Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TSK.TO ·

Talisker Expands Land Position at Bralorne Gold Project and Appoints Vice President, Exploration & Resource Development

Management Changes Mergers & Acquisitions Property Options & Staking

Talisker Expands Land Position at Bralorne

Gold Project and Appoints Vice President,

Exploration & Resource Development

TORONTO

,

March 26, 2020

/CNW/ - Talisker Resources Ltd. ("Talisker" or the "Company") (CSE:

TSK) (OTCQB: TSKFF) is pleased to announce that the Company has expanded its land position in

the Bralorne Gold Camp with the acquisition of the Royalle property increasing the strike length of

Talisker's 100% owned Bralorne Gold Project. Under the terms of the agreement, Talisker has

agreed to pay

$60,000

cash and to issue 600,000 common shares of Talisker. The Vendor will

retain a 1% NSR that Talisker can purchase for

$1,000,000

.

The Royalle property consists of four claim blocks comprising 3,827 hectares (the "Property"). The

claims sit directly south of the historic Bralorne-Pioneer mine along strike of the Cadwaller break and

host eight exploration targets including mesothermal gold and silver veins and skarn style

mineralization. The main target is the Piebiter zone with historic adit sampling returning gold grades

of 4.3 g/t over 21 meters and selective grab samples of up to 227 g/t Au. The Chopper silver vein

has been delineated for 2,400 meters and with selective grab samples up to 1,585 g/t Ag. The

Company notes that these selected samples are not necessarily representative of the mineralization

hosted on the Property and limited drilling has been completed on the Property. A qualified person

has not verified the data disclosed in respect of the Property, including sampling, analytical and test

data underlying this information. The data comes from historic reports prepared by previous owners.

The acquisition is subject to the approval of the Canadian Securities Exchange.

Talisker also announces the appointment of

Leonardo de Souza

as Vice President, Exploration and

Resource Development.

Ruben Padilla

, the Company's former Vice President, Exploration has been

appointed Director of Geology.

Leonardo holds a Bachelor of Science from the Universidade de

Brasilia, Brazil

. He has 35 years of

experience in mineral exploration and 21 years in mineral resource estimation. In exploration, his

majority experience is in brownfields exploration for gold and copper, having participated in the

addition of over 9 Moz of gold resources in the operations of AngloGold in

South America

, and over

2 Moz of gold plus 4.6 Blbs of copper in resources of the Salobo project in

Brazil

for

Anglo

American

. In resource estimation, Leonardo's experience spans a range of commodities and deposit

styles in a number of countries, performing resource evaluations from grassroots opportunities to

feasibility studies and mining operations. Leonardo is a Certified Professional (CP) and member of

the Australian Institute of Mining and Metallurgy (AusIMM).

"The acquisition of the Royalle property increases the regional upside potential of the Bralorne Gold

Camp with known mesothermal vein systems and characteristics similar to the Bralrone-Pioneer

deposit, adding upside potential to the Bralorne Gold Project as a whole," stated

Terence Harbort

,

President and CEO, who added on the appointment of

Leonardo de Souza

, "Leonardo provides a

wealth of targeting and resource development experience in vein systems similar to Bralorne such as

the world class Cuiabá, Corrego do Sitio and Serra Grande Mines in

Brazil

and most recently by

leading the resource modelling at Barkerville Gold Mines' Cariboo Project delivering over 4Moz in

resources."

About Talisker Resources Ltd.

Talisker Resources Ltd. is a junior resource company involved in the exploration of gold projects in

British Columbia, Canada

. Talisker's projects include the Bralorne Gold Complex, an advanced stage

project with significant exploration potential from a historical high-grade producing gold mine as well

as its Spences Bridge Project where the Company holds ~85% of the emerging Spences Bridge

Gold Belt and several other early stage Greenfields projects. With its properties comprising 274,432

hectares over 292 claims, three leases and 154 crown grant claims, Talisker is a dominant

exploration player in the south-central

British Columbia

. The Company is well funded to advance its

aggressive systematic exploration program at its projects.

Related Links -

taliskerresources.com

Qualified Person

The technical information contained in this news release has been approved by

Leonardo de Souza

(BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource

Development, who is a "qualified person" within the meaning of National Instrument 43-101,

Standards of Disclosure for Mineral Projects.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the

CSE) accepts responsibility for the adequacy or accuracy of this release. No stock exchange,

securities commission or other regulatory authority has approved or disapproved the information

contained herein.

SOURCE

Talisker Resources Ltd

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2020/26/c9266.html

%SEDAR: 00005798E

For further information:

please contact Terry Harbort, Chief Executive Officer of Talisker, at

[email protected] or (416) 361-2808.

CO: Talisker Resources Ltd

CNW 14:27e 26-MAR-20