TriStar Gold Updates Economics of PFS with After-Tax 40% IRR and US$603 Million NPV5 and Provides Update on Permit After-tax NPV 5% of US$1,353 million at approx. spot of US$3,200 gold price After-tax NPV 5% of US$603 million at US$2,200 base-case gold price

Economic Studies

TriStar Gold Updates Economics of PFS with

After-Tax 40% IRR and US$603 Million NPV5

and Provides Update on Permit

After-tax NPV

5%

of US$1,353 million at approx. spot of US$3,200 gold price

After-tax NPV

5%

of US$603 million at US$2,200 base-case gold price

A compelling after-tax IRR of 72% at US$3,200 gold and 40% at US$2,200 base case gold

price

AISC of US$1,111/oz

After-tax payback period of 2 years

The Company has received a positive legal opinion on status of the Castelo de Sonhos

Permit, which remains valid and in good standing

Scottsdale, Arizona--(Newsfile Corp. - May 5, 2025) - TriStar Gold Inc. (TSXV: TSG) (OTCQB: TSGZF)

("TriStar" or the "Company), is pleased to announce a prefeasibility study ("Study") update for the

Company's Castelo de Sonhos gold project in southern Pará State, Brazil by GE21 Consultoria Mineral

Ltda ("GE21") of Belo Horizonte, Brazil. There was no change to the mineral resources or reserves, the

focus of the update study was the cost estimate since the release of the previous PFS, as well as to

incorporate changes to the gold price and exchange rates.

Nick Appleyard, TriStar's President and CEO, stated: "The updated Study is a key step in our

advancement of Castelo de Sonhos, demonstrating gold price leverage and robust economics at a time

of record high gold prices and a scarcity of permitted development assets."

Mr. Appleyard continued, "Tristar's Castelo de Sonhos can fill a gap in the gold development space, with

the potential to create value for all stakeholders. We look forward to advancing this project to a

construction decision."

The results of the Study now replace the 2021 prefeasibility study ("PFS"), originally announced in the

Company's press release dated October 5, 2021. The Study has incorporated a new cost estimate for

the planned development of Castelo de Sonhos compared with the 2021 original.

Table 1 below presents a side-by-side comparison of the key metrics of the latest Study and 2021 PFS.

Castelo de Sonhos Metric

2025 PFS Study Update

2021 Prefeasibility

Initial Capital (US$ million)

$296

$261

Base-Case Gold Price (US$/oz)

$2,200

$1,550

AISC (US$/oz)

$1,111

$900

Exchange Rate (1 US$: BRL)

5.75

5.0

After-Tax NPV 5% (US$ million)

$603

$321

Base Case After-Tax IRR (%)

40%

28%

Table 1. Key Metrics Comparison.

The Prefeasibility Study Update

The prefeasibility study update of economic parameters was conducted by GE21 Consultoria Mineral

Ltda ("GE21") of Belo Horizonte, Brazil, who are independent of TriStar.

Key parameters of the Study include:

Review and update all project operating costs.

Review and update all project capital costs.

Economic analyses were carried out based on the resources and reserves that are still considered

current.

Update economics with a base case long-term gold price of US$2,200/oz and a foreign exchange

rate of US$1 = BRL5.75. The economics include the effect of the project royalties, including NSR

royalties totaling 3.5% and Brazilian federal gross royalty of 1.5%.

Project Description

The Castelo de Sonhos operation will include an open pit gold mine and processing facilities with a

nominal milling rate of 10,000 tpd (3.6Mtpa).

Power will be supplied by a 26 km, 138 kV transmission

line from a substation adjacent to Highway 163 near the town of Castelo de Sonhos. At closure, all

buildings will be removed, disturbed lands rehabilitated, and the property returned to otherwise functional

use according to future approved reclamation plans and accepted practices at the time of closure. The

Study incorporates all costs associated with undertaking these measures and is reflected in the project

economics.

Mining will be based on conventional open pit methods (drill-blast-load-haul), which are suited to the

Project location, orebody and local site conditions.

The process flowsheet remains unchanged with whole-ore agitation leaching as the preferred process

flowsheet for project development. The plant will be designed to treat 10,000 tpd through crushing,

grinding, hybrid cyanidation and carbon in leach, carbon acid wash, pressure stripping, and thermal

regeneration. Electrowinning sludge will be dried and smelted to produce doré bars for shipment to third

party refiners. Based on the test work conducted this flowsheet is anticipated to result in a metallurgical

recovery of 98% of the gold delivered to the plant.

Figure 1. Castelo de Sonhos Project Prefeasibility Proposed Layout.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4509/250756_tristarfigure1.jpg

Economic Results

The results of the Study are shown below in Table 2.

A base case gold price of US$2,200 has been

used and a fixed exchange ratio of BRL5.75 (5.75 Brazilian Reals) to US$1.

Parameter

Unit

Pre-tax

Post-tax

Cash flow

US$ millions

1,123

934

IRR

%

46

40

NPV 5%

US$ millions

736

603

NPV 10%

US$ millions

491

393

Cash Cost

US$/oz

1,080

AISC

US$/oz

1,111

Initial Capital

US$ millions

296

Life of mine production

Moz gold

1.33

Average annual production

oz gold

121,000

Payback period (Mine life)

Years

2.0

Table 2. Summary of Economic Results of the Study.

Notes: Estimated All In Sustaining Costs per ounce of gold produced is a Non-GAAP measure that is equal the total of site mining costs, site and

corporate G&A costs, royalties and production taxes, realized gains/losses on hedging transactions, community and permitting costs relating to

current operations, refining costs, site based non-cash remuneration, inventory write-downs, stripping costs, byproduct credits, reclamation costs,

and sustaining costs related to exploration and studies, capital exploration, capitalized stripping and underground mine development, and capital

expenditures, divided by the estimated total ounces of gold produced during the life of the mine.

Economic Sensitivities

The figures and tables below show the sensitivity of after-tax NPV and IRR to changes in the US dollar

gold price.

Figure 2. Sensitivity of after-tax NPV10% (Millions) to gold price, base case highlighted in blue.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4509/250756_tristarfigure2.jpg

Figure 3. Sensitivity of after-tax IRR% to gold price, base case highlighted in blue.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4509/250756_tristarfigure3.jpg

Capital Cost Estimate

The Study outlines an initial capital cost estimate of US$296 million, including a 20% contingency.

Table 3 below summarizes the initial capital cost estimate for the Project.

DESCRIPTION

US$ MILLIONS

Mine

37.3

Power transmission line

10.8

Plant

187.2

Tailings storage facility

11.2

Contingency (20%)

49.3

Total

295.8

Table 3. Summary of major components of initial capital estimate.

Operating Costs

Operating costs by phase for the LOM are provided in Table 4 below.

Parameter

Unit

Process rate

t/day

10,000

Average head grade

g/t

1.1

Phase 1 head grade

g/t

1.3

Phase 2 head grade

g/t

0.8

Gold Recovery

%

98

Mine operating cost (owner operator)

US$/t moved

2.01

Process operating cost

US$/t processed

11.10

G&A

US$/ processed

1.70

LOM strip ratio

Waste t : process t

9 : 1

Table 4. Life of mine summary of operating parameters and costs.

Mineral Resource Estimate

This mineral resource estimate remains unchanged as per the Company press release dated Oct 5,

2021 "TriStar Gold Announces Positive PFS with 1.4 Moz Gold Reserves and pre-tax 33% IRR and

$400 million NPV."

Results are shown in Table 5 below.

Region

Classification

Tonnage

(Mt)

Grade

(g/t Au)

Metal Content

(Moz Au)

Esperança South

Indicated

29.0

1.3

1.2

Inferred

10.0

1.2

0.4

Esperança East

Indicated

5.0

0.8

0.1

Inferred

12.8

0.7

0.3

Esperança Center

Indicated

19.1

0.7

0.4

Inferred

3.3

0.9

0.1

Project Total

Indicated

53.1

1.0

1.8

Inferred

26.0

0.9

0.7

Table 5. Mineral resource estimate1 for the Castelo de Sonhos gold project (with an effective date of October 4, 2021) above a reporting cutoff

grade of 0.26 g/t Au.

1

Project totals may appear not to sum correctly since all numbers have been rounded to reflect the precision of Inferred and Indicated mineral

resource estimates.

2

These are mineral resources and not reserves and as such do not have demonstrated economic viability.

3

The metal content estimates reflect gold in situ, and do not include factors such as external dilution, mining losses and process recovery losses.

4

TriStar is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing or political factors that might materially affect

these mineral resource estimates.

Mineral Reserve Estimate

The Mineral Reserves, which also remain unchanged, for Castelo de Sonhos are a subset of the

Indicated Mineral Resources as shown in Table 5 above.

Probable Mineral Reserves are modified from

Indicated Mineral Resources and are summarized in Table 6.

Inferred Mineral Resources are set to

waste. This mineral reserve estimate remains unchanged as per the Company press release dated Oct

5, 2021 "TriStar Gold Announces Positive PFS with 1.4 Moz Gold Reserves and pre-tax 33% IRR and

$400 million NPV."

Region

Classification

Tonnage

(Mt)

Grade

(g/t Au)

Metal Content

(Moz Au)

Esperança South

Probable

24.2

1.28

0.99

Esperança East

Probable

3.1

0.82

0.08

Esperança Center

Probable

11.4

0.78

0.29

Project Total

Probable

38.7

1.1

1.4

Table 6. The Mineral Reserve estimates were prepared by Guilherme Gomides Ferreira, P.Eng., a GE21, and have an effective date of October 4,

2021.

Mineral Reserves are reported using the 2014 CIM Definition Standards and are estimated in accordance with the 2019 CIM Best Practices

Guidelines. Mineral Reserves are based on the PFS LOM plan.

Mineral Reserves are mined tonnes and grade; and includes consideration for modifying factors such as loss and dilution.

Mineral Reserves are reported at a cut-off of 0.26 g/t gold.

Numbers have been rounded as required by reporting guidelines. There are no other known factors or issues that materially affect the Mineral

Reserve estimate other than which is disclosed above, and normal risks faced by mining projects in the jurisdiction in terms of environmental,

permitting, taxation, socio-economic, marketing, and political factors and additional risk factors as listed in the "Cautionary Note Regarding

Forward-Looking Information" section below.

Legal Opinion on Requests Related to Castelo de Sonhos

TriStar is also pleased to provide the results of an independent legal opinion on the civil inquiry started

by a Federal Public Prosecutor (MPF) to government regulators to investigate the potential impacts of

the Company's Castelo de Sonhos gold project on Indigenous lands; please see TriStar press release

from

October 1, 2024

for details. The Company also notes that the permit remains valid and in good

standing, according to SEMAS, the main regulatory permitting authority in Para State.

TriStar's independent legal advice suggests that the Company has demonstrated that the Castelo de

Sonhos project does not have the potential to interfere with Indigenous lands named in the Prosecutor's

case. The legal opinion also notes that it does not see the preparation of an Indigenous Component

Study and/or the completion of a Free, Prior, and Informed Consultation as justified; both items were

recommended by the MPF.

Legal counsel also noted that the EIA for Castelo de Sonhos is complete, robust and adequate. The

opinion highlights the solid technical and legal defenses presented by TriStar following the MPF's

recommendation. The Lawyers also note the non-binding nature of the MPF recommendations and the

non-acceptance by SEMAS, TriStar's principal regulator, of these recommendations. SEMAS as well as

environmental authority SEMMA have provided responses criticizing the MPF's position. Based on the

legal opinion, evidence does not support the concerns raised by the MPF as there is no impact, direct or

indirect, not even holistic or cosmological, on the ways of life and customs of the indigenous peoples.

Qualified Person

Porfirio Cabaleiro Rodriguez (FAIG #3708), Director of GE21, is the Qualified Person, as defined by

National Instrument 43-101 -

Standards of Disclosure for Mineral Projects

, for the Preliminary

Feasibility Study presented in this press release, is independent of the Company and has approved the

technical disclosure in this press release.

About TriStar

TriStar Gold is an exploration and development company focused on precious metals properties in the

Americas that have the potential to become significant producing mines. The Company's current flagship

property is the Castelo de Sonhos gold project in Pará State, Brazil. TriStar has completed a pre-

feasibility study and is now working to advance the project towards a feasibility study while evaluating

optimization options. The Company's shares trade on the TSX Venture Exchange under the symbol

TSG

and on the OTCQB under the symbol

TSGZF

. Further information is available at

www.tristargold.com

.

On behalf of the board of directors of the Company:

Nick Appleyard

President and CEO

For further information, please contact:

TriStar Gold Inc.

Nick Appleyard

President and CEO

480-794-1244

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.

Forward-Looking Statements

Certain statements contained in this press release may constitute forward-looking statements under

Canadian securities legislation which are not historical facts and are made pursuant to the "safe

harbour" provisions under the United States Private Securities Litigation Reform Act of 1995.

Generally, forward-looking information can be identified by the use of forward-looking terminology

such as "expects" or "it is expected", or variations of such words and phrases or statements that

certain actions, events or results "will" occur. Forward-looking statements in this press release include

all estimates from the Study such as the cash flow, IRR, NPVs, cash cost, AISC, initial capital, life of

mine production, average annual production and payback period time. Such forward-looking

statements are based upon the Company's reasonable expectations and business plan at the date

hereof, which are subject to change depending on economic, political and competitive circumstances

and contingencies. Readers are cautioned that such forward-looking statements involve known and

unknown risks, uncertainties and other factors that may cause a change in such assumptions and the

actual outcomes and estimates to be materially different from those estimated or anticipated future

results, achievements or position expressed or implied by those forward-looking statements. Risks,

uncertainties and other factors that could cause the Company's plans to change include changes in

demand for and price of gold and other commodities (such as fuel and electricity) and currencies;

changes or disruptions in the securities markets; legislative, political or economic developments in

Brazil; the need to obtain permits and comply with laws and regulations and other regulatory

requirements; the possibility that actual results of work may differ from projections/expectations or

may not realize the perceived potential of the Company's projects; risks of accidents, equipment

breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of

cost overruns or unanticipated expenses in development programs; operating or technical difficulties

in connection with exploration, mining or development activities; the speculative nature of gold

exploration and development, including the risks of diminishing quantities of grades of reserves and

resources; and the risks involved in the exploration, development and mining business. Although

management of the Company has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking statements or forward-looking

information, there may be other factors that cause results not to be as anticipated, estimated or

intended. The Company disclaims any intention or obligation to update or revise any forward-looking

statements whether as a result of new information, future events or otherwise, except as required by

applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/250756