Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TUD.V ·

Tudor Gold Discovers a Significant New Gold- Silver-Copper Mineralized System at the Perfectstorm (PSZ) at Treaty Creek as well as Expands the Goldstorm Mineralization Along the Northeast Axis to 1100 meters Drill Hole GS-20-73 Expands the 300 Horizon with a 229.5 meter Intercept Averaging 1.506 gpt

Drill Results

Tudor Gold Discovers a Significant New Gold-

Silver-Copper Mineralized System at the

Perfectstorm (PSZ) at Treaty Creek as well as

Expands the Goldstorm Mineralization Along

the Northeast Axis to 1100 meters

Drill Hole GS-20-73 Expands the 300 Horizon with a 229.5 meter Intercept Averaging 1.506 gpt

AuEq Within a 775.5 meter Interval Averaging 0.932 gpt AuEq

Drill Hole GS-20-66 Expands the CS-600 System 100 metres to the Southeast with a 75 meter

Intercept Averaging 2.150 gpt AuEq

Vancouver, British Columbia--(Newsfile Corp. - September 9, 2020) -

Tudor Gold Corp. (TSXV: TUD)

(FSE: TUC) (the "

Company

" or "

Tudor Gold

") is pleased to announce that it has completed the third

set of diamond drill holes at their flagship property, Treaty Creek located in the heart of the Golden

Triangle of Northwestern British Columbia. Diamond drilling is progressing very well with six diamond

drill rigs currently working on the Goldstorm Zone which is on-trend from Seabridges' KSM Project to the

southwest.

Three drill holes have intersected the newly discovered gold-dominant

PSZ System

located

approximately 2 kilometers southwest of the Goldstorm Zone. These diamond drill holes targeted a 1.5

kilometer-wide geophysical anomaly (magnetometer high). Tudor Gold has discovered this new thrust-

hosted porphyry-style gold-copper-silver bearing system on trend, and approximately 4 km northeast

from Seabridges' Iron Cap Deposit, which is located at the southwestern boundary of the Tudor Claim

block.

Furthermore, diamond drilling on the Goldstorm System has successfully expanded the mineralization to

the northeast, southwest and southeast as well to depth. The Goldstorm System 300 Horizon has now

been traced for 1100 meters along the northeast axis.

Goldstorm Drilling Highlights include:

Five diamond drill holes are reported from Goldstorm, all having hit their intended targets

with favorable results listed in Table l.

The best intercept was from drill hole GS-20-73 on Section 110+00 NE that cut

775.5

metres (29.0m to 804.5 m) averaging 0.932 gpt AuEq containing an enriched portion that

averaged 1.506 gpt AuEq over 229.5 meters ( 519.5m to 749.0 m). This was a southwest

offset to drill hole GS-20-57 that averaged 1.40 gpt AuEq over 217.5 meters (544.5 to 762.0

meters) within an overall composite averaging 0.845 gpt AuEq over 973.05m (34.50 to

1007.55 meters). (GS-20-57 was collared on Section 110+00 but deviated drastically to the

northeast and the lower portion plotted on Section 111+00 NE leaving a gap in the drill

model which GS-20-73 has now filled).

A second longer intercept from GS-20-73 includes material that averaged 0.828 gpt AuEq

from a 949.5 meter intercept (29.0 to 978.5 meters) but the hole was abandoned at 980

meters due to safety concerns with the drill platform so hole GS-20-73 WAS STOPPED IN

MINERALIZATION. However, the results from entire hole composites are extremely

consistent between GS-20-57 (0.845 gpt AuEq over 973.05 meters) and GS-20-73 (0.827

gpt AuEq over 949.5 meters).

Drill hole GS-20-73 is undercut by GS-20-65; a remarkable 348 meter intercept of 2.120 gpt

AuEq within a larger 930 meter intercept of 1.161 gpt AuEq (Press Release July 27th,

2020), which is currently the best intercept on the project to-date.

Tudor expanded the CS-600 Zone 100m to the southeast on Section 109+00 NE with a 75

meter intercept averaging 2.150 gpt AuEq in hole GS-20-66.

GS-20-67 on Section 114+00 NE deviated drastically to the north thereby extending the

length of the northeast axis of the 300 Horizon to 1100 meters. This hole also ended in

mineralization with the last 15 meters (1325m to 1340m) averaging 0.905 gpt AuEq within

a strong quartz stockwork zone similar to the DS-5 stockwork system found at the

bottom of GS-19-47 (243 meters averaging 0.996 gpt AuEq).

See Section 114+00 NE

attached below.

Notable increase to silver grades occurred within GS-20-73

.

A 78 meter intercept (534.5m

to 612.5m) had elevated silver grades averaging 26.3 gpt Ag associated with 1.588 gpt

gold.

Tudor Gold's Vice President of Project Development, Ken Konkin, P.Geo., states:

"We are very

pleased to have intersected significant gold-copper-silver porphyry-related mineralization within a large

magnetic anomaly called Perfectstorm (PSZ). This magnetic anomaly is located along a relatively evenly

spaced frequency of large deposits following the Treaty-Sulphuretes Thrust Fault, approximately mid-way

between the Iron Cap Deposit to the southwest and our Goldstorm System to the northeast. Results

obtained from PS-20-01 and PS-20-02 on Section 89+00 NE demonstrate the consistency within these

two drill holes completed off the same drill pad. PS-20-01 intersected 0.594 gpt AuEq over 133.5

meters while PS-20-02 intersected 151 meters of 0.621 gpt AuEq. The third PSZ System drill hole was

a 300 meter step-out to the southwest and this hole (PS-20-03) intersected 220.5 meters of 0.402 gpt

AuEq on Section 86+00 NE. The results suggest that the system is open to expansion to the southwest

and to the northwest. The exploration target area is at least 1.5 kilometers long and 500-800 meters

wide. We are very excited to see the results confirming that large mineralized polymetallic systems occur

at a predictable frequency along the Sulphuretes-Treaty Thrust Fault belt.

We are planning an aggressive

diamond drill-hole program for 2021 to further expand the limits of the PSZ System's potential

mineralization, searching for the center of the metal pile as we have successfully done with the

Goldstorm System."

The two tables below provide the complete list of composite results from the eight drill holes reported, as

well as the drill hole data including hole location, elevation, depth, dip and azimuth. Perfectstorm

Sections 86+00 NE and 89+00 NE with Goldstorm Sections 109+00 NE, 110+00 NE and 114+00 NE

are attached below along with corresponding plan maps (also available on the Company's website).

Table l

Gold equivalent composite values from five Goldstorm Zone holes and three PSZ drill holes.

Section

HOLE

Horizon

From

To

Interval

(m)

Au

(gpt)

Ag

(gpt)

Cu

(ppm)

AuEq

(gpt)

109+00 NE

GS-20-66

300H+CS600

6.0

529.5

523.5

0.673

1.86

425

0.758

109+00 NE

GS-20-66

including

300H

7.5

156.5

149.0

0.941

3.29

190

1.008

109+00 NE

GS-20-66

including CS-

600

454.5

529.5

75.0

2.075

1.87

352

2.150

109+00 NE

GS-20-68

300

4.85

798.0

793.15

0.521

1.73

127

0.561

109+00 NE

GS-20-68

including

300H

4.85

62.0

57.15

1.026

1.11

60

1.048

109+00 NE

GS-20-68

&

including

300H

221.0

536.0

315.0

0.744

1.82

135

0.785

109+00 NE

GS-20-72

300H

4.5

730.5

726.0

0.475

1.53

97

0.507

110+00 NE

GS-20-73

330H

29.0

804.5

775.5

0.842

5.47

160

0.932

110+00 NE

GS-20-73

or 330H

29.0

978.5

949.5

0.749

4.67

152

0.828

110+00 NE

GS-20-73

including

29.0

80.0

51.0

1.276

6.52

168

1.379

110+00 NE

GS-20-73

& including

519.5

749.0

229.5

1.338

11.94

170

1.506

114+00 NE

GS-20-67

300H

62.0

68.0

6.0

1.799

0.88

100

1.824

114+00 NE

GS-20-67

and 300H

126.5

908.0

781.5

0.486

2.99

238

0.557

114+00 NE

GS-20-67

including

300H

321.5

591.5

270.0

0.618

5.20

492

0.754

114+00 NE

GS-20-67

and 300

1325.0

1340.0

15.0

0.860

1.64

175

0.905

89+00 NE

PS-20-01

Main

240.0

373.5

133.5

0.483

2.75

527

0.594

89+00 NE

PS-20-01

including

240.0

320.5

80.5

0.573

4.11

775

0.737

89+00 NE

PS-20-02

Main

265.5

416.5

151.0

0.514

3.16

469

0.621

89+00 NE

PS-20-02

including

300.5

350

49.5

0.781

6.71

648

0.957

86+00 NE

PS-20-03

Main

152.0

372.5

220.5

0.293

1.78

591

0.402

86+00 NE

PS-20-03

including

Upper

152.0

171.5

19.5

0.885

0.82

160

0.919

86+00 NE

PS-20-03

including

Lower

348.5

371

22.5

0.846

3.73

340

0.942

All assay values are uncut and intervals reflect drilled intercept lengths.

HQ and NQ2 diameter core samples were sawn in half and typically sampled at standard 1.5m

intervals.

The following metal prices were used to calculate the Au Eq metal content: Gold $1322/oz, Ag:

$15.91/oz, Cu: $2.86/lb. Calculations used the formula Au Eq g/t = (Au g/t) + (Ag g/t x 0.012) +

(Cu% x 1.4835). All metals are reported in USD and calculations do not consider metal recoveries.

True widths have not been determined as the mineralized body remains open in all directions.

Further drilling is required to determine the mineralized body orientation and true widths.

Table lI Drill Hole Data

Table lI

To view an enhanced version of Table II, please visit:

https://orders.newsfilecorp.com/files/4494/63463_tudortable2ehanced.jpg

Walter Storm, President and CEO

,

stated

: "We are delighted to see continued success from the

Treaty Creek drill program. Not only are we getting excellent results from all the drill holes completed this

year, we have also discovered a new mineralized system at Perfectstorm. This demonstrates the

remarkable potential that our flagship property holds. However, we must now focus all our exploration

efforts on completing the drilling at Goldstorm. We intend to continue our 150 meter step-outs to the

northeast on Section 115+50 NE as well as expand the drilling to the southeast and northwest along

Sections 110+00 NE, 111+00 NE, 112+50 NE and 114+00 NE. The Goldstorm System remains open in

all directions and at depth."

Tudor Gold Corp and our associated service companies have taken extreme measures to maintain the

highest professional standards while working within COVID-19 health and safety protocols. Only

essential personnel are permitted to enter the camp and staging areas. Of those who are at the project

site and staging site, we have strict daily monitoring of the workers' temperatures and general health

conditions. We have a certified paramedic at the staging area to examine all in-coming and out-going

Tudor personnel and all service providers.

QA/QC

Drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and assayed at

MSA Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are monitored by

the submission of blanks, certified standards and duplicate samples inserted at regular intervals into the

sample stream by Tudor Gold personnel. MSA Laboratories quality system complies with the

requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is independent of the

Company.

Qualified Person

The Qualified Person for this news release for the purposes of National Instrument 43-101 is the

Company's Vice President Project Development, Ken Konkin, P.Geo. He has read and approved the

scientific and technical information that forms the basis for the disclosure contained in this news release.

About Tudor Gold

Tudor Gold is a precious and base metals explorer with properties in British Columbia's Golden

Triangle, an area that hosts producing and past-producing mines and several large deposits that are

approaching potential development. The 17,913 hectare Treaty Creek project (in which Tudor Gold has

a 60% interest) borders Seabridge Gold Inc.'s KSM property to the southwest and borders Pretium

Resources Inc.'s Brucejack property to the southeast. The Company also has a 100% interest in the

Electrum Project, earn in options and 100% interests in other prospective projects located in the Golden

Triangle area.

"Walter Storm"

Walter Storm

President and Chief Executive Officer

For further information, please visit the Company's website at

www.tudor-gold.com

or contact:

Catalin Kilofliski

Director Corporate Development and Communications

Tel. 604-559-8092

Email:

[email protected]

or

Carsten Ringler

Manager Investor Relations

Phone: +49 1726918274

E-Mail:

[email protected]

Figure 1

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/4494/63463_2eaa36566431e964_003full.jpg

Figure 2

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/4494/63463_2eaa36566431e964_004full.jpg

Figure 3

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/4494/63463_2eaa36566431e964_005full.jpg

Figure 4

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/4494/63463_2eaa36566431e964_006full.jpg