Oc

ermission ov

ions and diam

property. To

ccess, and an

d r e v e r s e c ir

on allows f o

a five-year t

ling 5,940 h

ad accessib l

Gold Inc.' s

e total mine

(source: N e

ive for Bl a

elated c o p p

5 kilometr e

ampling in l

d and appro v

ualified pers

nior minera

onomic min

re Exchang

is pleased t

t permit from

program at it

ctober.

ver five year

mond drillin

ower also h a

n additional

rculation a n

or significa n

time frame.

hectares in th

le property

s Blackwat e

eral reserve o

ew Gol d I nc

ackwater-typ

er and go l

es long by

late 2016 (se

ved by Pao l

son as define

l explorati o

eral projec t

ge

to

m

ts

rs

ng

as

5

nd

nt

he

is

er

of

c.

pe

ld

2

ee

la

ed

on

ts,

primarily in British Columbia. The company’s key exploration as sets are Rabbit North,

Nechako Gold and More Creek.

Tower Resources Ltd.

Mark Vanry - Director, CEO & President

(604) 558-2565

[email protected]

www.towerresources.ca

Neither the TSX Venture Exchange nor the Invest ment Industry Regulatory Organization of

Canada accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statement Caution

This news release contains certain “forward-looking statements”, as defined in the United States

Private Securities Litigation Reform Act of 1995, and within the meaning of Canadian securities

legislation. The Company cautions that forwar d-looking statements are based on the beliefs,

estimates and opinions of the Company’s management on the date the statements are made and

they involve a number of risks and uncertainties. Consequently, there can be no assurances that

such statements will prove to be accurate and actual results and future events could differ

materially from those anticipated in such st atements. The Company undertakes no obligation to

update these forward-looking statements if manageme nt’s beliefs, estimates or opinions, or other

factors, should change, except as required by la w. There are numerous risks and uncertainties

that could cause actual results and Tower's plans and objectives to differ materially from those

expressed in the forward-looking information. Th e reader is urged to refer to the Company's

public disclosure which is available through the Canadian Securities Admi nistrators' System for

Electronic Document Analysis and Retrieval (SEDAR) at www.sedar.com for a more complete

discussion of such risk factors and their potential effects.