Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TVI.V ·

TVI Pacific's 30.66% owned TVIRD Closes US $28.5 million Term Loan Facility for its Balabag Gold Project

Financings Debt & Credit Facilities

TVI Pacific's 30.66% owned TVIRD Closes US

$28.5 million Term Loan Facility for its

Balabag Gold Project

CALGARY

,

Oct. 22, 2019

/CNW/ - TVI Pacific Inc.

(TSX-V: TVI) (OTC Pink: TVIPF)

("

TVI

" or "

the

Company

") is pleased to announce that TVI Resource Development Phils., Inc. ("

TVIRD

"), a

Philippines

corporation in which TVI holds a 30.66% interest, has closed an Omnibus Loan and

Surety Agreement ("

OLSA

") with China Banking Corporation (the "

Lender

") providing for a US

$28.5

million

principal amount term loan facility (the "

Facility

"), the proceeds of which shall be used to

partially finance its 2,000 metric tons per day ("

MTPD

") Balabag gold/silver mining project

("

Balabag

").

Balabag Financing Highlights

US

$28.5 million

Facility concluded with the China Banking Corporation.

Five (5) year term with a fixed interest rate per annum.

Repayable in fifteen (15) equal quarterly installments to start at the end of the sixth (6

th

) quarter

from the initial drawdown date. Interest is payable starting at the end of the first quarter from

the initial drawdown date.

Balabag Financing

The Facility is a five (5) year term loan facility from the Lender in the aggregate principal amount of

up to US

$28.5 million

, the proceeds of which shall be used to partially finance TVIRD's 2,000 MTPD

Balabag project.

TVIRD has elected to apply a fixed interest rate to any amounts borrowed through the Facility that

shall be based on the sum of the 5-year rate on US dollar denominated bonds issued by the

Philippine government plus a spread of 275 basis points.

The principal shall be repaid in fifteen (15) equal quarterly installments to start at the end of the sixth

(6

th

) quarter from the initial drawdown date, with interest payable quarterly in arrears starting at the

end of the first quarter from the initial drawdown date. An option exists to prepay the Loan, in full or

in part, subject to a prepayment penalty.

The Loan shall be secured by:

a)

All agreements related to the 2,000 MTPD Balabag gold/silver project ("

Project Agreements

"), including but not limited to all exports and remittances related to Balabag, and

the right, title and interest to all such Project Agreements;

b)

The Debt Service Reserve Account that shall hold at least the amount equivalent to the next principal repayment and interest due up to 90 days in advance of the due date,

and the Debt Service Payment Account that shall also hold the amount equivalent to the next principal repayment and interest due at least five (5) business days in advance

of the due date; and,

c)

Insurance contract rights.

Other fees due to the lender include a commitment fee equal to 25 basis points per annum

calculated on the undrawn portion of the Facility, and a one-time upfront fee of 50 basis points

calculated on the entire amount of the Facility, payable on the initial drawdown date.

"Conclusion of a loan facility with China Banking Corporation represents the final step required to

proceed with the Balabag gold/silver project, which is the fourth mine for TVIRD following the

Canatuan gold-silver mine from 2004 to 2008, the Canatuan copper-zinc mine from 2009 to 2014

and then the Agata nickel direct shipping ore project that commenced in 2014 and in which TVIRD

holds a 60% interest," stated

Cliff James

, Chairman and CEO of TVI and Chairman of TVIRD. "We

are most excited about this opportunity after years of study and preparation and look forward to the

value this project may be expected to bring to the Company, our shareholders and the community."

About Balabag

Balabag is owned 100% by TVIRD and is fully permitted to proceed. The total capital expenditure

requirement for the Balabag project is expected to be US

$48.85 million

, with the difference between

this total anticipated capital expenditure requirement and the Facility to be funded by internally

generated TVIRD cash and cash generated specifically by the Balabag project.

An updated NI 43-101 technical report entitled "NI 43-101 Technical Report: Balabag Gold and

Silver Project, Balabag, Depore, Zamboanga del Sur,

Philippines

", and as announced on

October

18, 2019

, has been filed on

October 18

, 2019.

Exploration work has continued at Balabag following preparation of the internal TVIRD resource

model in 2014 upon which the current updated NI 43-101 technical report has been based. Activities

have included mapping and sampling of underground tunnels, particularly in the Lalab and Miswi

area, and has extended into Mossad (north of Balabag hill). Additional drilling was initiated in 2018

and has continued into 2019 with 28 drill holes (for a total of 2,356 meters drilled). Data from the

recent drilling campaign continues to be analyzed.

About TVI Resource Development Phils., Inc.

TVIRD, a Philippine corporation in which TVI holds a 30.66% interest, is a diversified mining

company that focuses on the acquisition, exploration, development and production of resource

projects in the Philippines. It operates under the highest standards of health and safety practices for

its workers and its host community; and is uncompromising in its best-practices approach to

environmental protection as well as community development. TVIRD has a pool of highly competent

managers, technical personnel and skilled workers with previous experience in gold-silver operation,

and holds a 60% interest in AMVI, a nickel laterite DSO operation that commenced in

October 2014

and in which TVIRD is operator. To date AMVI has shipped a total of 12.71 million wet metric

tonnes through 235 shipments. TVIRD also owns 100% of the Balabag gold/silver project.

About TVI Pacific Inc.

TVI Pacific Inc. is a Canadian resource company focused on the acquisition of resource projects in

the

Asia Pacific

region. TVI currently holds a 30.66% equity interest in TVIRD and a 3.57% equity

interest in Integrated Green Energy Solutions Ltd, a publicly listed company incorporated in

Australia

with shares listed on the ASX, that is engaged in the commercialization of technologies related to

converting waste plastics to fuel in

Australia

and internationally. TVI's other holdings include a

14.4% equity interest in Mindoro Resources Ltd. and a 100% investment in shares of TG World. As

at the date of this announcement, TVI has 655,537,039 outstanding common shares and

696,887,039 fully diluted including the currently issued outstanding options of 41,350,000.

IMPORTANT INFORMATION REGARDING FORWARD-LOOKING STATEMENTS

Certain information set out in this News Release constitutes forward-looking information. Forward-

looking statements are often, but not always, identified by the use of words such as "seek",

"anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might",

"should", "believe", "scheduled", "to be", "will be" and similar expressions. Forward-looking

statements in this News Release are based upon the opinions and expectations of management of

the Company as at the effective date of such statements. Although the Company believes that the

expectations reflected in such forward-looking statements are based upon reasonable

assumptions, it can give no assurance that those expectations will prove to have been correct.

Forward-looking statements are subject to certain risks and uncertainties (known and unknown)

that could cause actual outcomes to differ materially from those anticipated or implied by such

forward-looking statements.

Forward-looking statements are based upon the opinions and expectations of management of the

Company as at the effective date of such statements and, in certain cases, information supplied by

third parties. Although the Company believes the expectations reflected in such forward-looking

statements are based upon reasonable assumptions and that information received from third

parties is reliable, it can give no assurance that those expectations will prove to have been

correct.

Forward-looking statements are subject to certain risks and uncertainties that could

cause actual events or outcomes to differ materially from those anticipated or implied by

such forward-looking statements.

These factors include, but are not limited to, such things as

changes in general economic conditions in

the Philippines

and elsewhere; the volatility of prices

for certain base and precious metals and other commodities; commodity supply and demand;

fluctuations in currency and interest rates; an inability to procure third party approvals in a timely

manner or on satisfactory terms; new laws and regulations (domestic and foreign); inherent risks

associated with the exploration and development of mining properties; ultimate recoverability of

reserves; production, timing, results and costs of exploration and development activities; political

or civil unrest; TVIRD's overall plans, budget and strategy (which are all subject to change), and

extreme weather conditions and forces of nature (i.e. typhoons, heavy rains, earthquakes, and the

like) that may disrupt operations and exploration.

Accordingly, readers should not place undue

reliance upon the forward-looking statements contained in this material change report and

such forward-looking statements should not be interpreted or regarded as guarantees of

future outcomes.

The Company does not have control over TVIRD nor does it have any involvement in the

management or decisions of TVIRD or control over financial reporting and internal controls of

TVIRD. The Company relies on the internal controls and financial reporting controls of TVIRD and

their failure to maintain effectiveness or comply with applicable standards may adversely affect

TVI.

Forward-looking information respecting the content of the Updated NI 43-101 is based upon

various assumptions and factors including exploration and development work completed to date at

Balabag. Readers are cautioned that such estimates contained within the Updated NI 43-101

remain conceptual in nature and mineral resources that are not mineral reserves do not have

demonstrated economic value.

Various risks to which the Company is exposed in the conduct of its business (including mining

activities) are described in detail in the Company's Annual Information Form for the year ended

December 31, 2018

, which was filed on SEDAR on

April 29, 2019

and is available under the

Company's profile at

www.SEDAR.com

.

The forward-looking statements contained in this News Release are made as of the date hereof

and the Company does not undertake any obligation to update or to revise any of the included

forward-looking statements, except as required by applicable securities laws in force in Canada.

The forward-looking statements contained herein are expressly qualified by this cautionary

statement.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SOURCE

TVI Pacific Inc.

View original content:

http://www.newswire.ca/en/releases/archive/October2019/22/c1482.html

%SEDAR: 00001837E

For further information:

Patrick Hanna, Chief Financial Officer, TVI Pacific Inc., Phone: 403-265-

4356, E-mail: [email protected]

CO: TVI Pacific Inc.

CNW 07:13e 22-OCT-19