Tanzanian GOLD Corporation Connecticut Office: Toronto Office:
TANZANIAN GOLD
CORPORATION
CONNECTICUT OFFICE: TORONTO OFFICE:
PO Box 577 Bay Adelaide Centre, East Tower
Sherman, CT 22 Adelaide Street West, Suite 3400
U.S.A. 06784 Toronto, Ontario
Phone : 1.844.364.1830 Canada M5H 4E3
Fax : 1.860.799.0350 Toll Free : 1.844.364.1830
News Release – May 30, 2019
Tanzanian Gold Announces End of Phase I In-Pit Drilling Program.
The final three holes of this phase intersected significant intervals of continuous gold
mineralization. Highlights within the pit include 29.6m @ 2.8 g/t Gold incl. 1.0m @ 47.7 g/t
Gold and 21.0m @ 2.8 g/t Gold incl. 1.0m @ 19 g/t Gold and Highlights Outside and Below
the pit include 89.6m @ 1.5 g/t Gold incl. 2.0m @ 16.6 g/t Gold
TORONTO, May 30, 2019 (GLOBE NEWSWIRE) -- Ta nzanian Gold Corporation (TSX:TNX) (NYSE
American:TRX) (the "Company”) is pleased to announ ce results from three holes that bring to an end
Phase I of the in-pit drilling program. On January 10, 2019, the company announced a three Phase drilling
program at the Buckreef Gold project. The prim ary objective of Phase I was to upgrade Inferred
Resources within the open pit, as defined in the J une 26, 2018 43-101 Pre-Feasibility Study, as well as to
add additional ounces to the pit. In total approxima tely 4,700m where drilled in the Phase I pit infill
drilling program.
Mr. James Sinclair, Tanzanian Gold Corporation (T RX) Executive Chairman sai d of the Phase I results,
“Our open pit and the substantive mineralized zon es we are confirming both in, and below the pit
continue to impress. I believe we are seeing our thesi s of wider, deeper, richer being confirmed as we
progress our drilling program from Phase I into Phase II. Intersecting 89.6 meters or approximately 294
feet of continuous gold mineraliza tion outside and below the pit is spectacular and bodes well for our
future”.
Hole U22-1 was a diamond drill hole that went throu gh the open pit and continued outside and below the
current pit bottom. Both Hole L19-1 and PBR011 were RC holes that were in the open pit. Each of these
three holes intersected significant intervals of conti nuous gold mineralization ranging from 89.6 m to two
intersections of about 30m and to th ree intersections in the range of 17m - 21.0m. Also notable is the fact
that many of these intersections were at an averag e gold grade that is significantly higher than the
weighted gold grade of 1.5 g/t for the entire open pit.
Intersections from Hole U22-1 are shown from inside the open pit and from below the pit bottom which is
approximately 210m from surface. Several notable inte rsections; such as 9.4m @ 6.5 g/t Au and 5.0m @
7.7 g/t Au were encountered approximately 120m be low the pit bottom. Significant intersections were
also found below the open pit bottom in Hole 13-3, th e first hole of Phase II, as reported in the company's
press release of May 1, 2019. All remaining holes in Ph ase II will be testing for mineralization at various
levels below the open pit bottom.
Significant intercepts from the last three holes of Phase I are:
Hole U22-1
Inside the Open Pit:
29.6m grading @ 2.8 g/t Au starting at 81.5m; including
3.7m grading @ 19.5 g/t Au from 84m, including
1.0m grading @ 47.7 g/t Au at 86m
Outside & Below Open Pit:
89.6m grading @ 1.5 g/t Au starting at 147m, including
9.4m grading @ 6.5 g/t Au from 261.8m, including
6.2m grading @ 8.5 g/t Au from 265m, including
2.0m grading 16.6 g/t Au starting at 267m
5.0m grading 7.7 g/t Au from 274m, including
3.1m grading @ 11.2 g/t Au at 274.9m
Hole L19-1
31.0m grading @ 1.3 g/t Au starting at140 m, including
7m grading @ 2.6 g/t Au starting at 140m, including
1.0m grading @ 6.7 g/t Au at 142m; and
7m grading @ 1.4 g/t Au starting at 151m; and
7m grading @ 1.8 g/t Au starting at 164 m
17m grading @ 1.5 g/t Au starting at 215m including
8.0m grading at 2.2 g/t Au starting at 221m
Hole PBR011
21.0m grading @ 2.8 g/t Au starting at 143m, including
o 2.0m grading at 12.1 g/t Au from 162m, including
1.0m grading @ 19 g/t Au at 163m
The intersections reported here are a down-hole lengt h and may not represent true width, but the true
width is estimated to be 50 – 60%.
Mr. Jim Sinclair, Chairman (TRX) commented, “ We have reached a significant milestone with the
completion of the Phase I program. The assay result s and the geological information from Phase I will be
incorporated into a Resource - Geological Model that will also incorporate results from previous drilling
as well as information received from the remaining 2 phases of our current drill program.
Mr. Sinclair continued, "I believe that the resu lts from Phase I could add more ounces to the pit as
defined in our positive Pre-Feasibility Study." Mr. Sinc lair concluded " I am also particularly pleased
with the early results from Phase II which are findi ng quality intersection below the bottom of the open
pit. The results including U22-1 announced today gi ve indications of strong mineralization, gold values
and most importantly, impressive widths. The future of the Buckreef Project has never looked brighter”.
Sample Protocol and QA/QC
The sample chain of custody is managed by the Buckreef technical team under the supervision of
Anthony Minde. Gold analyses reported in this rel ease were performed by standard fire assay using a
50-gram charge with atomic absorption finish (0.01p pm LLD) and a gravimetric finish for assays greater
than 10 grams per tonne. All assays were performed by Nesch Mintech Laboratory in Mwanza.
Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control
program. The QAQC program includes duplicate samples, blanks and analytical standards.
Intervals of core to be analyzed are split in half w ith a mechanized core cutter, with one half sent to
the Laboratory for geochemical analysis and the remain ing half kept in storage for future reference and
uses.
Nesch Mintech Laboratory is ISO 90001 and 17025 accredited and employs a Laboratory Information
Management System for sample tracking, quality control and reporting.
Qualified Person
The Company’s Qualified Person, Mr. Peter Zizhou, h as reviewed and approved the contents of this
news release. Mr. Zizhou has a Master of Scie nce (Exploration Geology) degree from the University
of Zimbabwe (2000) and is a registered professional natural scientist with SACNASP (Reg. No.
400028/08).
Respectfully Submitted,
"James E. Sinclair"
James E. Sinclair
Executive Chairman
For further information, please contact Investor Relations at 1-800-811-3855
Visit our website: www.tangoldcorp.com
The Toronto Stock Exchange and NYSE MKT LLC have not reviewed and do not accept responsibility for the adequacy or
accuracy of this release
Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission limits disclosure for U.S.
reporting purposes to mineral deposits that a company can economically and legally extract or produce. We use certain
terms on this news release, such as “reserves”, “resources”, “geologic resources”, “proven”, “probable”, "measured",
"indicated", or "inferred" which may not be consistent with the reserve definitions established by the SEC. U.S.
Investors are urged to consider closely the disclosure in ou r SEC filings. You can review and obtain copies of these
filings from the SEC's website at http://www.sec.gov/edgar.shtml
This news release contains certain forward-looking statements and forward-looking information. All statements, other than
statements of historical fact, included herein are forward-l ooking statements and forward-looking information that involve
various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results a nd
future events could differ materially from those anticipated in such statements. Important factors that could cause actual resu lts
to differ materially from the Company's expectations are disclosed in the Company's documents filed from time-to-time with the
British Columbia, Alberta and Ontario provincial securities regulatory authorities.
Certain information presented in this release may constitute “forward-looking statements” within the meaning of the Private
Securities Litigation Reform Act of 1995. Such forward-looking statements ar e based on numerous assumptions, and involve
known and unknown risks, uncertainties and othe r factors, including risks inherent in mineral exploration and development,
which may cause the actual results, performance, or achievements of the Company to be materially different from any projected
future results, performance, or achievements expressed or implied by such forward-l ooking statements. Investors are referred to
our description of the risk factors affecting the Company, as contained in our SEC filings, including our annual report on Form
20-F and Registration Statement on Form F-10, as amended, for more information concerning these risks, uncertainties, and
other factors.