Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TSK.TO ·

Talisker Announces Assay Results for Second Drill Hole at Bralorne Gold Project

Drill Results

Talisker Announces Assay Results for Second

Drill Hole at Bralorne Gold Project

●

Intersects 32.2 g/t Au over

0.97 m

●

TORONTO

,

May 5, 2020

/CNW/ - Talisker Resources Ltd. ("Talisker" or the "Company")

(CSE:TSK) (OTCQB:TSKFF) is pleased to announce results from the second drill hole at the

Bralorne Gold Project located in

British Columbia

. Talisker is undertaking a

11,200m

drill program

targeting high-grade veins at the Project (see press release of

February 12, 2020

). Results from

hole SB-2020-002 follow the announcement of 27.3 g/t Au over

0.60 m

in hole one (SB-2020-001)

on

April 1, 2020

. SB-2020-002 targeted the down dip continuity of the same structures intersected in

hole SB-2020-001; the PHW, P Main, and the J Veins. Additional results from the remaining three

drilled in the first quarter will be released when received.

Highlights include:

17.35 g/t Au over

0.80m

from

247.40m

to

248.20m

intersecting the PHW Vein

32.20 g/t Au over

0.97m

from

414.40m

to

415.37m

intersecting the P Main Vein

Similar to hole one, significant gold mineralization was also identified in the altered halos surrounding

the veins in both footwall and hanging wall locations associated with intense silica-sericite alteration.

Highlights of non-vein mineralization include:

Hanging wall to the PHW Vein

2.31 g/t Au over

1m

from

245.4m

to

246.4m

0.54 g/t Au over

1m

from

246.4m

to

247.4m

Footwall to the PHW Vein

0.67 g/t Au over

1m

from

248.2m

to

249.2m

0.44 g/t Au over

1m

from

249.2m

to

250.2m

Hanging wall to the P Main Vein

2.19 g/t Au over

1.4m

from

413.0m

to

413.4m

Select results from the second drill hole are listed in the following table and a map and cross section

displaying the location of the drill hole and mineralized intercepts is attached to this press release.

"Hole 2 gives us a good indication of down dip structural continuity extending intercepts from hole 1;

87m

for the P Main,

60m

for the J vein and

30m

for the PHW vein," commented

Terry Harbort

,

President and CEO of Talisker, who added, "We are encouraged again by the high-grade gold

results and the persistence of the mineralised halo adjacent to the veins."

Talisker will be providing the opportunity for shareholders and other interested parties to participate

in a Webinar to be held at 4 pm ET on

Thursday, May 7

th

. To join, please click on the following link -

https://us02web.zoom.us/j/83109137095

.

Bralorne Gold Project

Drill Hole ID SB-2020-002

Sample

Number

From

(m)

To

(m)

Interval

(m)

Au g/t

Interpreted

Structure

Method

Reported

B0215948

223.20

224.20

1.00

3.82

PHW Vein Splay

Au-SCR24

B0215949

224.20

224.80

0.60

1.25

PHW Vein Splay

Au-SCR24

B0215950

224.80

225.30

0.50

2.66

PHW Vein Splay

Au-AA24

B0215972

245.40

246.40

1.00

2.31

Vein Halo

Au-AA24

B0215973

246.40

247.40

1.00

0.54

Vein Halo

Au-AA24

B0215974

247.40

248.20

0.80

17.35

PHW Vein

Au-SCR24

B0215975

248.20

249.20

1.00

0.67

Vein Halo

Au-AA24

B0215976

249.20

250.20

1.00

0.44

Vein Halo

Au-AA24

B0216078

413.00

414.40

1.40

2.19

Vein Halo

Au-AA24

B0216079

414.40

415.37

0.97

32.2

P Main Vein

Au-SCR24

B0216121

472.05

472.60

0.55

1.15

J Vein

Au-AA24

Notes: Diamond drill hole SB-2020-002 was collared at an azimuth of 203 degrees, and a downward dip of 67 degrees. True widths are estimated at 70 - 90% of intercept lengths

and are based on oriented core measurements. Method Reported includes the most up to date information as of the date of this press release.

About Talisker Resources Ltd.

Talisker (

taliskerresources.com

)

is a junior resource company involved in the exploration of gold

projects in

British Columbia, Canada

. Talisker's projects include the Bralorne Gold Complex, an

advanced stage project with significant exploration potential from a historical high-grade producing

gold mine as well as its Spences Bridge Project where the Company holds ~85% of the emerging

Spences Bridge Gold Belt and several other early stage Greenfields projects. With its properties

comprising 277,292 hectares over 312 claims, six leases and 181 crown grant claims, Talisker is a

dominant exploration player in the south-central

British Columbia

. The Company is well funded to

advance its aggressive systematic exploration program at its projects.

Qualified Person

The technical information contained in this news release has been approved by

Leonardo de Souza

(BSc, AusIMM (CP) Membership 224827), Talisker's Vice President, Exploration and Resource

Development, who is a "qualified person" within the meaning of National Instrument 43-101,

Standards of Disclosure for Mineral Projects.

Sample Preparation and QAQC

Drill core at the Bralorne project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm

respectively). Drill core samples are minimum 50 cm and maximum 160 cm long along the core axis.

Samples are focused on an interval of interest such as a vein or zone of mineralization. Shoulder

samples bracket the interval of interest such that a total sampled core length of

3 m

both above and

below the interval of interest must be assigned. Sample QAQC measures of unmarked certified

reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and

make up 8% of the samples submitted to the lab for hole SB-2020-002.

Sample preparation and analyses is carried out by ALS Global, at their laboratory in

North

Vancouver, British Columbia

, Canada. Drill core sample preparation includes drying in an oven at a

maximum temperature of 60°C, fine crushing of the sample to at least 70% passing less than 2 mm,

sample splitting using a riffle splitter, and pulverizing a 250 g split to at least 85% passing 75

microns (code PREP-31).

Gold and in diamond drill core is analysed by fire assay and atomic absorption spectroscopy (AAS)

of a 50g sample (code Au-AA24), while multi-element chemistry is analysed by 4-Acid digestion of a

0.25 g sample split with detection by inductively coupled plasma mass spectrometer (ICP-MS) for

48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg,

Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn, Zr).

Gold assay technique Au-AA24 has an upper detection limit of 10ppm. Any sample that produces an

over-limit gold value via the Au-AA24 technique is sent for gravimetric finish via method Au-GRA22

which has an upper detection limit of 1,000 ppm Au. Samples where visible gold was observed are

sent directly to screen metallics analysis and all samples that fire assay above 3 ppm Au are re-

analysed with method Au-

SCR24

which employs a 1kg pulp screened to 100 microns with assay of

the entire oversize fraction and duplicate 50g assays on the undersize fraction. Where possible all

samples initially sent to screen metallics processing will also be re-run through the fire assay with

gravimetric finish provided there is enough material left for further processing.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. The use of any of the words "could",

"intend", "expect", "believe", "will", "projected", "estimated" and similar expressions and statements

relating to matters that are not historical facts are intended to identify forward-looking information

and are based on Talisker's current belief or assumptions as to the outcome and timing of such

future events. Actual future results may differ materially. In particular, this release contains forward-

looking information relating to, among other things, the operations of the Company and the timing

which could be affected by the current global COVID-19 pandemic. Those assumptions and factors

are based on information currently available to Talisker. Although such statements are based on

reasonable assumptions of Talisker's management, there can be no assurance that any conclusions

or forecasts will prove to be accurate.

While Talisker considers these assumptions to be reasonable based on information currently

available, they may prove to be incorrect. Forward looking information involves known and unknown

risks, uncertainties and other factors which may cause the actual results, performance or

achievements to be materially different from any future results, performance or achievements

expressed or implied by the forward-looking information. Such factors include risks inherent in the

exploration and development of mineral deposits, including risks relating to changes in project

parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates,

risks relating to changes in mineral prices and the worldwide demand for and supply of minerals,

risks related to increased competition and current global financial conditions and the COVID-19

pandemic, access and supply risks, reliance on key personnel, operational risks, and regulatory

risks, including risks relating to the acquisition of the necessary licenses and permits, financing,

capitalization and liquidity risks.

The forward-looking information contained in this release is made as of the date hereof, and Talisker

is not obligated to update or revise any forward-looking information, whether as a result of new

information, future events or otherwise, except as required by applicable securities laws. Because of

the risks, uncertainties and assumptions contained herein, investors should not place undue reliance

on forward-looking information. The foregoing statements expressly qualify any forward-looking

information contained herein.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the

CSE) accepts responsibility for the adequacy or accuracy of this release. No stock exchange,

securities commission or other regulatory authority has approved or disapproved the information

contained herein.

Figure 1 (CNW Group/Talisker Resources Ltd)

Figure 2 (CNW Group/Talisker Resources Ltd)

SOURCE

Talisker Resources Ltd

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/May2020/05/c2227.html

%SEDAR: 00005798E

For further information:

Terry Harbort, Chief Executive Officer,

[email protected], +1 416 361 2808; Carrie Howes, Director, Investor Relations,

[email protected], +1 416 837 0075

CO: Talisker Resources Ltd

CNW 06:45e 05-MAY-20