Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TUD.V ·

Tudor Gold Intersects 2.57 g/t Gold Equivalent over 54.00 Meters at Treaty Creek, Northwest British Columbia

Drill Results

Tudor Gold Intersects 2.57 g/t Gold Equivalent

over 54.00 Meters at Treaty Creek, Northwest

British Columbia

Vancouver, British Columbia--(Newsfile Corp. - September 8, 2025) - Tudor Gold Corp.

(TSXV: TUD)

(FSE: H56)

(the "

Company

" or "

Tudor

") is pleased to announce the results from the first two drill-holes

completed from the 2025 exploration drilling program (the "

Program

") at its 80%-owned Treaty Creek

Project, located in the heart of the Golden Triangle of Northwestern British Columbia.

Drilling Highlights

:

Hole GS-25-188

intersected a 45-meter ("m") northward step-out of the 300N Zone and a potential SC-

1 Zone structural corridor. Highlights of the mineralized intercept:

2.57 g/t gold equivalent ("AuEQ") over 54.00 m

(2.31 g/t Au, 16.98 g/t Ag, 0.07% Cu), including

5.64 g/t AuEQ over 6.00 m

(4.07 g/t Au, 99.86 g/t Ag, 0.45% Cu)

11.16 g/t AuEQ over 1.50 m

(5.90 g/t Au, 343.00 g/t Ag, 1.45% Cu)

Hole GS-25-189

intersected a robust interval of the CS-600 Zone, and intersected several higher-grade

intervals above and below CS-600 Zone mineralization.

7.06 g/t AuEQ over 3.00 m

(7.01 g/t Au, 4.22 g/t Ag, 0.01% Cu)

1.29 g/t AuEQ over 204.00 m

(0.65 g/t Au, 4.78 g/t Ag, 0.48% Cu)

4.14 g/t AuEQ over 10.20 m

(3.72 g/t Au, 6.04 g/t Ag, 0.29 % Cu

), including 6.29 g/t AuEQ

over 3.50 m

(5.81 g/t Au, 1.00 g/t Ag, 0.38% Cu)

Click the following links to view a

plan map

and

cross sections

for holes GS-25-188 and GS-25-189.

GS-25-188 was drilled to step out from previously drilled 300 North Zone ("300N") mineralization at an

azimuth more favorable to cross cutting and identifying SC-1 Zone structural corridors.

This drill hole

expands the mineralized footprint of 300N by 45 m to the north and the intercepted mineralization occurs

along a structural orientation similar to the previously identified four sub-parallel gold-bearing breccia

systems of the SC-1 Zone.

See Table 1 below.

GS-25-189 was drilled to identify potential high-grade mineralization occurring between previous

intercepts included in the SC-1 Zone and 300N and to infill a strongly mineralized section of the CS-600

Zone. The hole intersected high-grade gold mineralization (7.01 g/t gold over 3.0 m) within an area

occurring between the SC-1 Zone and 300N Domains, which was expected to host additional high-

grade mineralized corridors. The drillhole continued through the CS-600 Zone with an extensive

mineralized intercept before intersecting a high-grade gold (5.81 g/t gold over 3.5 m) potential 170-m

stepout to the SC-1 Zone.

See Table 1 below.

The SC-1 Zone was identified and expanded throughout the 2024 drilling campaign to represent a

significant potential economic target that is within, and peripheral to, the CS-600 Zone (see press

release dated December 16, 2024). The drill results from GS-25-188 and -189 indicate strong potential

for additional high-grade structural corridors and may require the reinterpretation of 300N as additional

high-grade SC-1 Zone like structures.

Ken Konkin, P.Geo., Senior Vice-President, Exploration:

"The discovery of another high-grade

hydrothermal breccia stockwork system between the previously identified corridors demonstrates the

potential for the continuity for high-grade gold at depth at Treaty Creek. The 300 North Zone appears

to share the similar trend as the previously discovered high-grade SC-1 Zone. With our underground

development permit filed, we plan to fill-in the gaps between 300N and the SC-1 Zone with more

efficient and cost-effective underground drilling."

Table 1: Select Drill Results for Holes GS-25-188 and GS-25-189

Hole

Collar

Coords

Dip/

Azimuth

From

(m)

To

(m)

Interval

(m)

Gold

(g/t)

Silver

(g/t)

Copper

(%)

AuEQ

(3)

(g/t)

GS-25-188

429024 mE

6273658 mN

-62/283

900.00

954.00

54.00

2.31

16.98

0.07

2.57

Including

900.00

906.00

6.00

4.07

99.86

0.45

5.64

and

901.50

903.00

1.50

5.90

343.00

1.45

11.16

GS-25-189

429024 mE

6273658 mN

-71/293

836.00

845.00

9.00

2.45

0.94

0.01

2.48

882.50

885.50

3.00

7.01

4.22

0.01

7.06

1130.00

1334.00

204.00

0.65

4.78

0.48

1.29

1355.40

1365.60

10.20

3.72

6.04

0.29

4.14

Including

1357.50

1361.00

3.50

5.81

1.00

0.38

6.29

• All assay values are uncut and intervals reflect drilled intercept lengths.

•

HQ and NQ diameter core samples were sawn in half and typically sampled at standard 1.5 m intervals.

•

The following metal prices were used to calculate the Au Eq metal content: Gold $1850/oz, Ag: $21/oz, Cu: $3.75/lb. Calculations used the formula

AuEQ = Au g/t + (Ag g/t*0.0100901) + (Cu ppm*0.0001236). All metals are reported in USD and calculations consider recoveries of 90 % for gold, 80 %

for copper, and 80 % for silver.

•

True widths have not been determined as the mineralized body remains open in all directions. Further drilling is required to determine the mineralized

body orientation and true widths.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4494/265493_planmap2025-09-08.jpg

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4494/265493_sections2025-09-08jpg.jpg

Tudor also announces that the Company has agreed to issue 422,874 common shares of the Company

(the "Settlement Shares") to INFOR Financial Inc. ("INFOR") at a price of $0.69 per Settlement Share in

settlement (the "Debt Settlement") of $291,783.46 owing by American Creek Resources Ltd. ("AMK"), a

wholly owned subsidiary of the Company, to INFOR pursuant to a financial advisory agreement dated

May 26, 2025 between AMK and INFOR.

The Debt Settlement is subject to TSX Venture Exchange approval. The Settlement Shares will be

subject to a statutory hold period of four months from the date of issuance, in accordance with applicable

securities legislation.

Qualified Person

The Qualified Person for this news release for the purposes of National Instrument 43-101 is the

Company's President and CEO, Ken Konkin, P. Geo. He has read and approved the scientific and

technical information that forms the basis for the disclosure contained in this news release.

QA/QC

Diamond drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and

assayed at MSA Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are

monitored by the submission of blanks, certified standards and duplicate samples inserted at regular

intervals into the sample stream by Tudor Gold personnel. MSA Laboratories quality system complies

with the requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is

independent of the Company.

About Treaty Creek

The Treaty Creek Project hosts the Goldstorm Deposit, comprising a large gold-copper porphyry

system, as well as several other mineralized zones. As disclosed in the

"NI-43-101 Technical Report for

the Treaty Creek Project", dated April 5, 2024 prepared by Garth Kirkham Geosystems and JDS Energy

& Mining Inc., the Goldstorm Deposit has an

Indicated Mineral Resource of

27.87 million ounces

(Moz) of AuEQ

grading 1.19 g/t AuEQ (21.66 Moz gold grading 0.92 g/t, 2.87 billion pounds (Blbs)

copper grading 0.18%,

128.73 Moz silver grading 5.48 g/t) and an

Inferred Mineral Resource of 6.03

Moz of AuEQ

grading 1.25 g/t AuEQ (4.88 Moz gold grading 1.01 g/t, 503.2 Mlb copper grading

0.15%, 28.97 Moz silver grading 6.02 g/t), with a pit constrained cut-off of 0.7 g/t AuEQ and an

underground cut-off of 0.75 g/t AuEQ. The Goldstorm Deposit remains open in all directions and

requires further exploration drilling to determine the size and extent of the Deposit.

About Tudor Gold

Tudor Gold Corp. is a precious and base metals exploration and development company with claims in

British Columbia's Golden Triangle (Canada), an area that hosts producing and past-producing mines

and several large deposits that are approaching potential development. The 17,913 hectare Treaty

Creek Project (in which Tudor Gold has an 80% interest) borders Seabridge Gold Inc.'s KSM property to

the southwest and borders Newmont Corporation's Brucejack Mine property to the southeast.

For further information, please visit the Company's website at

www.tudor-gold.com

or contact:

Joseph Ovsenek

President & CEO

(778) 731-1055

Tudor Gold Corp.

Suite 789, 999 West Hastings Street

Vancouver, BC

V6C 2W2

[email protected]

(SEDAR+ filings: Tudor Gold Corp.)

Chris Curran

Vice President of Investor Relations and Corporate

Development

(604) 559 8092

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Statements regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian

securities legislation. "Forward-looking information" includes, but is not limited to, statements with

respect to the activities, events or developments that the Company expects or anticipates will or may

occur in the future, including the completion and anticipated results of planned exploration activities.

Generally, but not always, forward-looking information and statements can be identified by the use of

words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts",

"intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words

and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be

taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including

among others, that the Company's planned exploration activities will be completed in a timely

manner. Although the assumptions made by the Company in providing forward-looking information or

making forward-looking statements are considered reasonable by management at the time, there can

be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and

future events could differ materially from those anticipated in such statements. Important factors that

could cause actual results to differ materially from the Company's plans or expectations include risks

relating to the actual results of current exploration activities, fluctuating gold prices, possibility of

equipment breakdowns and delays, exploration cost overruns, availability of capital and financing,

general economic, market or business conditions, regulatory changes, timeliness of government or

regulatory approvals and other risks detailed herein and from time to time in the filings made by the

Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in the forward-looking information or implied by forward-looking

information, there may be other factors that cause results not to be as anticipated, estimated or

intended. There can be no assurance that forward-looking information and statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated, estimated

or intended. Accordingly, readers should not place undue reliance on forward-looking statements or

information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking

statements whether as a result of new information, future events or otherwise except as otherwise

required by applicable securities legislation.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/265493