Honey Badger Drills 1,025 g/t AgEq over 1.9 metres (true width), including 1,701 g/t AgEq over 1.1 metres (true width) at its Thunder Bay Silver-Cobalt Project
NEWS RELEASE
Honey Badger Drills 1,025 g/t AgEq over 1.9 metres (true width), including 1,701
g/t AgEq over 1.1 metres (true width) at its Thunder Bay Silver-Cobalt Project
TORONTO, July 18, 2019 -- Honey Badger Exploration Inc. (TSX-V: TUF) (“Honey Badger” or the “Company”) announces
assay results for the first 6 holes of its 2019 drilling program that was completed in June. The 2,000-metre drilling program was
a follow-up to the Company’s successful 2018 drilling program where significant high-grade silver mineralization, comprising
682 g/t silver over 1.1 metres (true width) including 1,254 g/t silver over 0.6 metres (true width) was intersected in the Beaver
Vein.
Four of the holes reported here were successful at extending, 35 metres down-dip, the high-grade silver mineralization of the
Beaver Vein. Furthermore, a second high-grade silver vein, distinct from the Beaver Vein, was intersected indicating that more
than one silver-containing vein set is likely in the vicinity of the Beaver Mine. Results for 8 holes are still pending.
Assay Highlights (Table 1):
• BM-19-014 intersected the Beaver Vein and contains 1,025 g/t AgEq over 4 metres (core length), including 1,701 g/t
AgEq over 2.4 metres (core length);
• BM-19-014 also intersected a second silver-bearing vein and contains 87.8 g/t AgEq over 1.8 metres (core length).
Quentin Yarie, President and CEO of Honey Badger stated: "The discovery and extension of high-grade silver in the Beaver
Vein is compelling and indicates that high-grade silver mineralization is continuous down-plunge over 35 metres. The southern
extension of that plunge direction in the Beaver Vein is entirely open and, contingent on successful drilling, may lead to the
definition of a high-grade silver deposit in the Beaver Vein.”
Table 1 - Assays results highlights for copper, silver and zinc from the 2019 drilling program
Hole From
(m)
To
(m)
Length
(m)
Estimated
true
width (m)
Pb (%) Zn (%) Ag (g/t) AgEq*
(g/t) Zone
BM-19-
009 Intersected Beaver Mine – no recovery
Beaver
Vein
BM-19-
010 Intersected Beaver Mine – no recovery
BM-19-
011 197.7 201.6 3.9 1.8 0.1 0.25 3.2 19.5
BM-19-
012 221.5 227.8 6.3 2.6 0.05 0.48 1.9 27.4
BM-19-
013 212.2 215.2 3 1.2 0.16 0.34 1.5 24.8
BM-19-
014
146.5 148.3 1.8 Unknown 0.11 0.29 69.2 87.8 New
Vein
179.3 183.3 4 1.9 0.11 0.33 1004 1025 Beaver
VeinIncluding
179.3 181.7 2.4 1.1 0.14 0.42 1674 1701
* AgEq = (Ag (g/t)*0.49$/(g/t) + Zn(wt.%)*24.61$/wt.% + Pb(wt.%)*19.74$/wt.%) / 0.54$/(g/t
Ag). Spot metal prices taken after market closure July 15, 2019
Table 2 – Attributes of the drill holes
Hole Id X Y Z Azimuth Dip Depth (m)
BM-19-
009 304439 5354991 381.7 275 -68 117
BM-19-
010 304439.3 5354990 381.2 205 -72 118.37
BM-19-
011 304488.1 5355057 379.1 215 -51.5 238
BM-19-
012 304488 5355056 379.1 203 -50 240
BM-19-
013 304510.1 5355012 384.7 256 -54 235
BM-19-
014 304345 5354944 374 107 -54 208
Figure 1. Location of reported drill holes: https://www.globenewswire.com/NewsRoom/AttachmentNg/8ecc2c1f-dca7-4770
-b3ea-8d5586f2353b
Honey Badger’s 2019 drilling program in the Beaver Mine area was testing the extension of the Beaver Vein below the
underground developments of the mine. The main objectives were to prove the continuity of the Beaver Vein below the mine, to
find the extension of high-grade silver intersected in BM-18-006 (682 g/t Ag over 1.1 metres true width) and to define the
possible plunge direction of that high-grade silver zone in the vein.
Drilling was successful in proving the continuity of the Beaver Vein and BM-19-014 successfully extended high-grade silver 35
metres down-plunge of the intersection in BM-18-006. Combined with the geometry of the Beaver Mine underground
developments, the intersections in BM-18-006 and BM-19-014 are suggesting a moderate southerly plunge as the main
direction of high-grade silver mineralization in the Beaver Vein. BM-19-014 is also the southernmost hole drilled in the high-
grade silver zone discovered in the Beaver Vein that is open down-plunge.
BM-19-014 may also have discovered the extension of the high-grade silver vein intersected in BM-18-004 (921 g/t silver over
1.4 metres) and is hosted in a structure distinct from the Beaver Vein. Although more drilling remains necessary to constrain
the geometry of that vein, the intersections in BM-19-004 and BM-19-014 indicates that, in addition to the Beaver Vein, other
vein sets in the vicinity of the Beaver Vein also contain high-grade silver zones.
Holes BM-19-009 and BM-19-010 were drilled in the footprints of the underground development of the Beaver Mine and
intersected the mine. Holes BM-19-011 and BM-19-013 were testing the extension of the Beaver Vein north of the high-grade
intersection in BM-18-006, whereas hole BM-19-012 was testing the Beaver Vein down-dip of the high-grade intersection in BM
-18-006. All the holes successfully intersected the Beaver Vein and contain anomalous silver, lead and zinc mineralization.
About the Thunder Bay Silver-Cobalt Project
Honey Badger’s Thunder Bay Silver-Cobalt Project is comprised of the Beaver Silver, Silver Mountain, and Mink Mountain
Silver properties, covers more than 37,850 hectares and includes twelve past-producing high-grade mines with historical
production of more than 1.67M oz silver. The project is located on the Lakehead Region, 25 to 70 kilometres southwest of
Thunder Bay, Ontario. It is easily accessible and close to infrastructure.
There are two main polymetallic vein groups in the Lakehead Region - the Mainland and Island vein groups that were
historically mined for silver, cobalt, copper, nickel, lead and zinc. Some of the veins also produced gold. The Island Vein group
produced a total of 3,188,297 oz silver with most of that production coming from the Silver Islet Mine. The Mainland Group of
silver veins produced 1,991,314 oz silver. The polymetallic silver veins in the region are most often found hosted in sediments,
most notably the upper Rove Unit, near or within diabase intrusions. This geological setting parallels the other major silver
district in Ontario - the Cobalt Silver District.
Honey Badger is the early mover in consolidating key ground in this historic silver camp that has strong potential for
polymetallic mineralization. The Company initiated its exploration program in March 2018, and has made several promising
discoveries since:
• Geophysics and drilling uncovered >2 km “five-element” veins (polymetallic veins that can contain, amongst others,
silver, cobalt, copper, nickel, lead and zinc) at the Beaver Mine;
• Airborne geophysics identified numerous targets on the project’s land package that exhibit the same response as the
historic Beaver Mine “five-element” vein; and
• Assay results from the 2018 drilling program discovered a wide and near-surface zone of high-grade cobalt
mineralization in the Rove Shale, near the historic Beaver Mine (0.26% Cobalt over 10.8 metres) and identified high-
grade silver mineralization below the lower-most level of the Beaver Mine (682 g/t silver over 2.4 metres, including 1,254
g/t silver over 1.2 metres core length).
On-site Quality Assurance/Quality Control (“QA/QC”) Measures
Drill core samples were transported in security-sealed bags for analyses to Activation Laboratories Ltd. in Thunder Bay,
Ontario. Individual samples are labeled, placed in plastic sample bags and sealed. Groups of samples are then placed into
durable rice bags that were delivered by Honey Badger to the lab in Thunder Bay. The remaining coarse reject portions of the
samples remain in storage if further work or verification is needed.
Qualified Person
Quentin Yarie, P Geo. is the qualified person responsible for preparing, supervising and approving the scientific and technical
content of this news release.
About Honey Badger Exploration Inc.
Honey Badger Exploration is a gold and base-metals exploration company headquartered in Toronto, Ontario, Canada with
properties in Quebec and Ontario. The Company’s common shares trade on the TSX Venture Exchange under the symbol
“TUF”.
For more information, please visit our website at http://www.honeybadgerexp.com.
Or contact:
Quentin Yarie, President & CEO, (416) 364-7029, [email protected]
or
Mia Boiridy, Investor Relations, (416) 364-7029, [email protected]
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
This News Release contains forward-looking statements. In some cases, you can identify forward-looking statements by
terminology such as “may”, “should”, “expects”, “plans”, “anticipates”, “believes”, “estimates”, “predicts”, “potential” or
“continue” or the negative of these terms or other comparable terminology. These statements are only predictions and involve
known and unknown risks, uncertainties and other factors that may cause our or our industry’s actual results, levels of
activity, performance or achievements to be materially different from any future results, levels of activity, performance or
achievements expressed or implied by these forward-looking statements.
Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this
news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of
this news release. The Company disclaims any intention or obligation to update or revise any forward-looking information,
whether as a result of new information, future events or otherwise, other than as required by law.