White Rock, British Columbia , September 16, 2024 – Honey Badger Silver Inc. (TSXV:TUF |
OTCQB:HBEIF) (“Honey Badger” or the “Company”) is very pleased to announce that a detailed
review of the recently acquired historic database of drilling and assays at its 100% -owned
Nanisivik project in Nunavut has shown very encouraging results for silver mineralization in
multiple areas that were not mined.
The Nanisivik Mine produced about 17.9 million tons of ore grading 9% zinc (Zn), 0.72% lead (Pb),
and 35 grams per ton ne (g/t) silver (Ag) between 1976 and 2002 (1). Honey Badger acquired its
initial 5,723 hectares through staking in 2022.
The Company’s CEO Dorian L. (Dusty) Nicol commented, “We have identified multiple targets that
host prospective areas of silver-bearing mineralization. This underscores our contention that the
entire large project area has potential to host economic orebodies and merits further
investigation. In addition to these newly identified areas of silver -bearing mineralization, our
rationale for originally acquiring Nanisivik was that there is a very large (over 100 million tonnes)
unmined, pyrite-rich massive sulphide zone containing silver that could be economic at today’s
commodity prices. Our target grade is 30-50 grams per tonne silver (roughly 1.0 to 1.5 ozs/ton).
We will continue to evaluate this database to further define silver bearing targets as well as
detailed review of the geophysics database, likely using innovative AI techniques similar to those
that the Company has been employing with great effect on its Plata Project in the Yukon.”
“Our vision at Nanisivik is an eventual target resource of at least 100 million ounces of silver. The
prospectivity is supported by large tonnages in multiple sulphide zones at Nanisivik with
anomalous concentrations of silver and zinc as well as, locally, the potential for important critical
metals germanium, gallium, and indium. In addition, with a deep- sea port being constructed
adjacent to the Nanisivik Mine, the pyrite bodies themselves may have significant commercial
value as a source of sulphur, as global demand for sulphur is expected to increase dramatically (3).
We will continue to evaluate the potential of Nanisivik to host economic mineralization, including
commissioning an initial desktop study on the economic viability of the massive pyrite bodies.”
Comprehensive Data Analysis Yields Promising Results
As reported in a news release dated May 2, 2024 , the Company recently acquired a historical
database that includes drilling, geological, mining, and geophysical information that the Company
considers extremely valuable for its Nanisivik claims. The database contains the results from
decades of drilling at Nanisivik that the Company estimates would cost well over $40 million to
replicate today. The database also contains a historical regional airborne geophysical survey from
the early 1980s that will be utilized to conduct modern geophysics and targeting. The database
was reviewed independently by APEX Geoscience Ltd., a 3D model was constructed, and
historical mining information was used to identify areas that host silver mineralization. Based
upon this compilation, many of these historical drillholes revealed significant silver intercepts in
areas that were never mined (Table 1).
The main areas mined at the Nanisivik Mine were the Main Zone with some production from the
Oceanview Zone and very minor production from K-Baseline and Area 14 zones (Figure 1). There
are many intersections a significant distance west of the Oceanview workings plus in at least two
separate zones to the north of the workings that yielded multiple significant Pb -Zn-Ag
intersections. These include (see Figures 1 and 2; Table 1 – true widths not currently known) the
following intersections west of Oceanview:
• 17.76% zinc (Zn), 9.8% lead (Pb), and 74.7 g/t Ag over 2.7 m core length starting at 30 m
downhole.
• 17.53% Zn, 11.82% Pb and 71.2 g/t Ag over 2.7 m core length starting at 30.1 m downhole.
The historical drill data also disclosed significant silver values (over 100 g/t Ag) at unmined areas
at Oceanview North, Deb and Area 14. Highlights are included in Table 1 below and include:
• Deb Prospect :6.9% Zn and 185.3 g/t Ag over 1.3 m core length starting at 112.0 m
downhole.
• Oceanview North Prospect: 22.79% Zn, 12.42% Pb and 97.6 g/t Ag over 5.3 m core length
starting at 15.5 m downhole.
• Area 14 Prospect: 27.43% Zn, 11.97% Pb and 280.0 g/t Ag over 2.3 m core length starting
at 20.1 m downhole.
There is no information available in the database for important strategic metals including
germanium, gallium and indium because previous operators had little interest in these elements.
Figure 1. Mine workings, infrastructure and mineral claims Nanisivik area.
Figure 2. Selected Ag values in drillholes from around the Nanisivik area.
HOLE ID ZONE ID From m To m Interval m Zn% Pb% Ag g/t Comment
90-59 DEB CLA I M 102.4 103.1 0.7 34.60 3.50 263.0 Not Mined
90-61 DEB CLA I M 103.5 104.1 0.6 32.30 5.60 202.0 Not Mined
91-19 DEB CLA I M 100.2 100.8 0.6 43.00 5.50 349.3 Not Mined
91-19 DEB CLA I M 112 113.3 1.3 6.90 185.3 Not Mined
91-21 DEB CLA I M 143.7 144.5 0.8 12.60 309.1 Not Mined
92-04 DEB CLA I M 128 129.1 1.1 11.80 131.7 Not Mined
85-102 K-BASELINE 69.7 73.7 4 9.55 34.0 Well east of workings
88-59 K-BASELINE 70.2 76.1 5.9 11.52 32.5 Well east of workings
88-64 K-BASELINE 66.8 70.8 4 14.75 36.5 East of workings
89-19 OCEANVIEW MAIN WEST 34.5 37.9 3.4 8.68 9.63 33.2 West of OV workings
89-20 OCEANVIEW MAIN WEST 45.1 51 5.9 11.72 1.74 49.2 West of OV workings
89-21 OCEANVIEW MAIN WEST 34.8 38.2 3.4 7.20 24.77 35.1 West of OV workings
89-22 OCEANVIEW MAIN WEST 46 50.5 4.5 11.43 3.33 35.3 West of OV workings
89-23 OCEANVIEW MAIN WEST 30 32.7 2.7 17.76 9.80 74.7 West of OV workings
89-24 OCEANVIEW MAIN WEST 39.1 47 7.9 9.89 1.37 35.8 West of OV workings
90-13 OCEANVIEW MAIN WEST 51.2 57 5.8 10.49 2.93 31.5 West of OV workings
96-41 OCEANVIEW MAIN WEST 35 39 4 16.05 2.63 36.2 West of OV workings
96-43 OCEANVIEW MAIN WEST 46.4 50.5 4.1 12.66 0.48 48.8 West of OV workings
OV6 OCEANVIEW MAIN WEST 23 26.9 3.9 13.81 3.17 46.4 West of OV workings
OV90-1 OCEANVIEW MAIN WEST 30.1 32.9 2.8 17.53 11.82 71.2 West of OV workings
OV90-2 OCEANVIEW MAIN WEST 44.2 47.3 3.1 11.63 4.03 31.7 West of OV workings
86-110 OCEANVIEW WEST 40 43 3 14.30 32.5 Well west of OV Workings
86-110 OCEANVIEW WEST 40 44.5 4.5 11.33 23.3 Well west of OV Workings
88-10 OCEANVIEW WEST 34.4 39.4 5 9.62 26.8 Well west of OV Workings
88-10 OCEANVIEW WEST 41 46 5 5.20 8.08 21.3 Well west of OV Workings
88-13 OCEANVIEW WEST 37.2 40.5 3.3 8.40 3.19 24.7 Well west of OV Workings
88-35 OCEANVIEW WEST 29.5 31.5 2 6.30 2.90 29.0 Well west of OV Workings
95-49 OCEANVIEW WEST 5.5 10 4.5 8.73 26.3 Well west of OV Workings
95-55 OCEANVIEW WEST 16 19 3 10.85 30.5 Well west of OV Workings
85-106 OC EANVIEW NORTH 2 7.9 5.9 17.31 3.31 42.2 Well North of workings
85-108 OC EANVIEW NORTH 6 9.5 3.5 15.67 1.11 57.9 Well North of workings
85-109 OC EANVIEW NORTH 4 8 4 22.10 7.50 65.0 Well North of workings
87-50 OC EANVIEW NORTH 24.4 28.4 4 19.55 47.4 Well North of workings
87-50 OC EANVIEW NORTH 38.4 41.8 3.4 8.14 16.4 Well North of workings
87-63 OC EANVIEW NORTH 15.5 20.8 5.3 22.79 12.42 97.6 Well North of workings
87-79 OC EANVIEW NORTH 11 14.3 3.3 10.73 7.70 14.1 Well North of workings
OV12 OC EANVIEW NORTH 2.8 8.8 6 8.63 1.97 21.0 Well North of workings
OV14 OC EANVIEW NORTH 0.4 2.6 2.2 24.90 4.30 58.0 Well North of workings
OV85-05 OC EANVIEW NORTH 23.6 27.5 3.9 7.89 2.60 23.0 Well North of workings
OV85-08 OC EANVIEW NORTH 6.4 10 3.6 14.48 33.8 Well North of workings
86-206 OC EANVIEW NORTH 12.1 15.2 3.1 15.54 2.07 55.8 Well North of workings
86-207 OC EANVIEW NORTH 7.8 10.8 3 10.28 4.15 15.0 Well North of workings
90-21 OC EANVIEW NORTH 8.2 11.7 3.5 14.47 8.31 37.9 Well North of workings
90-31 OC EANVIEW NORTH 30.2 33.2 3 9.05 5.20 42.0 Well North of workings
93-15 OC EANVIEW NORTH 2.7 4 1.3 24.90 30.10 100.8 Well North of workings
93-15 OC EANVIEW NORTH 5.5 6.1 0.6 16.50 14.60 207.0 Well North of workings
93-16 OC EANVIEW NORTH 4.9 11.7 6.8 17.12 1.52 22.4 Well North of workings
94-11 OC EANVIEW NORTH 6.5 9.8 3.3 11.70 25.12 72.2 Well North of workings
94-13 OC EANVIEW NORTH 15.4 17 1.6 20.10 5.60 114.9 Well North of workings
94-17 OC EANVIEW NORTH 11.3 19 7.7 11.34 0.71 32.9 Well North of workings
94-5 OC EANVIEW NORTH 6 9.8 3.8 1.22 45.31 52.8 Well North of workings
94-6 OC EANVIEW NORTH 12.4 15.4 3 9.70 0.50 36.0 Well North of workings
88-31 OC EANVIEW NORTH 51.8 54 2.2 13.70 2.0 Well North of workings
93-02 OC EANVIEW NORTH 41.3 43 1.7 12.70 56.6 Well North of workings
85-22 SHALE HILL 46.2 48.7 2.5 18.31 57.3 Likely above the workings
80-87 SOUTH PYRITE 55.3 55.8 0.5 33.60 20.29 Not Mined
90-45 SOUTH PYRITE 54.9 55.3 0.4 7.50 2.80 18.0 Not Mined
82-43 AREA 14 17.05 19.15 2.1 28.97 5.19 Was Partially Mined
82-52 AREA 14 17.7 20.1 2.4 27.22 4.24 Was Partially Mined
85-42 AREA 14 20 22.6 2.6 15.10 80.0 Was Partially Mined
86-189 AREA 14 15 17.9 2.9 12.18 8.8 Was Partially Mined
86-191 AREA 14 15.2 18.2 3 26.16 5.56 143.3 Was Partially Mined
A14_85-05 AREA 14 5.5 7.5 2 8.61 12.48 91.6 Was Partially Mined
A14_85-08 AREA 14 20.1 22.4 2.3 27.43 11.97 280.0 Was Partially Mined
A14_85-10 AREA 14 16 18.3 2.3 6.10 13.06 239.3 Was Partially Mined
*Intervals are downhole width which is expected to represent 80 to 100% of true width
Table 1: Historical Nanisivik surface drillhole assay highlights from unmined areas.
About Nanisivik
The Nanisivik Mine (near Arctic Bay, Nunavut) produced over 20 million ounces of silver between
1976 and 2002, from 17.9 million tons of ore, grading 9% zinc, 0.72% lead, and 35 grams per
tonne silver (1). In addition to the polymetallic orebody, previous exploration identified massive
sulphide bodies (principally pyrite) still in place, totaling about 100 million tonnes (1,2), containing
locally anomalous base metal and silver values.
(1) Reference: Geological Survey of Canada, 2002-C22, “Structural and Stratigraphic Controls
on Zn -Pb-Ag Mineralization at the Nanisivik Mississippi Valley -type Deposit, Northern
Baffin Island, Nunavut; by Patterson and Powis.
(2) A qualified person has not done sufficient work to classify this historic tonnage estimate
as a current mineral resource and the Company is not treating the estimate as a current
mineral resource. The historic tonnage estimate cannot be relied upon. Additi onal work,
including verification drilling / sampling, will be required to verify the estimate as a
current mineral resource.
(3) University College London study, 1922, published by Royal Geographic Society.
Settlement of Certain Payables in Shares
The Company reports two service providers have asked to settle CAD$102,618.00 in outstanding
invoices by the issuance of 1,026,180 common shares (the “ Shares”) valued at CAD$0.10 per
Share. This transaction is subject to the approval of the TSX Venture Exchange. Shares issued will
be subject to a four-month plus one day hold period from the date of issuance.
QP Statement
Michael Dufresne, M.Sc., P.Geol., P.Geo., is a n independent qualified person as defined by
National Instrument 43 -101 and has reviewed and approved the scientific and technical
information in this press release.
About Honey Badger Silver Inc.
Honey Badger Silver is a silver company. The company is led by a highly experienced leadership
team with a track record of value creation backed by a skilled technical team. Our projects are
located in areas with a long history of mining, including the Sunrise Lake project with a historic
resource of 12.8 Moz of silver (and 201.3 million pounds of zinc) Indicated and 13.9 Moz of silver
(and 247.8 million pounds of zinc) Inferred (1)(3) located in the Northwest Territories and the Plata
high grade silver project located 165 km east of Yukon’s prolific Keno Hill and adjacent to
Snowline Gold’s Rogue discovery. The Company’s Clear Lake Project in the Yukon Territory has a
historic resource of 5.5 Moz of silver and 1.3 billion pounds of zinc (2)(3). The Company also has a
significant land holding at the Nanisivik Mine Area located in Nunavut, Canada that produced
over 20 Moz of silver between 1976 and 2002 (2,3). A qualified person has not done sufficient work
to classify the foregoing historical resources as current mineral resources and the Company is not
treating the estimates as current mineral resources. The historical resource estimates are
provided solely for the purpose as an indication of the volume of mineralization that could be
present. Additional work, including verification drilling / sampling, will be required to verify any
of the historical estimates as a current mineral resources.
(1) Sunrise Lake 2003 RPA historic resource: Indicated 1.522 million tonnes grading 262 grams/tonne silver, 6.0% zinc, 2.4% lead,
0.08% copper, and 0.67 grams/tonne gold and Inferred 2.555 million tonnes grading 169 grams/tonne silver, 4.4% zinc, 1.9% lead,
0.07% copper, and 0.51 grams/tonne gold.
(2) Clear Lake 2010 SRK historic Resource: Inferred 7.76 million tonnes grading 22 grams/tonne silver, 7.6% zinc, and 1.08% lead.
(3) Geological Survey of Canada, 2002 -C22, “Structural and Stratigraphic Controls on Zn- Pb-Ag Mineralization at the Nanisivik
Mississippi Valley type Deposit, Northern Baffin Island, Nunavut; by Patterson and Powis.”
ON BEHALF OF THE BOARD
Dorian L. (Dusty) Nicol, CEO
For more information , please visit our website www.honeybadgersilver.com or contact Sonya
Pekar for Investor Relations | [email protected] |+1 (647) 498 - 8244
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
Cautionary Note Regarding Forward-Looking Information
This news release contains “forward- looking information” within the meaning of the applicable
Canadian securities legislation that is based on expectations, estimates, projections and
interpretations as at the date of this news release. Any statement that involves discussions with
respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives,
assumptions, future events or performance (often but not always using phrases such as “expects”,
or “does not expect”, “is expected”, “interpreted”, “management’s view”, “anticipates” or “does
not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends”
or variations of such words and phrases or stating that certain actions, events or results “may” or
“could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of
historical fact and may be forward- looking information and are intended to identify forward -
looking information. This forward -looking information is based on reasonable assumptions and
estimates of management of the Company at the time such assumptions and estimates were
made, and involves known and unknown risks, uncertainties and other factors which may cause
the actual results, performance or achievements of Honey Badger to be materially different from
any future results, performance or achievements expressed or implied by such forward- looking
information.
Such factors include, but are not limited to, risks relating to capital and operating costs varying
significantly from estimates; delays in obtaining or failures to obtain required governmental,
environmental or other project approvals; uncertainties relat ing to the availability and costs of
financing needed in the future; changes in equity markets; inflation; fluctuations in commodity
prices; delays in the development of projects; other risks involved in the mineral exploration and
development industry; and those risks set out in the Company’s public documents filed on SEDAR+
(www.sedarplus.ca) under Honey Badger’s issuer profile. Although the Company believes that the
assumptions and factors used in preparing the forward- looking information in this news re lease
are reasonable, undue reliance should not be placed on such information, which only applies as
of the date of this news release, and no assurance can be given that such events will occur in the
disclosed timeframes or at all. The Company disclaims an y intention or obligation to update or
revise any forward-looking information, whether as a result of new information, future events or
otherwise, other than as required by law.