Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TUD.V ·

Tudor Gold Infill Drilling Confirms Excellent Continuity of Mineral Domains, with a Near- Surface Intercept of 1.09 g/t Gold Eq over 476.1 m (GS-21-124 300H) and 1.22 g/t Gold Eq over 355.15 m (GS-21-122 CS600) Including

Drill Results

Tudor Gold Infill Drilling Confirms Excellent

Continuity of Mineral Domains, with a Near-

Surface Intercept of 1.09 g/t Gold Eq over

476.1 m (GS-21-124 300H) and 1.22 g/t Gold Eq

over 355.15 m (GS-21-122 CS600) Including

1.45 g/t Gold Eq over 247.5 m

Vancouver, British Columbia--(Newsfile Corp. - December 15, 2021) - Tudor Gold Corp. (

TSXV: TUD

)

(

FSE: TUC

) (the "

Company

" or "

Tudor Gold"

) is pleased to present the most recent drill results from

the 30,108 meter, 2021 resource expansion and definition drilling program for the Goldstorm Deposit at

their flagship property, Treaty Creek (the

"Project"

), located within the Golden Triangle of Northwest

British Columbia.

Included in this press release are the results of four diamond drill holes that were completed at the

Goldstorm Deposit along two sections (112+00 NE and 115+00 NE), 300 metres apart. These results

demonstrate the excellent continuity of precious and base-metal mineralization that has been measured

throughout the Goldstorm deposit and provides increased drill hole density for future resource

determinations. The Copper Belle-Goldstorm Deposit (CB-GS) currently hosts a

1

*NI 43-101

compliant

Measured and Indicated Mineral Resource of 19.4 million ounces of AuEq grading 0.74 g/t AuEq and an

Inferred Resource of 7.9 million ounces of AuEq grading 0.79 g/t AuEq (see Tudor Gold press release

dated March 9, 2021

).

Goldstorm Drilling Highlights Include:

SECTION 115+00 NE

GS-21-122

provided closer hole spacing between previous intercepts of the deep, northwest

extension of the CS600 domain. The hole averaged

0.65 g/t AuEq over 1,035.0 m,

which

included both the 300H and CS600 domains.

GS-21-122

encountered consistent gold and copper mineralization within the CS600 domain that

returned

1.22 g/t AuEq (0.65 g/t Au and 0.45 % Cu) over 355.15 m

, including an enriched

portion that averaged

1.45 g/t AuEq (0.79 g/t Au and 0.53 % Cu) over 247.5 m.

GS-21-122

ended at 1375 m in gold mineralization, which may have been the start of the DS5

domain. The drill had reached its' maximum depth capacity.

GS-21-126

, stepping out to the southeast, was stopped before the target due to drilling issues.

This hole will be re-drilled in 2022.

SECTION 112+00 NE

GS-21-123

was designed to provide infill resource definition for the center of the CS600 domain.

Unfortunately, this hole was not completed to the target depth and ended in mineralization. A

portion of the CS600 domain was intersected, which

averaged 1.22 g/t AuEq (0.61 g/t Au and

0.45 % Cu) over 38.8 m

at the end of the hole.

The upper portion of

GS-21-123

intersected consistent gold mineralization within the 300H domain

with

0.90 g/t AuEq over 201.0 m

that contained an enriched zone that graded

1.31 g/t AuEq

over 49.9 m

near the center of 300H domain.

GS-21-124

cut an intercept of the 300H domain that infilled and defined the deposit to the

northwest just beneath the TTF1 thrust fault. This hole averaged

0.75 g/t AuEq over 1,089.0 m

.

A Near-surface

, enriched section of 300H was encountered in

GS-21-124,

grading

1.50 g/t

AuEq over 126.0 m, within a 476.1 m interval that averaged

1.09 g/t AuEq.

Tudor Gold's Vice President of Exploration and Project Development, Ken Konkin, P.Geo.,

states:

"We are pleased to report that the resource definition-drilling of the Goldstorm Deposit was a

great success. In addition to expanding the limits of the precious and base-metal mineralization to the

northwest, north and northeast, we were able to infill gaps in the resource model with carefully placed drill

holes that were designed to add gold-equivalent ounces to the measured and drill indicated categories.

In addition, these results demonstrate the strong consistency of the gold-copper mineralization between

holes

GS-21-122 and GS-21-124 that are approximately 500 meters apart; the overall results are

very comparable: GS-21-122 averaged 0.65 g/t AuEq over 1,035 meters while GS-21-124

averaged 0.75 g/t AuEq over 1,089 meters

. We expect to complete the final sections for the last four

drill holes and combine this with our final surface sampling results for our next press release."

The complete list of these reported composited drilling results for Goldstorm, as well as the drill hole

data, including hole location, elevation, depth, dip and azimuth, are provided in Table 1 and Table 2,

respectively. Please click on the following link to view:

Plan Map and Cross Sections for the drilling and

surface samples reported in this news release

.

Table 1: Drilling Results Goldstorm in Press Release December 15, 2021

Section

Hole

From (m)

To (m)

Interval (m)

Au (g/t)

Ag (g/t)

Cu (ppm)

AuEQ (g/t)

115+00 NE

GS-21-122

193.00

1228.00

1035.00

0.42

2.39

1687

0.65

Including (300H)

193.00

346.00

153.00

0.61

3.37

111

0.66

And including (CS600)

872.85

1228.00

355.15

0.65

3.69

4453

1.22

With

916.00

1163.50

247.50

0.79

3.10

5282

1.45

115+00 NE

GS-21-126

(1)

NSV

112+00 NE

GS-21-123

(2)

135.50

878.00

742.50

0.46

2.16

500

0.54

Including (300H)

270.50

471.50

201.00

0.84

2.75

170

0.90

With

271.60

321.50

49.90

1.25

3.39

157

1.31

And (CS600)

839.20

878.00

38.80

0.61

7.51

4461

1.22

112+00 NE

GS-21-124

(3)

33.00

1122.00

1089.00

0.69

3.18

195

0.75

Including (300H)

33.00

509.10

476.10

1.02

3.68

225

1.09

With

378.00

504.00

126.00

1.42

3.62

311

1.50

(1)

Hole ended prior to reaching target mineralization; no significant values (NSV).

(2)

Hole ended in mineralization, shut down before reaching target depth due weather conditions.

(3)

Hole ended in mineralization, shut down due to drilling issues.

All assay values are uncut and intervals reflect drilled intercept lengths.

HQ and NQ2 diameter core samples were sawn in half and typically sampled at standard 1.5m intervals

The following metal prices were used to calculate the Au Eq metal content: Gold $1625/oz, Ag: $19/oz, Cu: $2.8/lb. Calculations used the

formula Au Eq g/t = (Au g/t) + (Ag g/t x 0.01169) + (Cu% x 1.1815). All metals are reported in USD and calculations do not consider metal

recoveries.

True widths have not been determined as the mineralized body remains open in all directions. Further drilling is required to determine the

mineralized body orientation and true widths.

Table 2: Drill data for holes in Press Release December 15, 2021

Section

Hole ID

UTM E NAD 83

UTM N NAD 83

Elevation (m)

Azi (ᵒ)

Dip (ᵒ)

Depth (m)

115+00 NE

GS-21-122

428804.9

6273270.2

1326.1

285

-62

1375

115+00 NE

GS-21-126

429104.7

6273040.3

1226.8

295

-85

318.7

112+00 NE

GS-21-123

428658.3

6273196.9

1369.5

220

-75

878

112+00 NE

GS-21-124

428548.3

6272852.6

1260.0

310

-45

1122

The Company wishes to announce, that under section 182(4) of the Business Corporations Act, the

Registrar of Companies has allowed Tudor to extend the time within which they are required to hold their

AGM for the year 2021 by six (6) months from December 31, 2021 to June 30, 2022.

Qualified Person

The Qualified Person for this news release for the purposes of National Instrument 43-101 is the

Company's Vice President of Exploration and Project Development, Ken Konkin, P.Geo. He has read

and approved the scientific and technical information that forms the basis for the disclosure contained in

this news release.

QA/QC

Diamond drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and

assayed at MSA Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are

monitored by the submission of blanks, certified standards and duplicate samples inserted at regular

intervals into the sample stream by Tudor Gold personnel. MSA Laboratories quality system complies

with the requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is

independent of the Company.

About Tudor Gold

TUDOR GOLD Corp. is a precious and base metals exploration and development company with

properties in British Columbia's Golden Triangle (Canada), an area that hosts producing and past-

producing mines and several large deposits that are approaching potential development. The 17,913

hectare Treaty Creek project (in which TUDOR GOLD has a 60% interest) borders Seabridge Gold

Inc.'s KSM property to the southwest and borders Pretium Resources Inc.'s Brucejack property to the

southeast. In April 2021 Tudor published their 43-101 technical report, "Technical Report and Initial

Mineral Resource Estimate of the Treaty Creek Gold Property, Skeena Mining Division, British

Columbia Canada" dated March 1, 2021 on the Company's Sedar profile. The Company also has a

100% interest in the Crown project and a 100% interest in the Eskay North project, all located in the

Golden Triangle area.

ON BEHALF OF THE BOARD OF DIRECTORS OF

TUDOR GOLD CORP.

"Walter Storm"

Walter Storm

President and Chief Executive Officer

For further information, please visit the Company's website at

www.tudor-gold.com

or contact:

Chris Curran

Head of Corporate Development and Communications

Phone: (604) 559 8092

E-Mail:

[email protected]

or

Carsten Ringler

Head of Investor Relations and Communications

Phone:

+49 151 55362000

E-Mail:

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Statements regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian

securities legislation. "Forward-looking information" includes, but is not limited to, statements with

respect to the activities, events or developments that the Company expects or anticipates will or may

occur in the future, including the completion and anticipated results of planned exploration activities.

Generally, but not always, forward-looking information and statements can be identified by the use of

words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts",

"intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words

and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be

taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including

among others, that the Company's planned exploration activities will be completed in a timely

manner. Although the assumptions made by the Company in providing forward-looking information or

making forward-looking statements are considered reasonable by management at the time, there can

be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and

future events could differ materially from those anticipated in such statements. Important factors that

could cause actual results to differ materially from the Company's plans or expectations include risks

relating to the actual results of current exploration activities, fluctuating gold prices, possibility of

equipment breakdowns and delays, exploration cost overruns, availability of capital and financing,

general economic, market or business conditions, regulatory changes, timeliness of government or

regulatory approvals and other risks detailed herein and from time to time in the filings made by the

Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in the forward-looking information or implied by forward-looking

information, there may be other factors that cause results not to be as anticipated, estimated or

intended. There can be no assurance that forward-looking information and statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated, estimated

or intended. Accordingly, readers should not place undue reliance on forward-looking statements or

information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking

statements whether as a result of new information, future events or otherwise except as otherwise

required by applicable securities legislation.

Goldstorm Section Areas - Plan View

To view an enhanced version of this map, please visit:

https://orders.newsfilecorp.com/files/4494/107653_tudorfigure1.jpg

Section 115+00 NE Viewing Northeast

To view an enhanced version of this map, please visit:

https://orders.newsfilecorp.com/files/4494/107653_tudorfigure2.jpg

Section 112+00 NE Viewing Northeast

To view an enhanced version of this map, please visit:

https://orders.newsfilecorp.com/files/4494/107653_tudorfigure3.jpg

1

* In April 2021 Tudor published a NI 43-101 technical report, "Technical Report and Initial Mineral

Resource Estimate of the Treaty Creek Gold Property, Skeena Mining Division, British Columbia

Canada" dated March 1, 2021 on the Company's Sedar profile.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/107653