Hole GS-20-94 Intersects 1.215 Gpt AuEq over 354.0 Meters Within 1225.5 Meters of 0.702 Gpt AuEq ; Hole GS-20-83 Intersects 1.078 Gpt AuEq over 345.0 Meters Within 921.0 Meters of 0.821 Gpt AuEq
TEUTON RESOURCES CORP .
2130 Crescent Road
Victoria, BC V8S 2H3
Phone: (778) 430-5680
Website: www.teuton.com
TEUTON REPORTS FURTHER LONG INTERVALS OF GOLD MINERALIZATION IN FIFTH SET OF DRILL HOLES
AT TREATY CREEEK PROPERTY , GOLDEN TRIANGLE, BC
HOLE GS-20-94 INTERSECTS 1.215 GPT AUEQ OVER 354.0 METERS WITHIN 1225.5 METERS OF 0.702
GPT AUEQ ; HOLE GS-20-83 INTERSECTS 1.078 GPT AUEQ OVER 345.0 METERS WITHIN 921.0 METERS
OF 0.821 GPT AUEQ
NEWS RELEASE: December 16, 2020 - Vancouver, Canada –– Teuton Resources Corp. (“Teuton” or “the
Company”) (“TUO”-TSX-V) ("TFE"- Frankfurt) has received a report from its joint venture partner Tudor
Gold containing results from the fifth set of holes drilled in the Goldstorm zone in 2020. The Goldstorm
has been the subject of an intense drilling program in 2020 and lies within the Treaty Creek property,
situated in the heart of the Golden Triangle of northwestern British Columbia and on-trend from
Seabridge’s KSM Project located five kilometers to the southwest.
Results from 12 diamond drill holes were recently received from MSA Labs with final results from another
11 diamond drill holes pending. All 12 holes have successfully interse cted the Goldstorm System,
expanding and defining the mineralization along the northeast and southeast axes, as well as to depth.
The Goldstorm System 300 Horizon has now been traced for 1100 meters along the northeast axis and, as
well, the CS -600 and DS -5 zones have been expanded to the northeast and to depth. All 39 drill holes
completed at Goldstorm during the 2020 program have encountered significant precious metal
mineralization. The 2020 Treaty Creek Diamond Drill Program was completed last week, an d field
personnel have winterized the camp. The track-components of two track-mounted diamond drills remain
on site ready for start-up of the 2021 exploration season.
Tudor Gold’s Vice President of Project Development, Ken Konkin, P .Geo., stated: “We are very pleased
with the results obtained from all 39 drill holes completed this year to-date and we anticipate the release
of the final 11 holes of the year within a few weeks. This brings the total to 50 drill holes that were
completed this year at the Golds torm Zone. These latest holes continued to expand the limits of the
mineralized targets along the northeastern and the southeastern axes, and to depth. For a fifth
consecutive press release, we have surpassed our best result from last years’ drill hole pro gram (0.697
AuEq over 1081.5 meters in hole GS -19-47) with drill holes GS -20-83 and GS -20-94 as described in the
headline. The final 11 drill holes represent over 9600 meters of drilling and we expect that MSA Labs will
complete the analysis of these final samples as soon as possible.”
Treaty Creek Highlights include:
• Twelve drill holes presented in this press release total 11,551.1 meters
• The best results were from GS -20-94, a near -surface 354.0 meter intercept (36.0 -390 m)
averaging 1.215 gpt AuEq and GS-20-82 with a 351m intercept (113.0-464.0 m) averaging 1.051
gpt AuEq. Both holes are located on Section 111+00 NE.
• Equally impressive was drill hole GS-20-83 that also had a near-surface intercept over a similar
345.0 meters (73.5-418.5 m) that averaged 1.078 gpt AuEq on Section 112+50 NE.
• More Core Drilling did an excellent job completing 50 HQ/NQ2 diamond drill holes totaling
43,972 meters at Goldstorm and 1,636 meters at the Perfect Storm Target with three drill holes.
The following three tables below provide the complete list of composited drill hole results as well as the
drill hole data including hole location, elevation, depth, dip and azimuth.
Table l: Results Goldstorm Zone Press Release December 15th 2020
Section Hole Zone From To Interval
(m)
Au Ag Cu AuEQ
114+00
NE
GS-20-
80
300H + CS600 222.50 1349.00 1126.50 0.369 1.66 653 0.486
including 300H 398.00 695.50 297.50 0.488 1.98 135 0.531
and including
CS600
831.50 1028.00 196.50 0.572 3.25 2703 1.011
115+50
NE
GS-20-
81
300H + CS600 +
DS5
558.40 1389.50 831.10 0.422 1.56 940 0.580
includ 300H +
CS600
558.40 957.50 399.10 0.529 1.96 1712 0.807
with 300H 558.40 636.50 78.10 1.047 1.52 139 1.086
and with CS600 704.00 957.50 253.50 0.481 2.37 2494 0.879
111+00
NE
GS-20-
82
300H + CS600 113.00 1041.50 928.50 0.629 2.46 519 0.736
including 300H 113.00 464.00 351.00 0.969 3.56 263 1.051
with 300H 224.00 422.00 198.00 1.283 5.29 408 1.407
112+50
NE
GS-20-
83
300H + CS600 +
DS5
73.50 994.50 921.00 0.676 3.97 655 0.821
including 300H 73.50 418.50 345.00 1.008 3.48 191 1.078
and including
CS600
566.45 727.50 161.05 0.426 3.90 2863 0.898
and including
DS5
813.00 994.50 181.50 0.919 7.33 190 1.035
112+50
NE
GS-20-
85
300H 66.50 692.00 625.50 0.748 3.80 275 0.834
CS600 752.00 989.00 237.00 0.241 2.23 1734 0.524
DS5 1118.00 1278.50 160.50 0.511 2.11 128 0.555
114+00
NE
GS-20-
86
300H 118.50 577.50 459.00 0.712 3.43 263 0.792
CS600 730.50 942.00 211.50 0.469 2.49 2172 0.821
DS5 1014.00 1425.00 411.00 0.595 2.85 145 0.650
including 1192.50 1395.00 202.50 0.889 3.39 130 0.949
111+00
NE
GS-20-
89*
300H 87.00 125.00 38.00 1.142 12.85 91 1.309
111+00
NE
GS-20-
90
300H + CS600 63.00 847.50 784.50 0.646 2.89 465 0.750
including 300H 72.00 405.00 333.00 0.915 3.60 177 0.984
and including
CS600
643.50 768.00 124.50 0.635 4.60 1632 0.932
110+00
NE
GS-20-
93*
300H 20.50 237.50 217.00 0.535 3.40 152 0.599
incl. 20.50 131.00 110.50 0.850 5.49 206 0.946
111+00
NE
GS-20-
94
300H 36.00 1261.50 1225.50 0.646 2.50 178 0.702
including 36.00 390.00 354.00 1.123 4.14 287 1.215
or including 36.00 820.50 784.50 0.856 3.45 239 0.933
108+00
NE
GS-20-
96
300H 6.00 109.50 103.50 0.804 2.27 129 0.850
CS600 279.00 385.50 106.50 0.228 3.77 1235 0.457
110+00
NE
GS-20-
97
300H 18.40 584.00 565.60 0.609 1.95 107 0.648
incl. 18.40 381.50 363.10 0.693 2.35 141 0.742
*lost drill hole in mineralization
• All assay values are uncut and intervals reflect drilled intercept lengths.
• HQ and NQ2 diameter core samples were sawn in half and typically sampled at standard 1.5m
intervals
• The following metal prices were used to calculate the Au Eq meta l content: Gold $1322/oz, Ag:
$15.91/oz, Cu: $2.86/lb. Calculations used the formula Au Eq g/t = (Au g/t) + (Ag g/t x 0.012) +
(Cu% x 1.4835). All metals are reported in USD and calculations do not consider metal recoveries.
• True widths have not been deter mined as the mineralized body remains open in all directions.
Further drilling is required to determine the mineralized body orientation and true widths.
Table ll: Drill Data for Holes in Press Release December 15th, 2020
Attached are Sections 108+00 NE, 110+00 NE, 111+00 NE, 112+50 NE, 114+00 NE and 115+50 NE showing
holes traces with histogram plots for gold and copper results and a Plan Map showing the drill hole and
section locations.
Walter Storm, President and CEO of Tudor Gold , stated: “We are very pleased to announce the safe
successful completion of our 2020 diamond drill hole program. We completed over four times the amount
of drilling from the previous year’s program, greatly advancing Tudor’s flagship Treaty Creek Property. We
completed almost 44,000 meters of drilling at the Goldstorm System and over 1,600 meters of drilling at
the Perfect Storm target. Once we receive the final results from the last eleven drill holes, we will then
pass the data to our resource engineers and geoscien tists for an initial resource estimate. Continued
drilling is required for 2021 to locate the limits or edges of the mineralized system. Due to the size and
robust nature of the mineralization, the Goldstorm System remains open on all fronts and to depth. We
are proud of what we have achieved in these last two years of exploration and in -particular, the great
effort to withstand the harsh winter elements during November and December at Treaty Creek to bring
Section Hole ID UTM E NAD83 UTM N NAD83 Elevation (m) Azi (°) Dip (°) Depth (m)
108+00 NE GS-20-96 428358.8 6272666.6 1301.1 115 -45 552.0
110+00 NE GS-20-93* 428520.7 6272796.9 1270.5 288 -50 316.2
GS-20-97 428520.7 6272796.7 1270.5 286 -52 662.0
111+00 NE GS-20-82 428428.3 6272984.3 1372.6 295 -78 1050.3
GS-20-89* 428430.9 6272982.5 1371.2 125 -72 126.0
GS-20-90 428431.2 6272982.0 1370.8 115 -74 873.0
GS-20-94 428551.5 6272932.5 1292.5 287 -57 1335.0
112+50 NE GS-20-83 428539.7 6273077.5 1366.5 115 -73 999.0
GS-20-85 428550.9 6273085.9 1367.0 295 -80 1316.0
114+00 NE GS-20-80 428651.5 6273191.9 1369.9 295 -70 1391.0
GS-20-86 428651.4 6273191.8 1369.3 295 -80 1449.0
115+50 NE GS-20-81 428781.4 6273288.4 1345.1 295 -70 1481.6
*Lost Hole in mineralization
Table III: DDH Data for completed holes with results pending
Section Hole ID UTM E NAD83 UTM N NAD83 Elevation (m) Azi (°) Dip (°) Depth (m)
108+00 NE GS-20-100 428355.0 6272668.2 1301.1 295 -55 812.0
109+00 NE GS-20-95 428415.8 6272747.3 1289.3 115 -57 582.0
GS-20-98 428413.9 6272748.1 1290.1 115 -68 534.0
112+50 NE GS-20-87 428541.3 6273076.8 1366.1 115 -60 937.7
GS-20-91 428667.0 6273018.0 1287.0 287 -50 1191.0
114+00 NE GS-20-84 428659.1 6273197.5 1368.7 115 -69 1064.0
GS-20-92 428810.8 6273080.1 1255.6 287 -45 1023.0
GS-20-102 429094.6 6272944.2 1234.1 290 -90 725.0
115+50 NE GS-20-88 428781.4 6273288.4 1345.1 295 -75 1440.0
GS-20-99 429128.7 6273106.3 1223.7 290 -85 965.0
117+00 NE GS-20-101 429226.7 6273216.6 1211.0 290 -90 348.0
the 2020 drill campaign to a safe close. Our commitment is to continue to advance the project as quickly
as possible. We have left the track-drill carriage components for two track-mounted drill rigs on-site so our
team can get an early start to the 2021 drill season. We look forward to receiving the fin al results of the
eleven drill holes from MSA Labs within a couple of weeks to complete the 2020 exploration season on
schedule.”
D. Cremonese, P . Eng., President of Teuton Resources Corp. commented as follows: “Let me give thanks
to Walter Storm, Ken Konkin and Sean Pownall of More Core Drilling: they did a superb job this year at
Treaty Creek. Drilling 44,000m beginning in May and finishing up in the cold winter winds of December—
they doubled the length of the typical Stewart work season and showed it could be done efficiently and
safely. They really advanced the project in 2020 and the property rewarded us all with excellent results.”
Tudor Gold Corp and its associated service companies report that they have taken extreme measures to
maintain the highest professional standards while working within COVID-19 health and safety protocols.
QA/QC
Drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and assayed at MSA
Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are monitored by the
submission of blanks, certified standards and duplica te samples inserted at regular intervals into the
sample stream by Tudor Gold personnel. MSA Laboratories quality system complies with the requirements
for the International Standards ISO 17025 and ISO 9001. MSA Labs is independent of the Company.
Qualified Person
The Qualified Person for this news release for the purposes of National Instrument 43-101 is Tudor Gold’s
Vice President Project Development, Ken Konkin, P .Geo. He has read and approved the scientific and
technical information that forms the basis for the disclosure contained in this news release.
About Teuton
Teuton owns interests in more than thirty properties in the prolific “Golden Triangle” area of northwest
British Columbia and was one of the first companies to adopt what has since become known as the
“prospect generator” model. Ten of these properties are currently under option to third parties. Over $2
million in option cash payments (not including appreciable payments made in shares) has been generated
from these properties since 2015, including properties where optionees have already earned their
interest.
Teuton was the original staker of the Treaty Creek property assembling the core land position in 1985. It
presently holds a 20% carried interest in Treaty Creek (carried until such time as a production decision is
made) as well as a 0.98% NSR in t he claims covering the Goldstorm zone. A 0.49% NSR is owned in the
peripheral claims. None of the NSRs are subject to a buy-back. Teuton also owns eight other royalties in
the Sulphurets Hydrothermal System with interests ranging up to 2.5% , none of wh ich are subject to a
buyback. Interest ed parties can access information about Teuton at the Company’s website,
www.teuton.com.
Figures Accompanying News Release
http://teuton.com/PlanViewDec15
http://teuton.com/GSZ10800NEAuCu
http://teuton.com/GSZ11000NEAuCu
http://teuton.com/GSZ11100NEAuCu
http://teuton.com/GSZ11250NEAuCu
http://teuton.com/GSZ11400NEAuCu
http://teuton.com/GSZ11550NEAuCu
Respectfully submitted,
"Dino Cremonese, P .Eng."
Dino Cremonese, P . Eng.,
President and Chief Executive Officer
For further information, please visit the Company's website at www.teuton.com or contact:
Barry Holmes
Director Corporate Development and Communications
Tel. 778-430-5680
Email: [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statements regarding Forward-Looking information
Certain statements contained in this press release constitute forward-looking information. These statements relate
to future events or future performance. The use of any of the words " could", "intend", "expect", "believe", "will",
"projected", "estimated" and similar expressions and statements relating to matters that are not historical facts
are intended to identify forward -looking information and are based on the Company's current bel ief or
assumptions as to the outcome and timing of such future events. Actual future results may differ materially.
All statements relating to future plans, objectives or expectations of the Company are forward-looking statements
that involve various risk s and uncertainties. There can be no assurance that such statements will prove to be
accurate and actual results and future events could differ materially from those anticipated in such statements.
Important factors that could cause actual results to diffe r materially from the Company's plans or expectations
include risks relating to the actual results of current exploration activities, fluctuating gold prices, possibility of
equipment breakdowns and delays, exploration cost overruns, availability of capita l and financing, general
economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals
and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.
The Company expressly disclaims any intention or obligation to update or revise any forward -looking statements
whether as a result of new information, future events or otherwise except as otherwise required by applicable
securities legislation.