Talisker Intercepts High Grade Gold on the 52 Vein Across 660 Metres of Strike Length
Talisker Intercepts High Grade Gold on the 52
Vein Across 660 Metres of Strike Length
TORONTO
,
Jan. 25, 2022
/CNW/ - Talisker Resources Ltd. ("
Talisker
" or the "
Company
") (TSX:
TSK) (OTCQX: TSKFF) is pleased to announce high-grade results from multiple drill holes
highlighted by
55.25 g/t Au over 1.3 metres
(SB-2021-090) and
23.58 g/t Au over 1.80 metres
within 5.26 g/t Au over 8.90 metres
(SB-2021-087) on the 52 Vein at its 100% owned flagship
Bralorne Gold Project.
Key Points
:
The drill holes in this release are located within the Bralorne East Complex.
All three drill holes in this release intersected the 52 vein over a 660-metre strike length.
Hole SB-2021-090 intersected the 52 vein highlighted by
55.25 g/t Au over 1.30 metres
and
the J vein which intersected 10.10 g/t Au over 0.55 metres.
SB-2021-087 intersected the 52 vein highlighted by
23.85 g/t Au over 1.80 metres within 5.26
g/t Au over 8.90 metres
.
Hole SB-2021-085 intersected the 52 vein highlighted by
14.13
g/t Au over 2.50 metres
and a
New vein highlighted by 7.59 g/t Au over 1.45 metres.
The previous drilling on the 52 vein returned high-grade assays highlighted by hole SB-2021-069
which returned 10.09 g/t Au over 4.35 metres and SB-2021-030 which returned 19.95g/t Au
over 1.00 metres.
Terry Harbort, CEO of Talisker, commented, "These three holes confirm high grade mineralization
over a significant strike length, highlighting the extensive vein continunity known as one of the defining
characteristics of the Bralorne deposit. We are very pleased with the consistency of the gold
mineralization intercepted in this structure and see the 52 vein building to one of the important ore
bodies of our upcoming resource."
Six diamond drills and 1 RC drill are currently operating at Bralorne. A total of 104,162 metres (197
holes) has been completed since Talisker initiated drilling at the Project in
February 2020
. 26,365
samples are currently at the assay laboratory and are expected to be received by the
Company shortly.
Hole Descriptions:
SB-2021-085
Located in the Bralorne East Block and hosted in dioritic intrusive
New vein intersected from 296.25 to
299.00 m
52 vein intersected from 387.00 to
389.50 m
hosting visible gold
SB-2021-087
Located in the Bralorne East Block and hosted in granitic intrusive
51 BFW vein intersected from 298.50 to
300 m
52 vein intersected from 495.20 to
497.00 m
New vein intersected from 659.55 to
660.80 m
SB-2021-090
Located in the Pioneer Block and hosted in volcanics
52 vein intersected from 190.00 to
191.30 m
hosting visible gold
J vein intersected from 598.65 to
599.75 m
Complete results have been received for all reported holes as outlined in Table 1 below. All major
vein structures intersected and reported in this release are considered to be classic Bralorne crack-
seal quartz-carbonate veins. The veins display densely banded sulphide septae, hosting fine-grained
arsenopyrite and pyrite mineralization with strong silica-sericite alteration halos. All reported drill
assay results are available on the Company's website at the following link:
https://taliskerresources.com/bralorne-gold-project-released-drill-results/
.
Table 1: Bralorne Gold Project - Drill Holes SB-2021-085, 087, 090
Diamond Drill
Hole Name
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Zone
Method Reported
SB-2021-085
296.25
297.7
1.45
7.59
New vein
Au-SCR24
SB-2021-085
297.7
298.5
0.8
0.32
Au-AA26
SB-2021-085
298.5
299
0.5
3.72
Au-SCR24
SB-2021-085
387
387.5
0.5
7.75
52 Vein
Au-SCR24
SB-2021-085
387.5
388
0.5
29.60
Au-SCR24
SB-2021-085
388
388.5
0.5
5.84
Au-SCR24
SB-2021-085
388.5
389
0.5
2.35
Au-SCR24
SB-2021-085
389
389.5
0.5
25.10
Au-SCR24
SB-2021-087
294.65
295.15
0.5
0.35
51BFW Vein
Au-AA26
SB-2021-087
295.15
295.65
0.5
1.06
Au-SCR24
SB-2021-087
295.65
296.15
0.5
1.09
Au-SCR24
SB-2021-087
296.15
296.98
0.83
0.79
Au-SCR24
SB-2021-087
296.98
297.5
0.52
0.49
Au-SCR24
SB-2021-087
297.5
298
0.5
1.45
Au-SCR24
SB-2021-087
298
298.5
0.5
0.59
Au-SCR24
SB-2021-087
298.5
299.1
0.6
7.69
Au-SCR24
SB-2021-087
299.1
300
0.9
0.90
Au-SCR24
SB-2021-087
300
301
1
0.25
Au-SCR24
SB-2021-087
301
302
1
0.10
Au-SCR24
SB-2021-087
302
303
1
0.20
Au-SCR24
SB-2021-087
303
303.5
0.5
0.21
Au-SCR24
SB-2021-087
303.5
304
0.5
0.10
Au-SCR24
SB-2021-087
495.2
495.72
0.52
80.90
52 Vein
Au-AA26
SB-2021-087
495.72
497
1.28
0.30
Au-AA26
SB-2021-087
497
498
1
0.26
Au-AA26
SB-2021-087
498
499
1
0.09
Au-AA26
SB-2021-087
499
500
1
0.41
Au-AA26
SB-2021-087
500
501.1
1.1
1.07
Au-AA26
SB-2021-087
501.1
502
0.9
0.26
Au-AA26
SB-2021-087
502
503
1
0.33
Au-AA26
SB-2021-087
503
503.6
0.6
2.28
Au-AA26
SB-2021-087
659.55
660.25
0.7
8.21
New Vein
Au-SCR24
SB-2021-087
660.25
660.8
0.55
0.16
Au-AA26
SB-2021-090
190
190.75
0.75
0.07
52 Vein
Au-AA26
SB-2021-090
190.75
191.3
0.55
130.50
Au-SCR24
SB-2021-090
598.65
599.2
0.55
0.41
J Vein
Au-AA26
SB-2021-090
599.2
599.75
0.55
10.10
Au-SCR24
Notes: Diamond drill hole SB-2021-085 has collar orientation of Azimuth 177; Dip -45. Diamond drill hole SB-2021-087 has a collar
orientation of Azimuth 177; Dip -47. Diamond drill hole SB-2021-090 has a collar orientation of Azimuth 176; Dip -63. True widths are
estimated at 40 - 90% of intercept lengths and are based on oriented core measurements where available. Method Reported includes
the most up-to-date information as of the date of this press release.
Talisker is providing an opportunity for shareholders and other interested parties to participate in a
Webinar to be held at
4:15 pm ET on Tuesday
, January 25
th
. To register, please click on the
following link –
https://bit.ly/33IKH9w
.
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne
Gold Project has been approved by
Leonardo de Souza
(BSc, AusIMM (CP) Membership 224827),
Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within
the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker (
taliskerresources.com
)
is a junior resource company involved in the exploration of gold
projects in
British Columbia, Canada
. Talisker's projects include two advanced stage projects, the
Bralorne Gold Complex and the Ladner Gold Project, both advanced stage projects with significant
exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge
Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several
other early-stage Greenfields projects. With its properties comprising 296,983 hectares over
346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in the
south-central
British Columbia
. The Company is well funded to advance its aggressive systematic
exploration program at its projects.
Sample Preparation and QAQC
Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm
respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis.
Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder
samples bracket the interval of interest such that a total sampled core length of not less than
3m
both above and below the interval of interest must be assigned. Sample QAQC measures of
unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample
sequence and make up 9% of the samples submitted to the lab for holes reported in this release.
Sample preparation and analyses is carried out by ALS Global in
North Vancouver, British Columbia
,
Canada and SGS Canada in
Burnaby, British Columbia
, Canada. Drill core sample preparation
includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least
70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at
least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core
is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code
Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid
digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer
(ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In,
K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W,
Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper
detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay
technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which
has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent
directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed
with method (ALS code Au-
SCR24
/ SGS code - 6 - GO_FAS50M) which employs a 1kg pulp
screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the
undersize fraction. Where possible all samples initially sent to screen metallics processing will also
be re-run through the fire assay with gravimetric finish provided there is enough material left for
further processing.
Caution Regarding Forward-Looking Information
Certain statements contained in this press release constitute forward-looking information. These
statements relate to future events or future performance. The use of any of the words "could",
"intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements
relating to matters that are not historical facts are intended to identify forward-looking information
and are based on Talisker's current belief or assumptions as to the outcome and timing of such
future events. Actual future results may differ materially. Those assumptions and factors are based
on information currently available to Talisker. Although such statements are based on reasonable
assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts
will prove to be accurate.
While Talisker considers these statements to be reasonable based on information currently
available, they may prove to be incorrect. Forward-looking information involves known and unknown
risks, uncertainties and other factors which may cause the actual results, performance or
achievements to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking information. Such factors include market risks and the
demand for securities of the Company, risks inherent in the exploration and development of mineral
deposits, including risks relating to changes in project parameters as plans continue to be redefined,
risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and
the worldwide demand for and supply of minerals, risks related to increased competition and current
global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key
personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the
necessary licenses and permits, financing, capitalization and liquidity risks.
The forward-looking information contained in this news release is made as of the date hereof, and
Talisker is not obligated to update or revise any forward-looking information, whether as a result of
new information, future events or otherwise, except as required by applicable securities laws.
Because of the risks, uncertainties and assumptions contained herein, investors should not place
undue reliance on forward-looking information. The foregoing statements expressly qualify any
forward-looking information contained herein.
Figure 1: SB-2021-085 hole location within the Bralorne East Block. (CNW Group/Talisker
Resources Ltd)
Figure 2: SB-2021-087 hole location within the Bralorne East Block. (CNW Group/Talisker
Resources Ltd)
Figure 3: SB-2021-090 hole location within the Pioneer Block. (CNW Group/Talisker Resources Ltd)
Figure 4: SB-2021-085, 087 and 090 cross section with vein intersections and grade. (CNW
Group/Talisker Resources Ltd)
SOURCE
Talisker Resources Ltd
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/January2022/25/c9681.html
%SEDAR: 00005798E
For further information:
Terry Harbort, President and CEO, [email protected],
+1 416 361 2808
CO: Talisker Resources Ltd
CNW 07:00e 25-JAN-22