Tower Resources Provides Corporate Update on 2017 Exploration Activities and 2018 Objectives
January
Tow
VANCOU
update o
2017 Tow
North, N
Tower a d
agreeme
Triangle
Rabbit N
The foc u
property
complete
definition
favourab
property
Developm
historic c
be comp
areas be
2018.
Nechako
Following
(IP) surve
results, T
y 18, 2018
wer Resou
UVER B.C. --
on the Com p
wer executed
Nechako Go l
dded a fou r
nt with Gol d
in Northwes
North
us of Tower ’
located in
ed a 3238- m
n at the W
le geology
to date fr o
ment of furt
core, geophy
pleted in sp r
low till cov e
o Gold
g up on hig
ey complete
Tower compl
urces Prov
Act
- Tower Reso
pany’s 201 7
d three suc c
ld and Mor e
rth mineral
dcorp Inc o n
stern BC (see
’s 2017 fiel d
the resour c
metre dia m
Western Ma g
and geop h
om drill-hol
her drill targ
ysical inversi
ring of 201 8
er within an
hly encoura
d on the pr o
eted 38 Rev
NEW
vides Cor
tivities an
ources Ltd. (
7 ex pl o ra t ion
cessful explo
e C r e e k e xp
property t o
n the Voigt b
e Tower Pres
d s e a s o n wa
ce-rich regi o
mond drill c a
gnetite and
ysics, the 2
e RN17-01 5
gets on the p
ons and sub
8. Diamond d
d outboard
ging results
operty in Ju
verse Circulat
WS RELEAS
rporate U
nd 2018 O
("Tower" or t
n activities a
oration prog
ploration pr o
o t h e p r o j ec
berg gold-co
ss Release, D
as work at
on of south -
ampaign f o
Chrysocoll
2017 drill p r
5, including
property thr
bsequent sha
drill testing
of historic a
s from the g
ne 2017 and
tion (RC) dri
TWR
E
Update on
Objectives
the "Compa
and it s 2018
grams focuse
ojects in B r
ct portfolio
opper projec
December 19
our flagshi p
-central Brit i
ocused on s
a Zones. T
rogram rep o
247m of 0
rough geolo
allow Revers
of existing
ally explore d
ground geop
d the signific
ll holes on t
R: TSX Vent
n 2017 Ex
s
any") is pleas
8 o bj ect i ves.
ed on the C
ritish Colum
by enterin g
ct in the he a
9, 2017).
p R a b b i t No
ish Columb i
step-out dr i
Targeting u n
orted the b
0.51% Cu a
gical mappi
se Circulation
and newly d
d a r e a s i s pl
physical Indu
cant 2016 g
the property
ture Excha
xploration
sed to provid
During cal e
Company’s R
bia. Additi o
g i n t o a n o
art of the G o
orth copper
ia . T h e C om
illing and t
ntested are a
best interce p
and 0.34g/ t
ng, re-loggi
n (RC) drillin
developed t
lanned for f
uced Polariz
old-in-till sa
y in fall of 20
ange
n
de an
endar
Rabbit
onally,
ption
olden
-gold
mpany
target
as of
pt on
t A u .
ng of
g will
target
fall of
zation
ample
017 to
sample till and test bedrock below till cover in priority targe t areas on the property. Results from
the 2017 drill program have been partially received and interpr etation in underway. Diamond
drill testing of a newly identified target area in the southwes t o f t h e p r o p e r t y i s p l a n n e d f o r
spring of 2018.
More Creek
Tower completed a two-week field program on the More Creek prop erty in August of 2017.
Work completed included geological mapping, prospecting and pro perty-wide geochemical silt
and soil sampling. Key areas of structure and alteration were e valuated, and interpretations of
the project geology and property prospectivity are ongoing. Fie ldwork on the property in 2018
will be completed in combination with planned exploration progr ams on the nearby Voightberg
property.
Voigtberg
Tower plans to systematically explore the Voigtberg property in 2018, with detailed geological
and geochemical work and drill-target definition within the ext ensive surface alteration and
mineralization exposed on the property. Poorly explored areas o f cover below treeline on the
property will also be investigated with detailed prospecting and geochemical sampling.
Funding
W i t h a p p r o x i m a t e l y $ 2 . 5 m i l l i o n i n c a s h o n h a n d , T o w e r i s f u l l y financed to carry out 2018
e x p l o r a t i o n p r o g r a m s a t R a b b i t , N e c h a k o G o l d a n d i n t h e G o l d e n Triangle. During 2017 the
Company spent a combined total of approximately $1.1 million on exploration.
Appointment of Non-Executive Chairman of the Board
The Company is also pleased to announce the appointment of Rich ard Wyman as non-executive
chairman of the board of directors of the Company. Mr. Wyman ha s served as a member of the
board since October of 2010 provid ing financial and capital mar kets expertise as well as serving
as a member of the Audit Committee.
About Tower Resources
Tower Resources Ltd. (TWR.V) is a Vancouver-based junior mineral exploration company focused
on the discovery and advancement of economic mineral projects, primarily in British Columbia.
The Company's key exploration a s s e t s a r e R a b b i t N o r t h , N e c h a k o Gold, Voigtberg and More
Creek.
Some technical information contained in this release is histori cal in nature and has been
compiled from sources believed to be accurate. This technical i nformation has not been verified
by Tower and may in some instances be unverifiable dependent on the existence of all historical
grab and trench samples and drill core.
The technical content of this news release has been reviewed an d approved by Paola Chadwick,
P.Geo – Exploration Manager for the Company and qualified perso n as defined by National
Instrument 43-101.
For further information contact:
Mark Vanry - Director, CEO & President
(604) 558-2565
www.towerresources.ca
Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of
Canada accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statement Caution
This news release contai ns certain "forward-looking statements", as defined in the United States
Private Securities Litigation Reform Act of 1995, and within the meaning of Canadian securities
legislation. The Company cautions that forward-l ooking statements are based on the beliefs,
estimates and opinions of the Company's management on the date the statements are made and
they involve a number of risks and uncertainties. Consequently, there can be no assurances that
such statements will prove to be accurate and actual results and future events could differ
materially from those anticipated in such statements. The Company undertakes no obligation to
update these forward-looking statements if management's beliefs, estimates or opinions, or other
factors, should change, except as required by law. There are numerous risks and uncertainties that
could cause actual results and Tower's plans and objectives to differ materially from those
expressed in the forward-looking information. The reader is urged to refer to the Company's public
disclosure which is available through the Canadian Securities Administrators' System for Electronic
Document Analysis and Retrieval (SEDAR) at www.sedar.com for a more complete discussion of
such risk factors and their potential effects.