Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TWR.V ·

Tower Resources Intersects Significant Au‐Ag‐Zn‐Pb Mineralization at Nechako

Drill Results

Tower Resources Intersects Significant Au‐Ag‐Zn‐Pb Mineralization at Nechako 

Vancouver, B.C. – September 20, 2019 ‐ Tower Resources Ltd. (“Tower” or the “Company”) (TSXV: TWR) 

Tower Resources is pleased to report that the first phase of the planned two‐phase diamond drilling (DD) 

program targeting the April Trend on the Company’s Nechako property successfully intersected significant 

Au‐Ag‐Zn‐Pb mineralization at the head of the large, 3 km long x 1.5 km wide Au‐Ag‐Zn‐Pb glacial dispersal 

train that was previously identified in the till cover by reverse circulation (RC) drilling. 

In  this  initial  diamond  drill  test,  six  holes  totaling  631  m  we re  drilled  on  two  sections  near  the 

northwestern end of the southeast striking April Trend. The obj ective was to drill toward the southeast 

from an unaltered and unmineraliz ed basalt horizon that was int ersected beneath the till in the final RC 

drilling campaign (See June 18, 2019 press release) across a pe rvasively biotite‐altered and sulphidized 

tuff‐sediment horizon that was intersected in six of the RC hol es. It was thought that the 100 to 200 m 

spacing of the RC drill holes was sufficiently close to ensure  intersection of the targeted tuff‐sediment 

horizon. However, the diamond drill holes on both cross section s inadvertently encountered northeast 

trending cross faults that were problematic because: (a) the fa ult breccia impeded drilling to the extent 

that it was necessary to abandon two of the six holes, Nos. 01  and 02; and (b) the displacement of the 

basalt‐sediment contact on both faults is so great that only the undesirable basalt was intersected. 

Due to the unexpected cross‐faulting issue, the final hole – No . 06 – was drilled to the east rather than 

southwest. Although still mainly in basalt, this hole encountered zones of hydrothermal breccia containing 

narrow  stockwork  veins  visibly  mineralized  with  sphalerite  and  galena,  the  same  Zn  and  Pb  sulpide 

minerals that occur throughout the glacial dispersal train. Analysis of the widest, 0.2 m vein returned 2.93 

g/t Au, 34.3 g/t Ag, 5.45% Zn and 0.60% Pb. 

W h i l e  t h e  A u ‐ A g ‐ Z n ‐ P b  m i n e r a l i z a ti o n  t h a t  w a s  i n t e r s e c t e d  i n  t his  initial  diamond  drill  program  is  too 

minor too account for the large Au‐Ag‐Zn‐Pb dispersal train in  the till, it does confirm that the dispersal 

train  is  derived  from  the  April  Trend.  The  initial  drill  test  has  also  clearly  shown  that  the  100‐200  m 

separation of the earlier RC drill holes – equivalent to the length of one to two football fields – is too great 

to  reliably  predict  areas  where  the  till  is  underlain  by  fertile  sediments  rather  than  infertile  basalt.  

Additional infill RC drilling is required. As the RC drill that  was used to define the dispersal train is also 

capable  of  diamond  drilling,  a  combined  RC/diamond  drilling  program  is  planned,  with  infill  RC  holes 

drilled first to ensure intersection of only the most fertile rocks in the diamond drill holes.  

National Instrument 43‐101 Disclosure  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Mr.  Stuart  Averill, 

Chairman of ODM, a Director of the Company and a Qualified Pers on as defined by National Instrument 

43‐101. 

About Tower Resources 

Tower is a Canadian based mineral exploration company focused o n the discovery and advancement of 

economic mineral projects in the Americas. The Company’s key ex ploration assets are the Rabbit North 

copper‐gold  porphyry  project  located  between  the  New  Afton  and Highland  Valley  Copper  mines,  the 

Nechako gold project near New Gold’s Blackwater project and the More Creek and Voigtberg gold projects 

in the Golden Triangle area of Northern British Columbia. 

On behalf of the Board of Directors 

Tower Resources Ltd. 

Joe Dhami, President and CEO 

(604) 558‐2565 

www.towerresources.ca 

Reader Advisory 

This  news  release  may  contain  statements  which  constitute  “forward‐looking  information”,  including 

statements regarding the plans, intentions, beliefs and current expectations of the Company, its directors, 

or its officers with respect to the future business activities  of the Company. The words “may”, “would”, 

“could”, “will”, “intend”, “plan” , “anticipate”, “believe”, “es timate”, “expect” and similar expressions, as 

they relate to the Company, or its management, are intended to identify such forward‐looking statements. 

Investors are cautioned that any such forward‐looking statement s are not guarantees of future business 

activities and involve risks and uncertainties, and that the Company’s future business activities may differ 

materially from those in the forward‐looking statements as a re sult of various factors, including, but not 

limited to, fluctuations in market prices, successes of the operations of the Company, continued availability 

of capital and financing and general economic, market or business conditions. There can be no assurances 

that  such  information  will  prove  accurate  and,  therefore,  reade rs  are  advised  to  rely  on  their  own 

evaluation of such uncertainties. The Company does not assume a ny obligation to update any forward‐

looking information except as required under the applicable securities laws. 

Neither TSX Venture Exchange nor i ts Regulation Services Provid er (as that term is defined in policies of 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.