Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

TRX.TO ·

TRX Gold Reports More High-Grade Intercepts at Stamford Bridge Zone extended another 25 meters

Drill Results

TRX Gold Reports More High-Grade Intercepts at Stamford Bridge

Zone extended another 25 meters

TORONTO, Jan. 14, 2025 -- TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) (the “Company” or “TRX Gold”) is

excited to announce, once again, another excellent set of drill results, with hole BMDD319 intersecting 21 metres (“m”) @

8.63 g/t Au from 81 m; BMDD320 intersecting 20.50 metres (“m”) @ 5.14 g/t Au from 125.5 m and BMDD321 intersecting 5

metres (“m”) @ 2.74 g/t Au from 157 m. These drill hole results are downdip extensions at the newly discovered and highly

prospective Stamford Bridge Shear Zone (see Figure 1). They are located approximately 250 m east of the Buckreef Main

Zone—host to Buckreef Gold’s 2M+ ounce Au Mineral Resource 1 and where current operations are ongoing in the Main Pit.

These drill hole results come following the Company’s previous drill results, dated October 24 and November 12, 2024,

whereby the Company announced the discovery of a promising new gold mineralization shear zone, named the Stamford

Bridge Zone, at which results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main

Zone.

Significance of this latest drill intercept:

Significant intercept from Hole BMDD319 confirms downdip extension intercepted previously by BMDD310 and is 15 m further

downdip (see Figure 2). Similarly, significant intercept from BMDD320 confirms up-dip extension of previously intercepted zone

by BMDD315;

BMDD321 intercepted the mineralised shear zone further to the northeast 25 m along strike;

These intercepts continue to confirm a “bridge” or an interpreted mineralized shear zone trending 070 degrees East Northeast,

that is showing potential to extend over 1 kilometer. To date, intersections reported over the last few months cover

approximately 150 m of strike length (see Figure 1); and

The Stamford Bridge Zone is a potentially significant shear zone and geologically similar to the Buckreef Main Zone. It is

situated between the Buckreef Main Zone and the Eastern Porphyry deposit and Anfield Zone, to the Southeast (see Figure 1).

Stephen Mullowney, TRX Gold CEO continues, “The Stamford Bridge Shear Zone keeps delivering! This initial exploration work

is paying off thus far and we are eager to launch the ground geophysical survey over the next few weeks, which is expected to

support some very targeted drilling.”

Figure 1.  Location of latest drill holes among previous results at the Stamford Bridge Zone

Figure 2. Cross-sections 50 metres apart; results from new drill holes BMDD319 and BMDD320 - Stamford Bridge

Zone

Table 1: Summary of Results – Stamford Bridge  

Hole ID Hole

Type

Drill Holes Location

Sample

Depth Width

(m)

Assay

Grade

(gpt)

Lithology CommentEasting

(m)

Northing

(m)

RL

(m) Azimuth Dip From

(m)

To

(m)

BMGT001 DD 391,780 9,658,453 1,218 270 -

50 105.0 115.4 10.4 3.03 Msh

Stamford Bridge

Mineralised shear

zone with strong

alteration

              186.6 208.0 21.4 2.42 Msh  

              393.0 425.8 32.8 1.70 Msh Buckreef main

shearzone

BMDD309 DD 391,676 9,658,400 1,217 334 -

60 101.8 104.5 2.7 1.65 Msh  

BMDD310 DD 391,723 9,658,418 1,217 334 -

60 64.5 100.0 35.5 5.48 Msh

Mineralised shear

zone with strong

alteration

BMDD312 DD 391,685 9,658,382 1,216 335 -

60 164.6 180.8 16.2 3.14 Msh

Mineralised shear

zone with strong

alteration

BMDD315 DD 391,770 9,658,435 1,217 335 -

60 130.0 166.0 36.0 7.04 Msh

Mineralised shear

zone with strong

alteration

BMDD319 DD 391,729 9,658,404 1,217 335 -

60 76.0 79.0 3.0 1.21 Msh

Mineralised shear

zone with strong

alteration

BMDD319 DD 391,729 9,658,404 1,217 335 -

60 81.0 102.0 21.0 8.63 Msh

Mineralised shear

zone with strong

alteration

BMDD320 DD 391,765 9,658,447 1,218 335 -

60 125.5 146.0 20.5 5.14 Msh

Mineralised shear

zone with strong

alteration

BMDD321 DD 391,790 9,658,441 1,218 335 -

60 157.0 162.0 5.0 2.74 Msh

Mineralised shear

zone with strong

alteration

The sample chain of custody is managed by the Buckreef geology team on site. Reported results are from diamond drilled

core samples.  Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the

Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled

core has been a HQ size and recoveries are consistently 100% across all drill holes intercept reported

Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The

QAQC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold

analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and

a gravimetric finish performed for assays greater than 10 grams per ton.

Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is

ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and

reporting.

The results summarized in this release are from Stamford Bridge target. The intercepts confirm an interpreted mineralized

shear zone trending 070 degrees East Northeast that is over a km long. The intersections reported here has covered only

the first 150m strike length, they are down-hole lengths and may not represent true width, however the true width is

estimated to be between 50% - 60% of the length.

Qualified Person

Mr. William van Breugel, P.Eng, BASc (Hons), technical Advisor to TRX Gold Corporation, is the Company’s Qualified Person

under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes

responsibility for the scientific and technical content in this press release.

Sample Protocol QA/QC

The sample chain of custody is managed by the Buckreef geology team on site. Reported results are from diamond drilled

core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the

Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core

has been a HQ size and recoveries are consistently 100% across all drill holes intercept reported.

Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QAQC

program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses

are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a

gravimetric finish performed for assays greater than 10 grams per tonne.

Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is

ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and

reporting.

The results summarized in this release are from Stamford Bridge target. The intercepts confirm an interpreted shear zone

trending 070 degrees East Northeast that is over a km long. The intersections reported here has covered only the first 150m

strike length, they are down-hole lengths and may not represent true width, however the true width is estimated to be between

50% - 60% of the length.

About TRX Gold Corporation

TRX Gold is rapidly advancing the Buckreef Gold Project. Anchored by a Mineral Resource published in May 2020, the project

currently hosts a Measured and Indicated Mineral Resource of 35.88 MT at 1.77 g/t gold containing 2,036,280 oz of gold and

an Inferred Mineral Resource of 17.8 MT at 1.11g/t gold for 635,540 oz of gold. The leadership team is focused on creating

both near-term and long-term shareholder value by increasing gold production to generate positive cash flow. The positive cash

flow will be utilized for exploratory drilling with the goal of increasing the current gold Resource base and advancing the

Sulphide Ore Project which represents 90% of current gold Resources. TRX Gold’s actions are led by the highest ESG

standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of

presence in Geita Region, Tanzania.

For investor or shareholder inquiries, please contact:

Investor Relations

Christina Lalli

Vice President, Investor Relations

TRX Gold Corporation

+1-438-399-8665

[email protected]

www.TRXgold.com

Forward-Looking and Cautionary Statements

This press release contains certain forward-looking statements as defined in the applicable securities laws. All statements,

other than statements of historical facts, are forward-looking statements. Forward-looking statements are frequently, but not

always, identified by words such as “expects”, “anticipates”, “believes”, “hopes”, “intends”, “estimated”, “potential”, “possible”

and similar expressions, or statements that events, conditions or results “will”, “may”, “could” or “should” occur or be achieved.

Forward-looking statements relate to future events or future performance and reflect TRX Gold management’s expectations or

beliefs regarding future events and include, but are not limited to, statements with respect to continued operating cash flow,

expansion of its process plant, estimation of mineral resources, ability to develop value creating activities, recoveries,

subsequent project testing, success, scope and viability of mining operations, the timing and amount of estimated future

production, and capital expenditure.

Although TRX Gold believes the expectations expressed in such forward-looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other

future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of

risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic,

competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations;

fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production

profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and

regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties;

employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the

exploration, development and mining business. These risks are set forth in reports that TRX Gold files with the SEC and the

various Canadian securities authorities. You can review and obtain copies of these filings from the SEC's website at

http://www.sec.gov/edgar.shtml and the Company’s profile on the System for Electronic Document Analysis and Retrieval

(“SEDAR+”) at www.sedarplus.ca.

The disclosure contained in this press release of a scientific or technical nature relating to the Company’s Buckreef Project

has been summarized or extracted from the technical report entitled “The National Instrument 43-101 Independent Technical

Report, Updated Mineral Resource Estimate for the Buckreef Gold Mine Project, Tanzania, East Africa for TRX Gold” with an

effective date (the “Effective Date”) of May 15, 2020 (the “2020 Technical Report”). The 2020 Technical Report was prepared

by or under the supervision Mr. Wenceslaus Kutekwatekwa (Mining Engineer, Mining and Project Management Consultant)

BSc Hons (Mining Eng.), MBA, FSAIMM, of Virimai Projects, and, Dr Frank Crundwell, MBA, PhD, a Consulting Engineer,

each of whom is an independent Qualified Person as such term is defined in NI 43-101. The information contained herein is

subject to all of the assumptions, qualifications and procedures set out in the 2020 Technical Report and reference should be

made to the full details of the 2020 Technical Report which has been filed with the applicable regulatory authorities and is

available on the Company’s profile at www.sedarplus.ca. The Company did not complete any new work that would warrant

reporting material changes in the previously reported Mineral Resource (“MRE”) and Mineral Reserve statements during the

prior reporting period. The 2020 Technical Report follows the CIM Definition Standards on Mineral Resources and Mineral

Reserves (“CIM Definition Standards”) and the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice

Guidelines (“CIM Guidelines”).

The information contained in this press release is as of the date of the press release and TRX Gold assumes no duty to

update such information.

The TSX and NYSE America have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents

of this press release, which has been prepared by the management of TRX Gold.

______________________

1 See Forward-Looking and Cautionary Statements

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/2e079f9c-b201-45a5-9303-1f59fac31c59

https://www.globenewswire.com/NewsRoom/AttachmentNg/b58b0eb8-46b5-4a1e-889d-453a219998ee