Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TTS.V ·

Tintina Mines Limited files NI 43-101 Independent Technical Report on Mineral Resource Estimate for the Domeyko Sulfuros Project, Atacama Region, Chile.

Resource Estimates Technical Reports (NI 43-101)

Tintina Mines Limited files NI 43-101 Independent Technical Report on Mineral Resource

Estimate for the Domeyko Sulfuros Project, Atacama Region, Chile.

TORONTO, Jan. 23, 2025 -- Tintina Mines Limited (“Tintina” or the “Company”) (TSXV: TTS) is

pleased to announce that the Company has filed an initial Mineral Resource Estimate (“MRE”) titled

“NI 43-101 Independent Technical Report, Mineral Resource Estimate for the Domeyko Sulfuros

Project, Atacama Region, Chile”.

Highlights

• Inferred resources: 320 Mt in the sulfide zone, with grades of 0.36% Cu and 0.26 ppm Au

(Cueq: 0.51%).

• At the Dos Amigos target, the mineralization remains open to the north and southeast. As a

result, the full extent of the known mineralization is still unclear. Further investigation is

required to assess the continuity of the high-grade zone.

• The project includes several porphyry copper-gold (Cu-Au) targets located within a north-

south-elongated hydrothermal alteration zone measuring 6 x 1.5 km in surface dimensions.

These targets are peripherally associated with skarn, mantos, and breccia pipe deposits.

Mr. Juan Enrique Rassmuss, Tintina's President and Chairman, comments, “We are delighted to

announce the completion of our first NI 43-101 compliant Mineral Resource Estimate for the (Cu-

Au) Domeyko Sulfuros Project. The outcomes of this initial estimate mark a major step toward

advancing the project as one of the best Cu-Au assets in Chile”.

Table 1: Mineral resources estimate for the Dos Amigos Deposit at the Domeyko Sulfuros Project.

The cut-off used was 0.2% Cu. Extracted from NI 43-101 Independent Technical Report, Mineral

Resource Estimate for the Domeyko Sulfuros Project, Atacama Region, Chile (SRK Consulting,

January 2025).

The Technical Report has been prepared by SRK Consulting Chile SpA (“SRK”) in accordance with

National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”), and is

available electronically on SEDAR+ (www.sedarplus.ca) under TTS’s issuer profile.

This NI 43-101 Independent Technical Report (January 2025) provides a more comprehensive

geological database than the previous report and represents the first mineral resource estimate for

the project. Based on recent insights and with full financing secured, a comprehensive work

program is currently under development, which includes technical studies and additional drilling,

targeted for completion in the first half of 2025. Results will be incorporated into a Preliminary

Economic Assessment (PEA), expected to be published as part of a NI 43-101 Technical Report in

the second half of 2025.

“The Domeyko Sulfuros Project is a high-priority asset in the company’s portfolio. We remain

committed to maximizing shareholder value by advancing its exploration and development, with the

goal of launching operations as soon as possible”, said Eugenio Ferrari, Director and CEO of

Tintina Mines.

Domeyko Sulfuros Project

The Domeyko Sulfuros Project is an exploration property situated in the Atacama Region of

northern Chile. The project encompasses 75 mining concessions, covering an area of 10,056

hectares within the Dos Amigos mining district.

Strategically positioned 53 kilometers south of Vallenar, the property offers exceptional accessibility,

located just 60 kilometers from the Pacific coast and less than one kilometer from the Pan-American

Highway, and adjacent to the town of Domeyko. This advantageous positioning significantly

enhances its logistical potential. Its low-altitude setting, combined with excellent connectivity and

access to critical infrastructure such as electrical power, water, and logistical support, provides

substantial operational advantages.

From 1997 to 2015, the enrichment blanket at the Dos Amigos target was the focus of open-pit

mining operations. During this period, approximately 12 million tonnes of ore, with copper grades

exceeding 0.85% (predominantly secondary sulfides), were extracted and processed using heap

leaching and solvent extraction-electrowinning (SX/EW) methods at an on-site facility.

In February 2024, Tintina completed a NI 43-101 Independent Technical Report for the Domeyko

Sulfuros Project (see news release dated February 15, 2024), providing a comprehensive overview

of the technical characteristics of the property.

Qualified Persons

The scientific and technical information and the mineral resources estimate results described in this

news release has been reviewed and approved by Joled Nur Paredes (CCCRRM, No. 181)

Principal Mining Engineer, and Sophia Bascuñán Moraga (MAIG, No. 9289) Senior Geologist, both

of SRK Consulting Chile SpA. They are independent of Tintina Mines and are "qualified persons" for

the purposes of NI 43-101.

QP verification included a site visit to the project to inspect site geology, mineralized core, logging,

density measurement and sampling procedures, and a review of the control sample results used to

assess laboratory assay quality. In addition, the digitalization procedures of the exploration

database and the validation process of historical drilling database results have been compared

against original paper and digital records.

About SRK Consulting SpA

Established in 1994, SRK Consulting Chile SpA is a distinguished consulting firm renowned for its

expertise in the mining sector. As the oldest SRK office in South America, it offers a comprehensive

suite of services ranging from geotechnical and environmental assessments to mine closure

planning, contributing to the success of many companies in Chile.

Technical Report

The Technical Report “NI 43-101 Independent Technical Report Mineral Resource Estimate for the

Domeyko Sulfuros Project, Atacama Region, Chile” with effective date January 15, 2025 supports

the Mineral Resources Estimate on the Domeyko Sulfuros Project. Reference should be made to

the full text of the Technical Report for the assumptions, qualifications and limitations set forth

therein, a copy of which is available on SEDAR+ (www.sedarplus.ca) under Tintina Mines Limited´s

issuer profile.

On Behalf of the Board of Directors,

Eugenio Ferrari, Director and Chief Executive Officer

Tintina Mines Limited

About Tintina Mines Limited

Tintina Mines is a Canadian-based company with over two decades of experience in the junior

mining sector, focused in the acquisition, exploration, and development of base and precious metal

properties in South America and Canada. Recently, Tintina expanded its portfolio with the addition

of five new projects in Chile, following the acquisition of a majority stake in Andean Belt Resources.

Tintina is committed to advancing the exploration and development of the copper-gold (Cu-Au)

Domeyko Sulfuros Project in the Atacama Region of northern Chile. Tintina Mines Limited’s

common shares are listed on the TSXV under the symbol TTS.

For further information about Tintina Mines Ltd., please contact:

Mr. Jing Peng

82 Richmond Street East, Toronto, Ontario, M5C 1P1 - CANADA

Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-looking Statements

This press release contains forward-looking statements. Forward-looking statements involve known

and unknown risks, uncertainties and assumptions and accordingly, actual results and future events

could differ materially from those expressed or implied in such statements. You are hence

cautioned not to place undue reliance on forward-looking statements. All statements other than

statements of present or historical fact are forward-looking statements. Forward-looking statements

include words or expressions such as “proposed”, “will”, “subject to”, “near future”, “in the event”,

“would”, “expect”, “prepared to” and other similar words or expressions. The forward-looking

statements in this press release include, but are not limited to, statements regarding the Company’s

future operational goals and strategies. Where the Company expresses or implies an expectation or

belief as to future events or results, such expectation or belief is based on assumptions made in

good faith and believed to have a reasonable basis. Such assumptions include, without limitation:

that the Company will be able to execute on its intended business plans and strategies; that the

Company will be able to conduct its intended exploration plans on its recently-acquired property;

and that the Company will be able to repay existing debt on the terms described herein or at all.

Factors that could cause future results or events to differ materially from current expectations

expressed or implied by the forward-looking statements include: general business, economic,

competitive, political and social uncertainties; the state of capital markets; failure to realize the

anticipated benefits of the recent property acquisition described herein; risks related to the mining

industry generally; other unforeseen events, developments, or factors causing any of the aforesaid

expectations, assumptions, and other factors ultimately being inaccurate or irrelevant; and any risks

associated with the ongoing COVID-19 pandemic. You can find further information with respect to

these and other risks in filings made with the Canadian securities regulatory authorities that are

available at www.sedarplus.ca. The Company disclaims any obligation to update or revise these

forward-looking statements, except as required by applicable law.