Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TSK.TO ·

Talisker Intersects 27.3 g/t Au over 0.6 m in First Drill Hole at Bralorne Gold Project

Drill Results

Talisker Intersects 27.3 g/t Au over 0.6 m in

First Drill Hole at Bralorne Gold Project

TORONTO

,

April 1, 2020

/CNW/ - Talisker Resources Ltd. ("Talisker" or the "Company") (CSE:

TSK) (OTCQB: TSKFF) is pleased to announce partial results from the first drill hole at the Bralorne

Gold Project located in British Columbia. Talisker is undertaking a

11,200m

drill program targeting

high-grade veins at the Project (see press release of

February 12

, 2020). The results from hole SB-

2020-001 are the first since Talisker acquired the Bralorne Gold Project in

December 2019

. The first

hole targeted the PHW, P Main and P Main splay, and the J Veins. Highlights include:

11.3 g/t Au over

0.9m

from

237.50m

to

238.40m

intersecting the PHW Vein

27.3 g/t Au over

0.6m

from

364m

to

364.6m

intersecting the P Main Vein Splay

3.42 g/t Au over

1.58m

from

437.92m

to

439.5m

intersecting the J Vein

16.45 g/t Au over

0.5m

from

447.9m

to

448.4m

intersecting the J Vein Splay

A void was encountered at the anticipated location of the P Main Vein.

In addition, significant gold mineralization was also identified for the first time in the altered halos

surrounding the veins in both footwall and hanging wall locations associated with intense silica-

sericite alteration. Highlights of non-vein mineralization include:

Hanging wall to the PHW Vein

1.4 g/t Au over

1m

from

235m

to

236m

2.13 g/t Au over

1.50m

from

236m

to

237.5m

Footwall to the PHW Vein

1.84 g/t Au over

0.5m

from

238.4m

to

238.9m

Hanging wall to the P Main Vein Splay

1.07 g/t Au over

1m

from

363m

to

364m

Footwall to the P Main Vein Splay

0.75 g/t Au over

1.1m

from

364.6m

to

365.7m

Hanging wall to the J Vein

1.09 g/t Au over

0.92m

from

437m

to

437.92m

Footwall to the J Vein

1.11 g/t Au over

1m

from

440m

to

441m

Select results from the first drill hole are listed in the following table and a map and cross section

displaying the location of the drill hole and mineralized intercepts is attached to this press release.

"We are very happy with the initial results from our first drill hole at Bralorne which clearly

demonstrates our proof of concept intersecting the veins as interpreted and returning high-grade

gold results as anticipated," commented

Terry Harbort

, President & CEO of Talisker, who added,

"We are additionally encouraged by the identification of mineralised halos adjacent to the veins. This

new observation has potential to allow us to decrease dilution during the resource modelling phase."

Bralorne Gold Project

Drill Hole ID SB-2020-001

Sample

Number

From

(m)

To

(m)

Interval

(m)

Au g/t

Interpreted

Structure

Method

Reported

B0215653

235.00

236.00

1.00

1.40

Vein Halo

Au-AA24

B0215654

236.00

237.50

1.50

2.13

Vein Halo

Au-AA24

B0215655

237.50

238.40

0.90

11.30

PHW Vein

Au-GRA22

B0215656

238.40

238.90

0.50

1.84

Vein Halo

Au-AA24

B0215782

363.00

364.00

1.00

1.07

Vein Halo

Au-AA24

B0215783

364.00

364.60

0.60

27.30

P Main Vein Splay

Au-GRA22

B0215784

364.60

365.70

1.10

0.75

Vein Halo

Au-AA24

B0215855

437.00

437.92

0.92

1.09

Vein Halo

Au-AA24

B0215856

437.92

439.50

1.58

3.42

J Vein

Au-SCR24

B0215857

439.50

440.00

0.50

0.17

Vein Halo

Au-AA24

B0215858

440.00

441.00

1.00

1.11

Vein Halo

Au-AA24

B0215859

441.00

442.50

1.50

0.90

Vein Halo

Au-AA24

B0215865

446.80

447.90

1.10

0.57

Vein Halo

Au-AA24

B0215866

447.90

448.40

0.50

16.45

J Vein Splay

Au-GRA22

B0215867

448.40

449.50

1.10

0.70

Vein Halo

Au-AA24

Notes: Diamond drill hole SB-2020-001 was collared at an azimuth of 203 degrees, and a downward dip of 60 degrees.

True widths are estimated at 70 - 90% of intercept lengths and are based on oriented core measurements.

Method Reported

includes the most up to date information as of the date of this press release.

Additional re-run and over-limit results have not yet been received.

About Talisker Resources Ltd.

Talisker Resources Ltd. is a junior resource company involved in the exploration of gold projects in

British Columbia, Canada

. Talisker's projects include the Bralorne Gold Complex, an advanced stage

project with significant exploration potential from a historical high-grade producing gold mine as well

as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge

Gold Belt and several other early stage Greenfields projects. With its properties comprising 274,202

hectares over 289 claims, three leases and 173 crown grant claims, Talisker is a dominant

exploration player in the south-central

British Columbia

. The Company is well funded to advance its

aggressive systematic exploration program at its projects.

Qualified Person

The technical information contained in this news release has been approved by

Leonardo de Souza

(BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource

Development, who is a "qualified person" within the meaning of National Instrument 43-101,

Standards of Disclosure for Mineral Projects.

Sample Preparation and QAQC

Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm

respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis.

Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder

samples bracket the interval of interest such that a total sampled core length of

3 m

both above and

below the interval of interest must be assigned. Sample QAQC measures of unmarked certified

reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and

make up 8% of the samples submitted to the lab for hole SB-2020-001.

Sample preparation and analyses is carried out by ALS Global, at their laboratory in

North

Vancouver, British Columbia

, Canada. Drill core sample preparation includes drying in an oven at a

maximum temperature of 60°C, fine crushing of the sample to at least 70% passing less than 2 mm,

sample splitting using a riffle splitter, and pulverizing a 250 g split to at least 85% passing 75

microns (code PREP-31).

Gold and in diamond drill core is analysed by fire assay and atomic absorption spectroscopy (AAS)

of a 50g sample (code Au-AA24), while multi-element chemistry is analysed by 4-Acid digestion of a

0.25 g sample split with detection by inductively coupled plasma mass spectrometer (ICP-MS) for

48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,

Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, Zr).

Gold assay technique Au-AA24 has an upper detection limit of 10ppm. Any sample that produces an

over-limit gold value via the Au-AA24 technique is sent for gravimetric finish via method Au-GRA22

which has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are

sent directly to screen metallics analysis and all samples that fire assay above 3 ppm Au are re-

analysed with method Au-

SCR24

which employs a 1kg pulp screened to 100 microns with assay of

the entire oversize fraction and duplicate 50g assays on the undersize fraction. Where possible all

samples initially sent to screen metallics processing will also be re-run through the fire assay with

gravimetric finish provided there is enough material left for further processing.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. The use of any of the words "could",

"intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements

relating to matters that are not historical facts are intended to identify forward-looking information

and are based on Talisker's current belief or assumptions as to the outcome and timing of such

future events. Actual future results may differ materially. In particular, this release contains forward-

looking information relating to, among other things, the operations of the Company and the timing

which could be affected by the current global COVID-19 pandemic. Those assumptions and factors

are based on information currently available to Talisker. Although such statements are based on

reasonable assumptions of Talisker's management, there can be no assurance that any conclusions

or forecasts will prove to be accurate.

While Talisker considers these assumptions to be reasonable based on information currently

available, they may prove to be incorrect. Forward looking information involves known and unknown

risks, uncertainties and other factors which may cause the actual results, performance or

achievements to be materially different from any future results, performance or achievements

expressed or implied by the forward-looking information. Such factors include risks inherent in the

exploration and development of mineral deposits, including risks relating to changes in project

parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates,

risks relating to changes in mineral prices and the worldwide demand for and supply of minerals,

risks related to increased competition and current global financial conditions and the COVID-19

pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory

risks, including risks relating to the acquisition of the necessary licenses and permits, financing,

capitalization and liquidity risks.

The forward-looking information contained in this release is made as of the date hereof, and Talisker

is not obligated to update or revise any forward-looking information, whether as a result of new

information, future events or otherwise, except as required by applicable securities laws. Because of

the risks, uncertainties and assumptions contained herein, investors should not place undue reliance

on forward-looking information. The foregoing statements expressly qualify any forward-looking

information contained herein.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the

CSE) accepts responsibility for the adequacy or accuracy of this release. No stock exchange,

securities commission or other regulatory authority has approved or disapproved the information

contained herein.

Pioneer Mine - Section 515575 mE (CNW Group/Talisker Resources Ltd)

Drilling Location Plan (CNW Group/Talisker Resources Ltd)

SOURCE

Talisker Resources Ltd

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/April2020/01/c5058.html

%SEDAR: 00005798E

For further information:

please contact Terry Harbort, Chief Executive Officer of Talisker, at

[email protected] or (416) 361-2808.

CO: Talisker Resources Ltd

CNW 11:51e 01-APR-20