Talisker Provides Update on Mining Advancement at the Bralorne Gold Project
Talisker Resources Ltd.
130 Adelaide Street West, Suite 3002
Toronto, Ontario M5H 3P5
TSK
TSKFF
TSX OTCQX
Talisker Provides Update on Mining Advancement
at the Bralorne Gold Project
Toronto, Ontario, March 26, 2025 – Talisker Resources Ltd. (“ Talisker” or the “ Company”) (TSX: TSK,
OTCQX: TSKFF) is pleased to provide a n operational update on mining activities from its Bralorne Gold
Project located in British Columbia . Talisker commenced development work as planned at the Mustang
Mine on March 19th with blasting of a diamond drill bay on the 1120 ramp followed with the initiation of
vein access development the 1075 level. To date, 31.6m of 3x3 metre development has been completed
for vein zone access and auxiliary development. Parallel development is soon to begin on the 1105 level
providing multiple extraction headings on the Alhambra vein. Talisker expects to reach mineralized vein
material by the third week in April.
Terry Harbort, CEO of Talisker stated, “ We are pleased with the smooth start to mining operations at
Mustang and excited to be developing on the 1075 level and soon the 1105 level towards the Alhambra
vein.”
For further information, please contact:
Terry Harbort
President and CEO
+1 416 357 0227
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration and
development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully
permitted Bralorne Gold Project where the Company is currently transitioning into underground
production at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an advanced
stage project with significant exploration potential from an historical high-grade producing gold mine and
the Spences Bridge Project where the Company has a significant landholding in the emerging Spences
Bridge Gold Belt, and several other early-stage Greenfields projects.
Caution Regarding Forward Looking Statements
Certain statements contained in this press release constitute forward -looking information. These
statements relate to future events or future performance. The use of any of the words “could”, “intend”,
“expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to
matters that are not historical facts are intended to identify forward -looking information and are based
on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various
assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections
set out in forward-looking information. Those assumptions and factors are based on information currently
available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s
management, there can be no assurance that any conclusions or forecasts will prove to be accurate.
Forward looking information involves known and unknown risks, uncertainties and other factors which
may cause the actual results, performance, or achievements to be materially different from any future
2
results, performance or achievements expressed or implied by the forward -looking information. Such
factors include risks inherent in the exploration and development of mineral deposits, including risks
relating to changes in project parameters as plans continue to be redefined, risks relating to variations in
grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and
supply of minerals, risks related to increased competition and current global financial conditions, access
and supply risks, reliance on key personnel, operational risks regulatory risks, including risks relating to
the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and
environmental risks and ris ks relating to the failure to receive all requisite shareholder and regulatory
approvals.
The forward-looking information contained in this release is made as of the date hereof, and Talisker is
not obligated to update or revise any forward -looking information, whether as a result of new
information, future events or otherwise, except as required by applicable securities laws. Because of the
risks, uncertainties and assumptions contained herein, investors should not place undue reliance on
forward-looking information. The foregoing statements expressly qualify any forward-looking information
contained herein.