Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TSK.TO ·

Talisker Intercepts High Grade Gold at BRX Brownfields Drill Program North of Bralorne and Increases to Seven Drill Rigs

Exploration Programs

Talisker Intercepts High Grade Gold at BRX

Brownfields Drill Program North of Bralorne

and Increases to Seven Drill Rigs

TORONTO

,

Nov. 9, 2021

/CNW/ - Talisker Resources Ltd. ("

Talisker

" or the "

Company

") (TSX:

TSK) (OTCQX: TSKFF) is pleased to announce high grade results from the brownfields BRX Project

in drill hole SB-2021-068 highlighted by 407 g/t Au over 0.5 metre within 90.71 g/t Au over 2.25

metres at its 100% owned flagship Bralorne Gold Project.

Talisker is also pleased to announce that it has increased the number of drills from five to seven

including one RC drill focused on infill drilling at the Pioneer zone.

Key Points:

Hole SB-2021-068 intersected high grade mineralization on the brownfields BRX Project 5.5

kilometres northwest of the historic Bralorne Mine.

Successful intersection of a new vein at the BRX Project highlighted by 407 g/t Au over

0.5m

within 90.71 g/t Au over

2.25m

.

A broader zone of lower grade mineralization around the Why Not vein intercepted between

184.75 and 236.60 metres grading 0.44 g/t Au over

51.85m

.

The BRX Project is Talisker's first brownfields drill program along the 33 kilometre Bralorne trend.

Historically, 10 veins have been defined on the BRX property. The most extensively developed vein,

the California Vein, was mined to a depth of 600 metres and is described as a 2 metre wide quartz

carbonate vein very similar in nature to the classical Bralorne crack and seal orogenic veins. Historic

drilling at the BRX Project is highlighted by 5.65 g/t Au over

5.39m

. Limited modern exploration has

been conducted on the BRX Project.

Terry Harbort

, Talisker's President and CEO, stated, "We are very pleased with our first high-grade

brownfields results for the Bralorne trend. These encouraging results confirm the district nature of

Bralorne and the significant upside potential outside of our current resource drillout area."

The Bralorne Gold Project has a total of 47 gold showings over 33 kilometres. Talisker plans to

expand its brownfield exploration in 2022 to focus on the Congress Project and Royalle Project.

The Congress Project sits 16 kilometres north of the historic Bralorne Mine and consists of three

defined veins, mined to a depth of 200 metres. Several highly prospective exploration targets are

present on the ground including the Lou zone with historic drilling intersecting zones ranging from 1.4

to 4 metres with grades between 5 and 11 g/t Au. Eight separate vein zones have been identified

away from the Congress and Lou zones. A non-complaint resource consists of 46,151 ounces in the

indicated and 148,091 ounces in the inferred categories. The Company notes that a qualified person

has not verified the data disclosed in respect of the property, including sampling, analytical and test

data underlying this information.

The Royalle Project sits directly south of the historic Bralorne-Pioneer Mine along strike of the

Cadwaller Break and hosts eight exploration targets including mesothermal gold and silver veins and

skarn style mineralization. The main target is the Piebiter zone with historic adit sampling returning

gold grades of 4.3 g/t over 21 metres and selective grab samples of up to 227 g/t Au. The Chopper

silver vein has been delineated for 2,400 metres and with selective grab samples up to 1,585 g/t Ag.

The Company notes that these selected samples are not necessarily representative of the

mineralization hosted on the property and limited drilling has been completed on the property. A

qualified person has not verified the data disclosed in respect of the Property, including sampling,

analytical and test data underlying this information.

Seven diamond drill rigs are currently drilling at the Bralorne Gold Project. A total of 73,321 metres

consisting of 135 holes of a planned and fully funded 100,000 metres drill program has been drilled

at the project this year with a total of 96,027 metres (171 holes) since Talisker initiated drilling at the

project in

February 2020

. 32 holes consisting of 14,611 samples are currently at the assay

laboratory and are expected to be received by the Company shortly.

SB-2021-068 Hole Description:

Complete results have been received for this hole.

Hole targeted the down dip extension of veins developed in the Why Not mine and the large

untested prospective block proximal to the Cadwaller Break.

Intersected mafic volcanics cross-cut by a suite of intermediate to mafic dikes similar to those

observed at the Bralorne Gold Project from surface down to

560.0m

.

Why Not Vein intersected as a broad mineralized zone of quartz-carbonate veining with strong

silica-sericite alteration from 184.75 to

236.6m

.

New Vein intersected with coarse visible gold hosted in a quartz-carbonate vein with banded

sulphide septae, 2% arsenopyrite and pyrite mineralization and strong silica-sericite-mariposite

alteration halos from 382.70 to

384.95m

.

This gold-bearing New Vein discovery in the BRX Block is considered analogous to the classic

Bralorne crack-seal quartz-carbonate veins.

Table 1: Bralorne Gold Project - Drill Hole SB-2021-068

Diamond Drill

Hole Name

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Zone

Method Reported

SB-2021-068

184.75

185.25

0.5

0.42

BRX Bulk

Zone

Au-AA26

SB-2021-068

185.25

186

0.75

0.26

Au-AA26

SB-2021-068

186

187

1

0.10

Au-AA26

SB-2021-068

187

188

1

0.10

Au-AA26

SB-2021-068

188

189

1

0.11

Au-AA26

SB-2021-068

189

189.6

0.6

0.15

Au-AA26

SB-2021-068

189.6

191

1.4

0.08

Au-AA26

SB-2021-068

191

192.5

1.5

0.28

Au-AA26

SB-2021-068

192.5

194

1.5

0.44

Au-AA26

SB-2021-068

194

195.5

1.5

0.28

Au-AA26

SB-2021-068

195.5

197

1.5

0.39

Au-AA26

SB-2021-068

197

198.5

1.5

0.27

Au-AA26

SB-2021-068

198.5

200

1.5

0.34

Au-AA26

SB-2021-068

200

200.8

0.8

0.43

Au-AA26

SB-2021-068

200.8

201.3

0.5

0.46

Au-AA26

SB-2021-068

201.3

202.5

1.2

0.24

Au-AA26

SB-2021-068

202.5

204

1.5

0.23

Au-AA26

SB-2021-068

204

204.7

0.7

0.15

Au-AA26

SB-2021-068

204.7

205.5

0.8

0.10

Au-AA26

SB-2021-068

205.5

206

0.5

0.15

Au-AA26

SB-2021-068

206

206.75

0.75

1.26

Au-AA26

SB-2021-068

206.75

207.25

0.5

0.21

Au-AA26

SB-2021-068

207.25

207.8

0.55

0.06

Au-AA26

SB-2021-068

207.8

208.3

0.5

0.02

Au-AA26

SB-2021-068

208.3

208.8

0.5

0.05

Au-AA26

SB-2021-068

208.8

209.3

0.5

0.04

Au-AA26

SB-2021-068

209.3

209.8

0.5

0.10

Au-AA26

SB-2021-068

209.8

210.3

0.5

2.91

Au-AA26

SB-2021-068

210.3

211

0.7

0.79

Au-AA26

SB-2021-068

211

211.5

0.5

0.18

Au-AA26

SB-2021-068

211.5

213

1.5

0.02

Au-AA26

SB-2021-068

213

214

1

0.01

Au-AA26

SB-2021-068

214

215

1

0.19

Au-AA26

SB-2021-068

215

216

1

0.32

Au-AA26

SB-2021-068

216

217

1

0.15

Au-AA26

SB-2021-068

217

218

1

0.02

Au-AA26

SB-2021-068

218

218.5

0.5

2.33

Au-AA26

SB-2021-068

218.5

219

0.5

0.01

Au-AA26

SB-2021-068

219

220

1

0.01

Au-AA26

SB-2021-068

220

221

1

0.05

Au-AA26

BRX Bulk

Zone

SB-2021-068

221

222

1

0.95

Au-AA26

SB-2021-068

222

222.8

0.8

2.27

Au-AA26

SB-2021-068

222.8

223.7

0.9

2.16

Au-AA26

SB-2021-068

223.7

224.6

0.9

1.80

Au-AA26

SB-2021-068

224.6

226

1.4

0.02

Au-AA26

SB-2021-068

226

226.55

0.55

0.02

Au-AA26

SB-2021-068

226.55

227.05

0.5

0.42

Au-AA26

SB-2021-068

227.05

227.75

0.7

0.19

Au-AA26

SB-2021-068

227.75

228.25

0.5

0.64

Au-AA26

SB-2021-068

228.25

229.25

1

0.28

Au-AA26

SB-2021-068

229.25

230.1

0.85

0.42

Au-AA26

SB-2021-068

230.1

231.1

1

1.91

Au-AA26

SB-2021-068

231.1

232.15

1.05

0.02

Au-AA26

SB-2021-068

232.15

233

0.85

0.57

Au-AA26

SB-2021-068

233

233.55

0.55

0.50

Au-AA26

SB-2021-068

233.55

234.05

0.5

1.05

Au-AA26

SB-2021-068

234.05

234.9

0.85

0.35

Au-AA26

SB-2021-068

234.9

235.4

0.5

0.31

Au-AA26

SB-2021-068

235.4

236.1

0.7

0.75

Au-AA26

SB-2021-068

236.1

236.6

0.5

0.40

Au-AA26

SB-2021-068

382.7

383.2

0.5

407.0

New Vein

Au-GRA22

SB-2021-068

383.2

383.7

0.5

0.07

Au-AA26

SB-2021-068

383.7

384.2

0.5

0.02

Au-AA26

SB-2021-068

384.2

384.95

0.75

0.30

Au-AA26

Notes: Diamond drill hole SB-2021-023 has collar orientation of Azimuth 234; Dip -45. True widths are estimated at 40 - 90% of intercept lengths and are based on oriented core

measurements where available. Method Reported includes the most up to date information as of the date of this press release.

Qualified Person

The technical information contained in this news release relating to the drill results at the Bralorne

Gold Project has been approved by

Leonardo de Souza

(BSc, AusIMM (CP) Membership 224827),

Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within

the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.

About Talisker Resources Ltd.

Talisker (

taliskerresources.com

)

is a junior resource company involved in the exploration of gold

projects in

British Columbia, Canada

. Talisker's projects include two advanced stage projects, the

Bralorne Gold Complex and the Ladner Gold Project, both advanced stage projects with significant

exploration potential from historical high-grade producing gold mines, as well as its Spences Bridge

Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt and several

other early-stage Greenfields projects. With its properties comprising 296,983 hectares over

346 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player in the

south-central

British Columbia

. The Company is well funded to advance its aggressive systematic

exploration program at its projects.

Sample Preparation and QAQC

Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm

respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis.

Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder

samples bracket the interval of interest such that a total sampled core length of not less than

3m

both above and below the interval of interest must be assigned. Sample QAQC measures of

unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample

sequence and make up 9% of the samples submitted to the lab for holes reported in this release.

Sample preparation and analyses is carried out by ALS Global in

North Vancouver, British Columbia

,

Canada and SGS Canada in

Burnaby, British Columbia

, Canada. Drill core sample preparation

includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least

70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at

least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core

is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code

Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid

digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer

(ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In,

K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W,

Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper

detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay

technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which

has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent

directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed

with method (ALS code Au-

SCR24

/ SGS code - 6 - GO_FAS50M) which employs a 1kg pulp

screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the

undersize fraction. Where possible all samples initially sent to screen metallics processing will also

be re-run through the fire assay with gravimetric finish provided there is enough material left for

further processing.

Caution Regarding Forward-Looking Information

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. The use of any of the words "could",

"intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements

relating to matters that are not historical facts are intended to identify forward-looking information

and are based on Talisker's current belief or assumptions as to the outcome and timing of such

future events. Actual future results may differ materially. Those assumptions and factors are based

on information currently available to Talisker. Although such statements are based on reasonable

assumptions of Talisker's management, there can be no assurance that any conclusions or forecasts

will prove to be accurate.

While Talisker considers these statements to be reasonable based on information currently

available, they may prove to be incorrect. Forward-looking information involves known and unknown

risks, uncertainties and other factors which may cause the actual results, performance or

achievements to be materially different from any future results, performance or achievements

expressed or implied by the forward-looking information. Such factors include market risks and the

demand for securities of the Company, risks inherent in the exploration and development of mineral

deposits, including risks relating to changes in project parameters as plans continue to be redefined,

risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and

the worldwide demand for and supply of minerals, risks related to increased competition and current

global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key

personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the

necessary licenses and permits, financing, capitalization and liquidity risks.

The forward-looking information contained in this news release is made as of the date hereof, and

Talisker is not obligated to update or revise any forward-looking information, whether as a result of

new information, future events or otherwise, except as required by applicable securities laws.

Because of the risks, uncertainties and assumptions contained herein, investors should not place

undue reliance on forward-looking information. The foregoing statements expressly qualify any

forward-looking information contained herein.

Figure 1: Location of the BRX Project within the Bralorne Gold Project. (CNW Group/Talisker

Resources Ltd)

Figure 2: SB-2021-068 drill hole location with the BRX Project. (CNW Group/Talisker Resources

Ltd)

SOURCE

Talisker Resources Ltd

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/November2021/09/c0280.html

%SEDAR: 00005798E

For further information:

Terry Harbort, President and CEO, [email protected],

+1 416 361 2808

CO: Talisker Resources Ltd

CNW 07:00e 09-NOV-21