Talisker Intercepts 1.36 g/t over 68.9 Metres within 0.8 g/t over 220 Metres with 200 Metre Stepout at Pioneer
Talisker Intercepts 1.36 g/t over 68.9 Metres
within 0.8 g/t over 220 Metres with 200 Metre
Stepout at Pioneer
TORONTO
,
Sept. 16, 2021
/CNW/ - Talisker Resources Ltd. ("
Talisker
" or the "
Company
") (TSX:
TSK) (OTCQX: TSKFF) is pleased to announce results from drill hole SB-2021-025 at its 100%
owned flagship Bralorne Gold Project. Hole SB-2021-025 is the first stepout hole located
200m
to
the southeast of previously released holes targeting newly discovered bulk-tonnage mineralization at
Pioneer.
Key Points:
Hole SB-2021-025 intersected 1.36 g/t over
68.9m
with a larger envelope of 0.8 g/t over
220m
.
The hole is located 200 metres along strike to the southeast from previously released holes SB-
2021-026 (1.17 g/t Au over
106.75m
), SB-2021-040 (1.02 g/t over
114.15m
), SB-2021-048 (1
g/t over
116.25m
) and SB-2021-055 (0.68 g/t over
51.50m
and 0.87 g/t over
34.55m
) which
together confirmed a 1.1 kilometre vertical panel of mineralization from surface.
Pervasive microfracturing hosting a dark matrix of fine-grained pyrite, arsenopyrite and silica is
seen frequently within mineralized zones.
Bulk tonnage mineralization is also observed uphole within the basalt.
Additional intercepts from hole SB-2021-025 include 2.83 g/t over
14.50m
, 1.04 g/t over
17.05m
and 0.6 g/t over
12.45m
situated up-hole from the targeted zone.
Stepout hole SB-2021-063, drilled 400 metres to the northwest of hole SB-2021-025 is
expected to be released to market shortly.
Stepout hole SB-2020-69 drilled 600 metres to the northwest of hole SB-2021-025 completed
and at the laboratory awaiting assay.
"As our initial stepout from the successful first section containing holes 26, 40 and 48 we are very
pleased to see the continuation of grade and intervals previously confirmed for over a kilometre
vertically", commented
Terry Harbort
, Chief Executive Officer of Talisker who added, "We are
eagerly awaiting holes 63 and 69 where we also observed high vein density (see table below) and
visible gold occurrences in the core logging to confirm mineralization for 600 metres along strike."
A total of 56,703 metres consisting of 98 holes have been drilled this year out of a planned and fully
funded 100,000 metre diamond drill program. Since acquiring the Bralorne Gold Project and
commencing drilling in
February 2020
, Talisker has completed 78,883 metres of drilling consisting of
134 holes. Five drill rigs are currently active at the Bralorne Gold Project. There are currently 28
holes consisting of 11,579 samples at the assay laboratory and are expected to be received by the
Company shortly.
Table 1: Received and Pending Intercepts with Visible Gold Count and Vein Count
Drill Hole
Intrusive
Intercept
Thickness
(m)
Visible
Gold
Count
Major
Veins
Minor
Veins
Count
Assay Results
Gram-metres
Section
Line
Closest to
Collar
SB-2021-025
77
0
5
138
1.36g/t over 68.9
104.72
515,800 E
SB-2021-026
108
3
14
172
1.17g/t over 106.75m
124.90
515,600 E
SB-2021-030
130
3
9
97
0.80g/t over 130.9m
104.72
515,600 E
SB-2021-040
440
12
22
626
1.02g/t over 114.15m
116.43
515,600 E
SB-2021-048
790
8
76
1378
1.0g/t over 116.25m
116.25
515,650 E
SB-2021-055
38
0
4
90
0.68g/t over 51.50
35.02
515,600 E
SB-2021-060
101
0
7
208
Results Pending
515,550 E
SB-2021-063
120
4
4
385
Results Pending
515,550 E
SB-2021-066
177
0
9
389
Results Pending
515,450 E
SB-2021-069
427
8
11
873
Results Pending
515,300 E
SB-2021-070
200
1
10
624
Results Pending
515,250 E
SB-2021-072
237
3
25
1263
Results Pending
515,200 E
SB-2021-075
340
4
22
644
Results Pending
SB-2021-076
225
3
16
420
Results Pending
SB-2021-078
Drilling Now
0*
19*
422*
Drilling Now
SB-2021-025A
Pioneer Block
Drilled on an azimuth of 227 at a dip of -45.
Complete results have been received from this hole.
This hole was drilled to a final depth of
395m
on
April 9, 2021
.
Table 2: Bralorne Gold Project - Drill Hole SB-2021-25
Diamond Drill Hole Name
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Zone
Method Reported
SB-2021-025
157
158
1
0.98
New Bulk Zone
GO_FAA50V10
SB-2021-025
158
159
1
2.64
GO_FAA50V10
SB-2021-025
159
160
1
0.78
GO_FAA50V10
SB-2021-025
160
161
1
0.17
GO_FAA50V10
SB-2021-025
161
162
1
0.77
GO_FAA50V10
SB-2021-025
162
163.15
1.15
0.01
GO_FAA50V10
SB-2021-025
163.15
163.85
0.7
0.50
GO_FAA50V10
SB-2021-025
163.85
164.9
1.05
1.12
GO_FAA50V10
SB-2021-025
164.9
166.05
1.15
0.28
GO_FAA50V10
SB-2021-025
166.05
167.35
1.3
0.04
GO_FAA50V10
SB-2021-025
167.35
168.4
1.05
0.01
GO_FAA50V10
SB-2021-025
168.4
169.45
1.05
0.22
GO_FAA50V10
SB-2021-025
169.45
170.75
1.3
0.01
GO_FAA50V10
SB-2021-025
170.75
172.05
1.3
0.01
GO_FAA50V10
SB-2021-025
172.05
173.15
1.1
0.01
GO_FAA50V10
SB-2021-025
173.15
174.6
1.45
0.01
GO_FAA50V10
SB-2021-025
174.6
176
1.4
0.01
GO_FAA50V10
SB-2021-025
176
177.5
1.5
0.01
GO_FAA50V10
SB-2021-025
177.5
178.75
1.25
0.05
GO_FAA50V10
SB-2021-025
178.75
180
1.25
0.10
GO_FAA50V10
SB-2021-025
180
181.25
1.25
0.03
New Bulk Zone
GO_FAA50V10
SB-2021-025
181.25
182
0.75
0.06
GO_FAA50V10
SB-2021-025
182
183.25
1.25
0.02
GO_FAA50V10
SB-2021-025
183.25
184.15
0.9
0.08
GO_FAA50V10
SB-2021-025
184.15
185.6
1.45
0.03
GO_FAA50V10
SB-2021-025
185.6
186.95
1.35
0.02
GO_FAA50V10
SB-2021-025
186.95
188
1.05
0.14
GO_FAA50V10
SB-2021-025
188
189
1
0.55
GO_FAA50V10
SB-2021-025
189
189.7
0.7
2.07
GO_FAA50V10
SB-2021-025
189.7
191
1.3
0.45
GO_FAA50V10
SB-2021-025
191
191.9
0.9
0.27
GO_FAA50V10
SB-2021-025
191.9
192.6
0.7
0.13
GO_FAA50V10
SB-2021-025
192.6
193.5
0.9
0.14
GO_FAA50V10
SB-2021-025
193.5
194.7
1.2
0.14
GO_FAA50V10
SB-2021-025
194.7
195.6
0.9
3.35
GO_FAA50V10
SB-2021-025
195.6
196.6
1
1.51
GO_FAA50V10
SB-2021-025
196.6
197.6
1
3.60
GO_FAA50V10
SB-2021-025
197.6
198.45
0.85
1.64
GO_FAA50V10
SB-2021-025
198.45
199.6
1.15
0.60
GO_FAA50V10
SB-2021-025
199.6
201
1.4
0.74
GO_FAA50V10
SB-2021-025
201
202.45
1.45
1.49
GO_FAA50V10
SB-2021-025
202.45
203.85
1.4
0.30
GO_FAA50V10
SB-2021-025
203.85
204.4
0.55
0.33
GO_FAA50V10
SB-2021-025
204.4
205.05
0.65
0.68
GO_FAA50V10
SB-2021-025
205.05
206
0.95
0.01
GO_FAA50V10
SB-2021-025
206
207.5
1.5
0.01
GO_FAA50V10
SB-2021-025
207.5
209
1.5
0.01
GO_FAA50V10
SB-2021-025
209
210.05
1.05
0.01
GO_FAA50V10
SB-2021-025
210.05
210.6
0.55
0.70
GO_FAA50V10
SB-2021-025
210.6
212
1.4
0.02
GO_FAA50V10
SB-2021-025
212
213.5
1.5
0.05
GO_FAA50V10
SB-2021-025
213.5
215
1.5
0.01
GO_FAA50V10
SB-2021-025
215
216.5
1.5
0.01
GO_FAA50V10
SB-2021-025
216.5
217.5
1
0.01
GO_FAA50V10
SB-2021-025
217.5
218.5
1
0.01
GO_FAA50V10
SB-2021-025
218.5
219.1
0.6
0.33
GO_FAA50V10
SB-2021-025
219.1
219.85
0.75
1.27
GO_FAA50V10
SB-2021-025
219.85
220.85
1
0.01
GO_FAA50V10
SB-2021-025
220.85
222
1.15
0.01
GO_FAA50V10
SB-2021-025
222
223
1
0.01
GO_FAA50V10
SB-2021-025
223
224.25
1.25
0.03
GO_FAA50V10
SB-2021-025
224.25
225
0.75
0.58
GO_FAA50V10
SB-2021-025
225
226.05
1.05
1.26
GO_FAA50V10
SB-2021-025
226.05
227.3
1.25
0.08
New Bulk Zone
GO_FAA50V10
SB-2021-025
227.3
228.6
1.3
0.01
GO_FAA50V10
SB-2021-025
228.6
229.7
1.1
0.01
GO_FAA50V10
SB-2021-025
229.7
231.15
1.45
0.50
GO_FAA50V10
SB-2021-025
231.15
232.65
1.5
0.44
GO_FAA50V10
SB-2021-025
232.65
234.15
1.5
0.15
GO_FAA50V10
SB-2021-025
234.15
235.45
1.3
0.03
GO_FAA50V10
SB-2021-025
235.45
236.75
1.3
0.01
GO_FAA50V10
SB-2021-025
236.75
237.9
1.15
0.04
GO_FAA50V10
SB-2021-025
237.9
239
1.1
0.28
GO_FAA50V10
SB-2021-025
239
239.8
0.8
0.22
GO_FAA50V10
SB-2021-025
239.8
240.45
0.65
3.72
GO_FAA50V10
SB-2021-025
240.45
241.45
1
0.01
GO_FAA50V10
SB-2021-025
241.45
242.75
1.3
0.19
GO_FAA50V10
SB-2021-025
242.75
244.1
1.35
0.03
GO_FAA50V10
SB-2021-025
244.1
245.35
1.25
0.01
GO_FAA50V10
SB-2021-025
245.35
246.7
1.35
0.01
GO_FAA50V10
SB-2021-025
246.7
247.3
0.6
0.64
GO_FAA50V10
SB-2021-025
247.3
248.35
1.05
0.03
GO_FAA50V10
SB-2021-025
248.35
249.25
0.9
0.01
GO_FAA50V10
SB-2021-025
249.25
250.65
1.4
0.01
GO_FAA50V10
SB-2021-025
250.65
252
1.35
0.01
GO_FAA50V10
SB-2021-025
252
253.45
1.45
0.01
GO_FAA50V10
SB-2021-025
253.45
254.75
1.3
0.01
GO_FAA50V10
SB-2021-025
254.75
255.5
0.75
0.01
GO_FAA50V10
SB-2021-025
255.5
256.25
0.75
2.30
GO_FAA50V10
SB-2021-025
256.25
257
0.75
0.02
GO_FAA50V10
SB-2021-025
257
257.95
0.95
0.01
GO_FAA50V10
SB-2021-025
257.95
258.8
0.85
0.01
GO_FAA50V10
SB-2021-025
258.8
259.8
1
0.02
GO_FAA50V10
SB-2021-025
259.8
260.75
0.95
0.01
GO_FAA50V10
SB-2021-025
260.75
261.5
0.75
0.17
GO_FAA50V10
SB-2021-025
261.5
262.25
0.75
2.77
Main Vein
GO_FAA50V10
SB-2021-025
262.25
263
0.75
32.50
GO_FAA50V10
SB-2021-025
263
263.5
0.5
3.79
GO_FAA50V10
SB-2021-025
263.5
264.25
0.75
1.67
GO_FAA50V10
SB-2021-025
264.25
264.95
0.7
0.94
GO_FAA50V10
SB-2021-025
264.95
266
1.05
2.80
GO_FAA50V10
SB-2021-025
266
267.3
1.3
0.16
GO_FAA50V10
SB-2021-025
267.3
268.4
1.1
0.29
GO_FAA50V10
SB-2021-025
268.4
269.15
0.75
0.01
GO_FAA50V10
SB-2021-025
269.15
269.9
0.75
0.64
GO_FAA50V10
SB-2021-025
269.9
271.1
1.2
0.62
GO_FAA50V10
SB-2021-025
271.1
271.65
0.55
2.73
GO_FAA50V10
SB-2021-025
271.65
272.45
0.8
0.13
GO_FAA50V10
SB-2021-025
272.45
273.4
0.95
0.02
GO_FAA50V10
SB-2021-025
273.4
274.2
0.8
0.02
GO_FAA50V10
SB-2021-025
274.2
274.7
0.5
8.50
GO_FAA50V10
SB-2021-025
274.7
275.25
0.55
0.19
GO_FAA50V10
SB-2021-025
275.25
276.1
0.85
0.04
Main Vein
GO_FAA50V10
SB-2021-025
276.1
277.35
1.25
0.02
GO_FAA50V10
SB-2021-025
277.35
278.3
0.95
0.10
GO_FAA50V10
SB-2021-025
278.3
279.25
0.95
0.09
GO_FAA50V10
SB-2021-025
279.25
280.65
1.4
0.01
GO_FAA50V10
SB-2021-025
280.65
282
1.35
0.01
GO_FAA50V10
SB-2021-025
282
283.15
1.15
0.02
GO_FAA50V10
SB-2021-025
283.15
284.15
1
0.12
GO_FAA50V10
SB-2021-025
284.15
285
0.85
0.01
GO_FAA50V10
SB-2021-025
285
286
1
0.02
GO_FAA50V10
SB-2021-025
286
287
1
0.01
GO_FAA50V10
SB-2021-025
287
288.5
1.5
0.01
GO_FAA50V10
SB-2021-025
288.5
290
1.5
0.01
GO_FAA50V10
SB-2021-025
290
291.5
1.5
0.01
GO_FAA50V10
SB-2021-025
291.5
293
1.5
0.01
GO_FAA50V10
SB-2021-025
293
294.45
1.45
0.01
GO_FAA50V10
SB-2021-025
294.45
295.5
1.05
0.01
GO_FAA50V10
SB-2021-025
295.5
296
0.5
0.16
GO_FAA50V10
SB-2021-025
296
296.5
0.5
0.93
GO_FAA50V10
SB-2021-025
296.5
297.1
0.6
0.32
GO_FAA50V10
SB-2021-025
297.1
298
0.9
0.01
GO_FAA50V10
SB-2021-025
298
298.5
0.5
0.01
GO_FAA50V10
SB-2021-025
298.5
299
0.5
0.14
GO_FAA50V10
SB-2021-025
299
300
1
1.49
GO_FAA50V10
SB-2021-025
300
301.2
1.2
0.01
GO_FAA50V10
SB-2021-025
301.2
302.45
1.25
0.01
GO_FAA50V10
SB-2021-025
302.45
303.9
1.45
0.01
GO_FAA50V10
SB-2021-025
303.9
305.3
1.4
0.01
GO_FAA50V10
SB-2021-025
305.3
306.65
1.35
0.03
GO_FAA50V10
SB-2021-025
306.65
308
1.35
0.07
GO_FAA50V10
SB-2021-025
308
309.35
1.35
0.12
CGFI Bulk
GO_FAA50V10
SB-2021-025
309.35
310.7
1.35
0.35
GO_FAA50V10
SB-2021-025
310.7
312.05
1.35
0.55
GO_FAA50V10
SB-2021-025
312.05
313.4
1.35
0.27
GO_FAA50V10
SB-2021-025
313.4
314.7
1.3
0.06
GO_FAA50V10
SB-2021-025
314.7
315.9
1.2
0.04
GO_FAA50V10
SB-2021-025
315.9
317
1.1
0.16
GO_FAA50V10
SB-2021-025
317
318
1
0.32
CGFI Bulk
GO_FAA50V10
SB-2021-025
318
319
1
0.04
GO_FAA50V10
SB-2021-025
319
319.9
0.9
0.25
GO_FAA50V10
SB-2021-025
319.9
320.9
1
0.68
GO_FAA50V10
SB-2021-025
320.9
322.2
1.3
0.01
GO_FAA50V10
SB-2021-025
322.2
323.4
1.2
0.08
GO_FAA50V10
SB-2021-025
323.4
324.1
0.7
0.03
GO_FAA50V10
SB-2021-025
324.1
324.6
0.5
0.02
GO_FAA50V10
SB-2021-025
324.6
325.55
0.95
0.51
GO_FAA50V10
SB-2021-025
325.55
326.75
1.2
0.65
GO_FAA50V10
SB-2021-025
326.75
327.8
1.05
0.41
GO_FAA50V10
SB-2021-025
327.8
328.8
1
0.49
GO_FAA50V10
SB-2021-025
328.8
330
1.2
0.71
GO_FAA50V10
SB-2021-025
330
331
1
0.03
GO_FAA50V10
SB-2021-025
331
331.5
0.5
0.82
GO_FAA50V10
SB-2021-025
331.5
332.45
0.95
0.39
GO_FAA50V10
SB-2021-025
332.45
333.45
1
0.58
GO_FAA50V10
SB-2021-025
333.45
334.3
0.85
1.23
GO_FAA50V10
SB-2021-025
334.3
335.2
0.9
0.75
GO_FAA50V10
SB-2021-025
335.2
336.5
1.3
0.44
GO_FAA50V10
SB-2021-025
336.5
337.8
1.3
0.26
GO_FAA50V10
SB-2021-025
337.8
339
1.2
1.09
GO_FAA50V10
SB-2021-025
339
340.4
1.4
26.14
GO_FAA50V10
SB-2021-025
340.4
341.7
1.3
0.87
GO_FAA50V10
SB-2021-025
341.7
343.05
1.35
0.37
GO_FAA50V10
SB-2021-025
343.05
344.35
1.3
1.02
GO_FAA50V10
SB-2021-025
344.35
345.3
0.95
0.48
GO_FAA50V10
SB-2021-025
345.3
345.95
0.65
0.22
GO_FAA50V10
SB-2021-025
345.95
346.6
0.65
0.61
GO_FAA50V10
SB-2021-025
346.6
347.6
1
0.76
GO_FAA50V10
SB-2021-025
347.6
348.75
1.15
0.22
GO_FAA50V10
SB-2021-025
348.75
349.25
0.5
1.02
GO_FAA50V10
SB-2021-025
349.25
349.9
0.65
4.17
GO_FAA50V10
SB-2021-025
349.9
350.55
0.65
0.45
GO_FAA50V10
SB-2021-025
350.55
351.65
1.1
0.35
GO_FAA50V10
SB-2021-025
351.65
352.75
1.1
5.85
GO_FAA50V10
SB-2021-025
352.75
353.9
1.15
0.50
GO_FAA50V10
SB-2021-025
353.9
355
1.1
14.99
GO_FAA50V10
SB-2021-025
355
356.2
1.2
0.77
GO_FAA50V10
SB-2021-025
356.2
357.4
1.2
0.53
GO_FAA50V10
SB-2021-025
357.4
358.55
1.15
0.59
GO_FAA50V10
SB-2021-025
358.55
359.45
0.9
0.06
GO_FAA50V10
SB-2021-025
359.45
360.4
0.95
0.67
GO_FAA50V10
SB-2021-025
360.4
361.6
1.2
0.03
GO_FAA50V10
SB-2021-025
361.6
362.75
1.15
0.22
CGFI Bulk
GO_FAA50V10
SB-2021-025
362.75
363.95
1.2
0.27
GO_FAA50V10
SB-2021-025
363.95
365.25
1.3
0.30
GO_FAA50V10
SB-2021-025
365.25
366.3
1.05
0.75
GO_FAA50V10
SB-2021-025
366.3
367.5
1.2
1.48
GO_FAA50V10
SB-2021-025
367.5
368.75
1.25
0.11
GO_FAA50V10
SB-2021-025
368.75
369.75
1
0.08
GO_FAA50V10
SB-2021-025
369.75
370.75
1
2.47
GO_FAA50V10
SB-2021-025
370.75
371.55
0.8
1.55
GO_FAA50V10
SB-2021-025
371.55
372.55
1
1.64
GO_FAA50V10
SB-2021-025
372.55
374
1.45
0.24
GO_FAA50V10
SB-2021-025
374
375.5
1.5
0.07
GO_FAA50V10
SB-2021-025
375.5
376.9
1.4
0.43
GO_FAA50V10
Notes: Diamond drill hole SB-2021-025 has collar orientation of Azimuth 227; Dip -45. True widths are estimated at 40 - 90% of intercept lengths and are based on oriented core
measurements where available. Method Reported includes the most up to date information as of the date of this press release.
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne
Gold Project has been approved by
Leonardo de Souza
(BSc, AusIMM (CP) Membership 224827),
Talisker's Vice President, Exploration and Resource Development, who is a "qualified person" within
the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker is a junior resource company involved in the exploration of gold projects in
British Columbia,
Canada
. Talisker's projects include the Bralorne Gold Complex, an advanced stage project with
significant exploration potential from a historical high-grade producing gold mine as well as its
Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge Gold Belt
and several other early-stage Greenfields projects. With its properties comprising 282,403 hectares
over 258 claims, three leases and 198 crown grant claims, Talisker is a dominant exploration player
in the south-central
British Columbia
. The Company is well funded to advance its aggressive
systematic exploration program at its projects.
Related Links
https://taliskerresources.com/
Sample Preparation and QAQC
Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm
respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis.
Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder
samples bracket the interval of interest such that a total sampled core length of not less than
3m
both above and below the interval of interest must be assigned. Sample QAQC measures of
unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample
sequence and make up 9% of the samples submitted to the lab for holes reported in this release.
Sample preparation and analyses is carried out by ALS Global in
North Vancouver, British Columbia
,
Canada and SGS Canada in
Burnaby, British Columbia
, Canada. Drill core sample preparation
includes drying in an oven at a maximum temperature of 60°C, fine crushing of the sample to at least
70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250 g split to at
least 85% passing 75 microns (ALS code PREP-31 / SGS code PRP89). Gold in diamond drill core
is analysed by fire assay and atomic absorption spectroscopy (AAS) of a 50g sample (ALS code
Au-AA26 / SGS code GO_FAA50V10), while multi-element chemistry is analysed by 4- Acid
digestion of a 0.25 g sample split with detection by inductively coupled plasma mass spectrometer
(ICP-MS) for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In,
K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W,
Y, Zn, Zr). Gold assay technique (ALS code Au-AA26 / SGS code FAA50V10) has an upper
detection limit of 100 ppm. Any sample that produces an over-limit gold value via the gold assay
technique is sent for gravimetric finish (ALS method Au-GRA22 / SGS method GO_FAG50V) which
has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are sent
directly to screen metallics analysis and all samples that fire assay above 1 ppm Au are re-analysed
with method (ALS code Au-
SCR24
/ SGS code - 6 - GO_FAS50M) which employs a 1kg pulp
screened to 100 microns with assay of the entire oversize fraction and duplicate 50g assays on the
undersize fraction. Where possible all samples initially sent to screen metallics processing will also
be re-run through the fire assay with gravimetric finish provided there is enough material left for
further processing
Caution Regarding Forward-Looking Information
Certain statements contained in this press release constitute forward-looking information. These
statements relate to future events or future performance. The use of any of the words "could",
"intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements
relating to matters that are not historical facts are intended to identify forward-looking information
and are based on Talisker's current belief or assumptions as to the outcome and timing of such
future events. Actual future results may differ materially. In particular, this release contains forward-
looking information relating to, among other things, effective time of the rights provided to New Gold
under the Investor Rights Agreement, the completion of New Gold's strategic investment; the
completion of the Offering, the use of proceeds, the operations of the Company and the timing which
could be affected by the current global COVID-19 pandemic. Those assumptions and factors are
based on information currently available to Talisker. Although such statements are based on
reasonable assumptions of Talisker's management, there can be no assurance that any conclusions
or forecasts will prove to be accurate.
While Talisker considers these statements to be reasonable based on information currently
available, they may prove to be incorrect. Forward-looking information involves known and unknown
risks, uncertainties and other factors which may cause the actual results, performance or
achievements to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking information. Such factors include market risks and the
demand for securities of the Company, risks inherent in the exploration and development of mineral
deposits, including risks relating to changes in project parameters as plans continue to be redefined,
risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and
the worldwide demand for and supply of minerals, risks related to increased competition and current
global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on key
personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the
necessary licenses and permits, financing, capitalization and liquidity risks.
The forward-looking information contained in this news release is made as of the date hereof, and
Talisker is not obligated to update or revise any forward-looking information, whether as a result of
new information, future events or otherwise, except as required by applicable securities laws.
Because of the risks, uncertainties and assumptions contained herein, investors should not place
undue reliance on forward-looking information. The foregoing statements expressly qualify any
forward-looking information contained herein.
Figure 1: Pioneer zone with drill traces of completed drill hole SB-2021-025 (CNW Group/Talisker
Resources Ltd)
Figure 2: Plan view map showing drill hole collar and traces within the Pioneer Zone. (CNW
Group/Talisker Resources Ltd)
Figure 3: Example of bulk tonnage mineralization within the Granite. Strong Major and Minor veining
with pervasive Silica alteration between 349m-358.25m in hole SB-2021-025. (CNW Group/Talisker
Resources Ltd)
SOURCE
Talisker Resources Ltd
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/September2021/16/c4694.html
%SEDAR: 00005798E
For further information:
please contact Terry Harbort, Chief Executive Officer of Talisker, at
CO: Talisker Resources Ltd
CNW 07:00e 16-SEP-21